Crossrail tunnelling complete
|
Crossrail tunnelling complete
|
Crossrail tunnelling complete
On Fri, 05 Jun 2015 11:34:33 -0500,
wrote: In article , (Roland Perry) wrote: In message , at 11:06:58 on Fri, 5 Jun 2015, e27002 aurora remarked: and are you happy to reduce the service frequency west of Slough as a result? Not at all. But, one would be delighted to see more trains west of Westbourne Park. The number of trains in the core is fixed, so not much prospect of movement there. The reduction would be west of Slough, on account of trains going to Windsor rather than Maidenhead. Are you unaware of the 14tph reversing @ Westbourne Park? I knew some would be reversing at Paddington, but with only 8tph from each of the branches to the east, that only leaves 2tph which seems too few. There will be 24tph through the core but only 10 will continue past Paddington. Thank you. That fits with what I have read. |
Crossrail tunnelling complete
Roland Perry wrote:
In message , at 11:34:33 on Fri, 5 Jun 2015, remarked: I knew some would be reversing at Paddington, but with only 8tph from each of the branches to the east, that only leaves 2tph which seems too few. There will be 24tph through the core but only 10 will continue past Paddington. Where are they starting from? In the peak, 12 each per hour from both eastern branches. Of these, ten proceed beyond Paddington. Off peak, six from Shenfield, eight from Abbey Wood. Six proceed beyond Paddington. See http://www2.ealing.gov.uk/ealing3/ex...Appendix_2.pdf |
Crossrail tunnelling complete
In article , (Roland
Perry) wrote: In message , at 11:34:33 on Fri, 5 Jun 2015, remarked: I knew some would be reversing at Paddington, but with only 8tph from each of the branches to the east, that only leaves 2tph which seems too few. There will be 24tph through the core but only 10 will continue past Paddington. Where are they starting from? My impression is that Abbey Wood has 8tph and they hope Shenfield will also have 8tph despite only currently having permission to do 6tph. Those are off-peak figures I think. There are only 16 through the core then. -- Colin Rosenstiel |
Crossrail tunnelling complete
wrote:
In article , (Roland Perry) wrote: In message , at 11:34:33 on Fri, 5 Jun 2015, remarked: I knew some would be reversing at Paddington, but with only 8tph from each of the branches to the east, that only leaves 2tph which seems too few. There will be 24tph through the core but only 10 will continue past Paddington. Where are they starting from? My impression is that Abbey Wood has 8tph and they hope Shenfield will also have 8tph despite only currently having permission to do 6tph. Those are off-peak figures I think. There are only 16 through the core then. See my post upthread: 14 tph off-peak, 24 peak. |
Crossrail tunnelling complete
In message
-septem ber.org, at 20:25:58 on Fri, 5 Jun 2015, Recliner remarked: Are you unaware of the 14tph reversing @ Westbourne Park? I knew some would be reversing at Paddington, but with only 8tph from each of the branches to the east, that only leaves 2tph which seems too few. There will be 24tph through the core but only 10 will continue past Paddington. Where are they starting from? In the peak, 12 each per hour from both eastern branches. Of these, ten proceed beyond Paddington. Off peak, six from Shenfield, eight from Abbey Wood. Six proceed beyond Paddington. The tourist demand to Windsor would be off-peak, so it would be abstracting from the six-beyond-Paddington, which actually means none to Maidenhead. Unless the "Orange" service was extended to all day and sent to Windsor, replacing 2tph of the Paddington terminators. Which is quite a big change to the pattern. -- Roland Perry |
Crossrail tunnelling complete
In message
-septem ber.org, at 23:36:37 on Fri, 5 Jun 2015, Recliner remarked: My impression is that Abbey Wood has 8tph and they hope Shenfield will also have 8tph despite only currently having permission to do 6tph. Those are off-peak figures I think. There are only 16 through the core then. See my post upthread: 14 tph off-peak, 24 peak. Crossrail are hoping to run 8tph offpeak from Shenfield, despite currently only having permission to run six. -- Roland Perry |
Crossrail tunnelling complete
On Sat, 6 Jun 2015 08:21:50 +0100, Roland Perry
wrote: In message -septem ber.org, at 23:36:37 on Fri, 5 Jun 2015, Recliner remarked: My impression is that Abbey Wood has 8tph and they hope Shenfield will also have 8tph despite only currently having permission to do 6tph. Those are off-peak figures I think. There are only 16 through the core then. See my post upthread: 14 tph off-peak, 24 peak. Crossrail are hoping to run 8tph offpeak from Shenfield, despite currently only having permission to run six. As Crossrail will be the main (only?) operator on the slow lines to Shenfield, who is it that is limiting the service? |