West Croydon Bus Station
Opening tomorrow (Saturday).
The re-building was due to take 18 months. I don''t know if that is how long it has actually taken, because I can't remember when it closed. Why did it take so long to re-build such a small structure? There seemed to be a long gap between the demolition of the old station and the construction of the new one, but a long closure was planned. |
Quote:
|
West Croydon Bus Station
On 08/10/2016 10:42, Robin9 wrote: ;158600 Wrote: Opening tomorrow (Saturday). The re-building was due to take 18 months. I don''t know if that is how long it has actually taken, because I can't remember when it closed. Why did it take so long to re-build such a small structure? There seemed to be a long gap between the demolition of the old station and the construction of the new one, but a long closure was planned. Is it a TfL project? If it is, there's your answer. Idiotic non-answer. |
All times are GMT. The time now is 06:40 AM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk