On Fri, 31 Jul 2015 14:41:50 +0000 (UTC), Recliner
wrote: http://www.thameslinkprogramme.co.uk...train-arrives/ Claire Perry is really churning out those "I welcome these new trains..." press releases this week. It reminds me of the Class 70. Is there some kind of serious buffer underneath the fibreglass? |
#12
![]() |
|||
|
|||
![]() What's the significance of the numbering been in the 700s? |
#13
![]() |
|||
|
|||
![]()
On 31.07.15 17:02, Recliner wrote:
" wrote: On 31.07.15 15:41, Recliner wrote: http://www.thameslinkprogramme.co.uk...train-arrives/ Claire Perry is really churning out those "I welcome these new trains..." press releases this week. Will the ATO on them be operative when they enter revenue service? It may be on the trains, but I don't think the new signalling will be live in the TL core next year. I did not think so. ETA? |
#14
![]() |
|||
|
|||
![]()
" wrote:
On 31.07.15 17:02, Recliner wrote: " wrote: On 31.07.15 15:41, Recliner wrote: http://www.thameslinkprogramme.co.uk...train-arrives/ Claire Perry is really churning out those "I welcome these new trains..." press releases this week. Will the ATO on them be operative when they enter revenue service? It may be on the trains, but I don't think the new signalling will be live in the TL core next year. I did not think so. ETA? Probably 2018: David states: “By using ATO, with the underlying Automatic Train Protection (ATP) provided by ETCS, the core section will safely support trains passing at 2.5min headways, and enable service recovery mode with headways of just two minutes, when necessary. However, the technology must first undergo an extensive period of testing. “This is the first time ATO will be used with ETCS, or indeed on any mainline in this country, so there has been a lot of work to reach this stage. It is vital that we get this right. “There are a lot of system integration aspects to consider, such as with the new rolling stock that will be introduced from 2016. So whilst we will commence technology testing with a Class 313 test train in March, we will not get to test with the Class 700, the train being built for Thameslink, until next year.” This means that the switch to ATO will not take place until late 2017 at the earliest. However, it will be in place for the programme’s completion in 2018, which is when the five-year rebuild of London Bridge also comes to a close. ______ http://rail.ricardo.com/en/Blogs/Art...ink-signalling |
#15
![]() |
|||
|
|||
![]()
In message
-septem ber.org, at 14:41:50 on Fri, 31 Jul 2015, Recliner remarked: http://www.thameslinkprogramme.co.uk...train-arrives/ Claire Perry is really churning out those "I welcome these new trains..." press releases this week. 4 cars, when I thought 700's were going to be in fixed 8 and 12 car formations. -- Roland Perry |
#17
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message -septem ber.org, at 14:41:50 on Fri, 31 Jul 2015, Recliner remarked: http://www.thameslinkprogramme.co.uk...train-arrives/ Claire Perry is really churning out those "I welcome these new trains..." press releases this week. 4 cars, when I thought 700's were going to be in fixed 8 and 12 car formations. It's a 12-car train, delivered in three sets of four. They couldn't run as an independent train that way. |
#18
![]() |
|||
|
|||
![]() |
#19
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message , at 02:30:21 on Sat, 1 Aug 2015, remarked: 4 cars, when I thought 700's were going to be in fixed 8 and 12 car formations. Yes! I looked at the pictures and wondered where the other cars were I suppose if they want to use it for testing, a short-formed one is going to be almost as good as a regular one. I think it will be tested as a 12-car; the split into three sets of four cars was just for delivery. |
#20
![]() |
|||
|
|||
![]()
On 2015\07\31 15:41, Recliner wrote:
http://www.thameslinkprogramme.co.uk...train-arrives/ Claire Perry is really churning out those "I welcome these new trains..." press releases this week. Why doesn't their class number start with a 3? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Class 700 ETCS level 2 tested in Thameslink core | London Transport | |||
Lego bus stop arrives in Regent Street, London | London Transport | |||
Coombe Road Norbiton railway bridges | London Transport | |||
Thameslink Train Arrives On Time | London Transport | |||
Replacement rail and road bridges in Kent | London Transport |