Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#21
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message -sept ember.org, at 23:28:08 on Wed, 30 May 2018, Recliner remarked: http://www.railwaygazette.com/news/s...o-takeoff.html "Because Heathrow Connect services will not be advertised as through trains and will always be overtaken en route, Murphy believes most London - Heathrow passengers will continue to use the fast trains. There will be no through tickets other than the full Heathrow Express fares." Thanks, that's an interesting article from 14 years ago. It's an interesting reminder of how projects slip even when they're not notoriously delayed: "In the longer term, Heathrow Connect may be absorbed by Crossrail Line 1, which plans to operate four trains/h into Heathrow Airport from around 2014. BAA Rail is also pushing ahead with the Airtrack project to extend the Terminal 5 branch to carry local services to and from the southwest suburbs." So the full Crossrail 1 will finally run to Heathrow more than five years later than was expected back in 2004, and Airtrack is still no more than a (renamed) concept, with no possibility of opening before 2030. BAA was issuing maps in 1998 showing Heathrow Express to St Pancras [via West Hampstead] "From 2001", plus undated Airtrack and the western link to GWML. London Underground in 1995, were claiming St Pancras would open for Channel Tunnel traffic in 2002 and the Jubilee Line extension to Stratford by 1998. That was close: it opened in 1999. Crossrail was "planned" (no date given). Other projects included the Croxley Rail link, the East London Line Extension (finally opened in 2010), and the least delayed item the Heathrow T5 station, opened in 2008 versus a predicted 2003. At least it opened along with the terminal. |
#22
![]() |
|||
|
|||
![]() "Roland Perry" wrote in message ... In message plbugd5l9bn063hcp5efr64251h2eoor4q@None, at 17:09:24 on Wed, 30 May 2018, Arthur Conan Doyle remarked: Roland Perry wrote: You'd probably have to look for Heathrow Airport strategic travel plans. This article is quite dated, and I'm not sure the detail about fares is still valid, but it does show there was intent to protect HX. With respect to airline passengers. That leaves airport workers (who get subsidised fares too). Surely the point about airport workers is that they are going to be making a journey from one of the local stations Almost none of them are going to be doing a journey for which a fast service from Padd is helpful tim |
#23
![]() |
|||
|
|||
![]()
In message
-sept ember.org, at 08:20:54 on Thu, 31 May 2018, Recliner remarked: London Underground in 1995, were claiming St Pancras would open for Channel Tunnel traffic in 2002 and the Jubilee Line extension to Stratford by 1998. That was close: it opened in 1999. "Construction officially started in December 1993, expected to take 53 months [#8, which is Hansard June 1993]." (Wikipedia) 1/1/93+53mths = Jun97; thus I suspect the "by 1998" above was an attempt to convey "might slip to the end of 1997". I'll give the benefit of the doubt to Wikipedia that subsequent dates quoted are a correct reflection of the cites... "By November 1997 a September 1998 date was planned.[10] By June 1998, opening was planned in Spring 1999.[11] By November 1998, a phased opening, previously rejected, was being considered, with Stratford to North Greenwich planned for spring 1999, to Waterloo for summer 1999, and the link to the Jubilee line for autumn 1999.[12][13] This scheme was followed, with the first phase opening on 14 May 1999, the second on 24 September, and the third on 20 November. Westminster, complicated by the interface with the subsurface platforms, which remained in operation, opened on 22 December 1999, shortly before the Millennium Dome deadline". So yes, a gentle slide, rather than a major calamity. -- Roland Perry |
#24
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message -sept ember.org, at 08:20:54 on Thu, 31 May 2018, Recliner remarked: London Underground in 1995, were claiming St Pancras would open for Channel Tunnel traffic in 2002 and the Jubilee Line extension to Stratford by 1998. That was close: it opened in 1999. "Construction officially started in December 1993, expected to take 53 months [#8, which is Hansard June 1993]." (Wikipedia) 1/1/93+53mths = Jun97; thus I suspect the "by 1998" above was an attempt to convey "might slip to the end of 1997". Er, Dec 1993 isn't 1/1/93. 53 months after Dec 1993 would be April 1998. I'll give the benefit of the doubt to Wikipedia that subsequent dates quoted are a correct reflection of the cites... "By November 1997 a September 1998 date was planned.[10] By June 1998, opening was planned in Spring 1999.[11] By November 1998, a phased opening, previously rejected, was being considered, with Stratford to North Greenwich planned for spring 1999, to Waterloo for summer 1999, and the link to the Jubilee line for autumn 1999.[12][13] This scheme was followed, with the first phase opening on 14 May 1999, the second on 24 September, and the third on 20 November. Westminster, complicated by the interface with the subsurface platforms, which remained in operation, opened on 22 December 1999, shortly before the Millennium Dome deadline". So yes, a gentle slide, rather than a major calamity. The bigger slippage was the signalling. The originally planned moving block signalling had to be hurriedly replaced by conventional signalling so as to get the extension open during 1999, just in time for the hard deadline of the midnight party in the big tent. In fact, they only got the moving block signalling working in mid 2011, just before the next hard deadline of the London Olympics: http://www.risktec.tuv.com/knowledge-bank/technical-articles/sending-the-right-signals---new-signalling-technology-for-the-jubilee-line.aspx |
#25
![]() |
|||
|
|||
![]()
In message
-sept ember.org, at 10:17:43 on Thu, 31 May 2018, Recliner remarked: Roland Perry wrote: In message -sept ember.org, at 08:20:54 on Thu, 31 May 2018, Recliner remarked: London Underground in 1995, were claiming St Pancras would open for Channel Tunnel traffic in 2002 and the Jubilee Line extension to Stratford by 1998. That was close: it opened in 1999. "Construction officially started in December 1993, expected to take 53 months [#8, which is Hansard June 1993]." (Wikipedia) 1/1/93+53mths = Jun97; thus I suspect the "by 1998" above was an attempt to convey "might slip to the end of 1997". Er, Dec 1993 isn't 1/1/93. 53 months after Dec 1993 would be April 1998. True, I really meant 1/1/94 (I doubt they did much over the Xmas break), so we appear to have converged on "by the end of Q2 1998". I'll give the benefit of the doubt to Wikipedia that subsequent dates quoted are a correct reflection of the cites... "By November 1997 a September 1998 date was planned.[10] By June 1998, opening was planned in Spring 1999.[11] By November 1998, a phased opening, previously rejected, was being considered, with Stratford to North Greenwich planned for spring 1999, to Waterloo for summer 1999, and the link to the Jubilee line for autumn 1999.[12][13] This scheme was followed, with the first phase opening on 14 May 1999, the second on 24 September, and the third on 20 November. Westminster, complicated by the interface with the subsurface platforms, which remained in operation, opened on 22 December 1999, shortly before the Millennium Dome deadline". So yes, a gentle slide, rather than a major calamity. The bigger slippage was the signalling. The originally planned moving block Biggest cause of the slippage, perhaps, but every project will have one of those, and it's failing to allow for that inevitability which is the downfall of most such early predictions. -- Roland Perry |
#26
![]() |
|||
|
|||
![]() CALL OR TEXT or watsapp ....+17546663823 Wickr id............budsman35 hello we are leading suppliers of pharmaceutical product meds online we operate on daily and retails basis and very reliable and our product are 100% top quality am ready to supply on large and smaller orders and i am looking in building a strong business relationship with potential client around the world i do world wide delivery and delivery is guarantee. see price list offer and pm me or you can get me on whatsapp FOR ZOLPICLONE 7.5MG SMALLER ORDER 250 tabs..........................£90 500 tabs...........................£150 1000 tabs.........................£250 2500 tabs.........................£350 5000 tabs.........................£500 7500 tabs.........................£700 10000 tabs........................£850 15000 tabs........................£1200 25000 tabs........................£1500 FOR DIAZEPAM SHALINA BRAND diazepam 10mg 500pills £100 diazepam 10mg 300pills £70 diazepam 10mg 1000pills £150 diazepam 10mg 5000pills £350 diazepam 5mg 1000pills £120 diazepam 5mg 5000pills £300 diazepam 5mg 10000pills £500 diazepam 10mg 10000pills £700 FOR ROCHE DIAZEPAMS 10MG SMALLER ORDER 250 tabs..........................£90 500 tabs...........................£150 1000 tabs.........................£250 2500 tabs.........................£350 5000 tabs.........................£500 7500 tabs.........................£700 10000 tabs........................£850 15000 tabs........................£1200 25000 tabs........................£1500 TEVA 10MG DIAZEPAMS SMALLER ORDER 250 tabs...........................£90 500 tabs...........................£150 1000 tabs.........................£250 2500 tabs.........................£350 5000 tabs.........................£500 7500 tabs.........................£700 10000 tabs.......................£850 15000 tabs.......................£1200 25000 tabs.......................£1500 Ketamine hcl liquid 50mg/10mg 5 bottles/vials..........$200 10 bottles/vials.........$300 15 bottles/vials.........$350 20 bottles/vials.........$400 25 bottles/vials.........$600 50 bottles/vials.........$800 75 bottles/vials.........$1000 100 bottles/vials.........$1500 150 bottles/vials.........$2000 200 bottles/vials.........