![]() |
Crossrail tunnelling complete
In message , at 13:18:31 on
Sun, 7 Jun 2015, Recliner remarked: Crossrail are hoping to run 8tph offpeak from Shenfield, despite currently only having permission to run six. As Crossrail will be the main (only?) operator on the slow lines to Shenfield, who is it that is limiting the service? ORR. -- Roland Perry |
Crossrail tunnelling complete
Roland Perry wrote:
In message , at 13:18:31 on Sun, 7 Jun 2015, Recliner remarked: Crossrail are hoping to run 8tph offpeak from Shenfield, despite currently only having permission to run six. As Crossrail will be the main (only?) operator on the slow lines to Shenfield, who is it that is limiting the service? ORR. Who else is competing to use the line? |
Crossrail tunnelling complete
In message
-septem ber.org, at 14:48:38 on Sun, 7 Jun 2015, Recliner remarked: Crossrail are hoping to run 8tph offpeak from Shenfield, despite currently only having permission to run six. As Crossrail will be the main (only?) operator on the slow lines to Shenfield, who is it that is limiting the service? ORR. Who else is competing to use the line? The Greater Anglia franchise holder is running trains to Southend, Braintree etc. They are fast to Shenfield though. The ORR's stance may be aimed more at having a 10-minute clockface timetable and reducing the subsidy if they think 6tph is adequate for the passenger numbers. -- Roland Perry |
All times are GMT. The time now is 03:18 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk