Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#21
![]() |
|||
|
|||
![]()
It seems that 710 running on GOBLIN has started very quietly:
https://www.youtube.com/watch?v=Z3wHHnLw3pk I must point out to anyone unfamiliar with this stretch of the railway, that the over-use of the zoom distorts enormously the layout of the route. The curve just east of Leytonstone High Road Station is nothing like as severe as suggested and the gradient west of the station does not drop down in the manner shown.. I notice that in the current issue of Rail Christian Wolmar is very critical of the way the GOBLIN electrification has been handled. |
#22
![]() |
|||
|
|||
![]()
On 15/03/2019 12:22, Robin9 wrote:
It seems that 710 running on GOBLIN has started very quietly: https://www.youtube.com/watch?v=Z3wHHnLw3pk I must point out to anyone unfamiliar with this stretch of the railway, that the over-use of the zoom distorts enormously the layout of the route. The curve just east of Leytonstone High Road Station is nothing like as severe as suggested and the gradient west of the station does not drop down in the manner shown.. I notice that in the current issue of Rail Christian Wolmar is very critical of the way the GOBLIN electrification has been handled. So why are they talking about halving frequency from March 18th if the new trains are good to go? Or is that now scrapped? -- Basil Jet - Current favourite song... Spratleys Japs - Hands (Marc Riley session) https://www.youtube.com/watch?v=PTFmVrE1WAc |
#23
![]() |
|||
|
|||
![]() |
#24
![]() |
|||
|
|||
![]()
Mike Bristow wrote:
In article , Basil Jet wrote: So why are they talking about halving frequency from March 18th if the new trains are good to go? Or is that now scrapped? Driver training can now start, AIUI. Of course, that's going to be even more frustrating for passengers suffering a 2tph service, as they watch the empty new trains running through, and even stopping, at their stations without the doors opening. I would have thought it ought to have been possible to train a few Goblin drivers on the new trains while they've been test running on the WCML. That might have allowed a couple (ideally three) of the new trains to enter service next week. |
#25
![]() |
|||
|
|||
![]()
Message boards today at Leyton Midland Road Station
state the frequency will be halved in a few days time. I've yet to see this authorised and functioning 710 so perhaps it's being used for crew training now. |
#26
![]() |
|||
|
|||
![]()
Robin9 wrote:
Message boards today at Leyton Midland Road Station state the frequency will be halved in a few days time. I've yet to see this authorised and functioning 710 so perhaps it's being used for crew training now. Yes. I think they've been test running at night on the line for a few weeks, followed by a diesel Thunderbird loco at first. Presumably it's now reliable enough to run among service trains without an accompanying rescue loco. There have been several units on test, not sure how many on the Goblin. The good news is that if the problems are purely in the TMS software, it shouldn't take long to bring all the delivered units (six?) up to spec. The weekly TfL newsletter says: "From Monday 18 March, there will be a reduced weekday service between Gospel Oak and Barking. Trains will run about every 30 minutes. A reduced service will continue on this route every day until further notice, due to a lack of available trains. For weekday train times, check our temporary timetable. " |
#27
![]() |
|||
|
|||
![]()
On 15/03/2019 21:29, Recliner wrote:
Robin9 wrote: Message boards today at Leyton Midland Road Station state the frequency will be halved in a few days time. I've yet to see this authorised and functioning 710 so perhaps it's being used for crew training now. Yes. I think they've been test running at night on the line for a few weeks, followed by a diesel Thunderbird loco at first. Presumably it's now reliable enough to run among service trains without an accompanying rescue loco. There have been several units on test, not sure how many on the Goblin. The good news is that if the problems are purely in the TMS software, it shouldn't take long to bring all the delivered units (six?) up to spec. The weekly TfL newsletter says: "From Monday 18 March, there will be a reduced weekday service between Gospel Oak and Barking. Trains will run about every 30 minutes. A reduced service will continue on this route every day until further notice, due to a lack of available trains. For weekday train times, check our temporary timetable. " You'd think they would have at least mentioned that the halving of the frequency will be accompanied by a doubling of the train length. -- Basil Jet - Current favourite song... Spratleys Japs - Hands (Marc Riley session) https://www.youtube.com/watch?v=PTFmVrE1WAc |
#28
![]() |
|||
|
|||
![]()
Basil Jet wrote:
On 15/03/2019 21:29, Recliner wrote: Robin9 wrote: Message boards today at Leyton Midland Road Station state the frequency will be halved in a few days time. I've yet to see this authorised and functioning 710 so perhaps it's being used for crew training now. Yes. I think they've been test running at night on the line for a few weeks, followed by a diesel Thunderbird loco at first. Presumably it's now reliable enough to run among service trains without an accompanying rescue loco. There have been several units on test, not sure how many on the Goblin. The good news is that if the problems are purely in the TMS software, it shouldn't take long to bring all the delivered units (six?) up to spec. The weekly TfL newsletter says: "From Monday 18 March, there will be a reduced weekday service between Gospel Oak and Barking. Trains will run about every 30 minutes. A reduced service will continue on this route every day until further notice, due to a lack of available trains. For weekday train times, check our temporary timetable. " You'd think they would have at least mentioned that the halving of the frequency will be accompanied by a doubling of the train length. It's not really: the three 4-car 378s were already in service on the line. All that changes from today is that the last three 172s have gone. |
#29
![]() |
|||
|
|||
![]()
On 16/03/2019 16:19, Recliner wrote:
Basil Jet wrote: On 15/03/2019 21:29, Recliner wrote: Robin9 wrote: Message boards today at Leyton Midland Road Station state the frequency will be halved in a few days time. I've yet to see this authorised and functioning 710 so perhaps it's being used for crew training now. Yes. I think they've been test running at night on the line for a few weeks, followed by a diesel Thunderbird loco at first. Presumably it's now reliable enough to run among service trains without an accompanying rescue loco. There have been several units on test, not sure how many on the Goblin. The good news is that if the problems are purely in the TMS software, it shouldn't take long to bring all the delivered units (six?) up to spec. The weekly TfL newsletter says: "From Monday 18 March, there will be a reduced weekday service between Gospel Oak and Barking. Trains will run about every 30 minutes. A reduced service will continue on this route every day until further notice, due to a lack of available trains. For weekday train times, check our temporary timetable. " You'd think they would have at least mentioned that the halving of the frequency will be accompanied by a doubling of the train length. It's not really: the three 4-car 378s were already in service on the line. All that changes from today is that the last three 172s have gone. It's a doubling of the train lengths present a few months ago. -- Basil Jet - Current favourite song... Spratleys Japs - Hands (Marc Riley session) https://www.youtube.com/watch?v=PTFmVrE1WAc |
#30
![]() |
|||
|
|||
![]()
Yesterday I saw my first real, live 710 in action! I had just arrived
on Platform 1 at Leytonstone High Road, the westbound platform, and a 710 was approaching eastbound at about 45 mph. It went straight through the station and then performed an emergency stop. It stopped very quickly and clearly the 710s have good brakes. I was impressed. After about three seconds, it continued on its way. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Goblin electric trains delayed by three months | London Transport | |||
[OT] Emergency STW demo in London tomorrow | London Transport | |||
LU services tomorrow | London Transport | |||
What is happening tomorrow? | London Transport | |||
Glos Rd to Wembley tomorrow | London Transport |