$2500 .. ketamine £20 each vial/1g ketamine powder each gram £25 FOR TRAMADOL APPLE FLAVOUR tramadol 50mg 250pills £80 tramadol 100mg 300pills £90 tramadol 225mg 300pills £120 tramadol 50mg 500pills £130 tramadol 100mg 500pills £140 tramadol 250mg 500pills £150 tramadol 50mg 1000pills £200 tramadol 100mg 1000pills £220 tramadol 250mg 1000pills £250 FOR TRAMADOL BULK ORDER tramadol 50mg 5000pills £450 tramadol 100mg 5000pills £550 tramadol 250mg 5000pills £700 i also have my delivery records all around the worlds and i providedated pictures with buyers name and my name CALL US OR TEXT ....+17546663823 email for detailsi supply more than the quantity listed,i give additional discount to more larger ordersi look forward in doing great business with reliable buyersthanks email for details burdsman35 CALL OR TEXT or watsapp ....+17546663823 Wickr id............budsman35 Email : |
#27
![]() |
|||
|
|||
![]()
Website..........https://www.tramax-shop.com/
Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/ Website.........https://www.tramax-shop.com/contact-us/ CALL OR TEXT or watsapp ....+15088120377 WEBSITE.................https://www.tramax-shop.com/ hello we are leading suppliers of pharmaceutical product meds online we operate on daily and retails basis and very reliable and our product are 100% top quality am ready to supply on large and smaller orders and i am looking in building a strong business relationship with potential client around the world i do world wide delivery and delivery is guarantee. see price list offer and pm me or you can get me on whatsapp - show quoted text - Ketamine hcl liquid 50mg/10mg 5 bottles/vials..........$200 10 bottles/vials.........$300 15 bottles/vials.........$350 20 bottles/vials.........$400 25 bottles/vials.........$600 50 bottles/vials.........$800 75 bottles/vials.........$1000 100 bottles/vials.........$1500 150 bottles/vials.........$2000 200 bottles/vials.........$2500 .. ketamine £20 each vial/1g ketamine powder each gram £25 FOR TRAMADOL APPLE FLAVOUR tramadol 50mg 250pills £80 tramadol 100mg 300pills £90 tramadol 225mg 300pills £120 tramadol 50mg 500pills £130 tramadol 100mg 500pills £140 tramadol 250mg 500pills £150 tramadol 50mg 1000pills £200 tramadol 100mg 1000pills £220 tramadol 250mg 1000pills £250 FOR TRAMADOL BULK ORDER tramadol 50mg 5000pills £450 tramadol 100mg 5000pills £550 tramadol 250mg 5000pills £700 i also have my delivery records all around the worlds and i providedated pictures with buyers name and my name CALL US OR TEXT ....+17546663823 email for detailsi supply more than the quantity listed,i give additional discount to more larger ordersi look forward in doing great business with reliable buyersthanks email for details CALL OR TEXT or watsapp ....+15088120377 Website..........https://www.tramax-shop.com/ Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/ Website.........https://www.tramax-shop.com/contact-us/ CALL OR TEXT or watsapp ....+15088120377 WEBSITE.................https://www.tramax-shop.com/ |
#28
![]() |
|||
|
|||
![]()
Website..........https://www.tramax-shop.com/
Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/ Website.........https://www.tramax-shop.com/contact-us/ CALL OR TEXT or watsapp ....+15088120377 WEBSITE.................https://www.tramax-shop.com/ hello we are leading suppliers of pharmaceutical product meds online we operate on daily and retails basis and very reliable and our product are 100% top quality am ready to supply on large and smaller orders and i am looking in building a strong business relationship with potential client around the world i do world wide delivery and delivery is guarantee. see price list offer and pm me or you can get me on whatsapp - show quoted text - Ketamine hcl liquid 50mg/10mg 5 bottles/vials..........$200 10 bottles/vials.........$300 15 bottles/vials.........$350 20 bottles/vials.........$400 25 bottles/vials.........$600 50 bottles/vials.........$800 75 bottles/vials.........$1000 100 bottles/vials.........$1500 150 bottles/vials.........$2000 200 bottles/vials.........$2500 .. ketamine £20 each vial/1g ketamine powder each gram £25 FOR TRAMADOL APPLE FLAVOUR tramadol 50mg 250pills £80 tramadol 100mg 300pills £90 tramadol 225mg 300pills £120 tramadol 50mg 500pills £130 tramadol 100mg 500pills £140 tramadol 250mg 500pills £150 tramadol 50mg 1000pills £200 tramadol 100mg 1000pills £220 tramadol 250mg 1000pills £250 FOR TRAMADOL BULK ORDER tramadol 50mg 5000pills £450 tramadol 100mg 5000pills £550 tramadol 250mg 5000pills £700 i also have my delivery records all around the worlds and i providedated pictures with buyers name and my name CALL US OR TEXT ....+17546663823 email for detailsi supply more than the quantity listed,i give additional discount to more larger ordersi look forward in doing great business with reliable buyersthanks email for details CALL OR TEXT or watsapp ....+15088120377 Website..........https://www.tramax-shop.com/ Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/ Website.........https://www.tramax-shop.com/contact-us/ CALL OR TEXT or watsapp ....+15088120377 WEBSITE.................https://www.tramax-shop.com/ |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|