Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
wrote:
A couple of photos of the first day of 710s on the GOBLIN, 23 May: 710261 at Upper Holloway: https://www.flickr.com/photos/605390...posted-public/ 710269 at Harringay Green Lanes: https://www.flickr.com/photos/605390...posted-public/ The 378s will continue for a while: here's one at South Tottenham: https://www.flickr.com/photos/605390...posted-public/ I think the new trains look much smarter, but it's a pity that the seats haven't been improved to, say, even S stock standards, let alone the much higher standards that prevailed in the 1970s. I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? |
#2
![]() |
|||
|
|||
![]()
Patrick Hearn wrote:
On Saturday, May 25, 2019 at 10:01:17 AM UTC+1, Recliner wrote: wrote: A couple of photos of the first day of 710s on the GOBLIN, 23 May: 710261 at Upper Holloway: https://www.flickr.com/photos/605390...posted-public/ 710269 at Harringay Green Lanes: https://www.flickr.com/photos/605390...posted-public/ The 378s will continue for a while: here's one at South Tottenham: https://www.flickr.com/photos/605390...posted-public/ I think the new trains look much smarter, but it's a pity that the seats haven't been improved to, say, even S stock standards, let alone the much higher standards that prevailed in the 1970s. I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Resilience, possibly? New trains with new software, it might make sense to bed them down in service? Perhaps, though they've been test running them for many months, both off and on the Goblin. They were given ORR authority to enter service on April 11, so about six weeks before they did, finally, carry passengers. One would have thought that several could have been accumulating mileage during that time. Perhaps only two did so without problems? As this soft introduction was without fanfare, I suppose it was still a bit tentative, so perhaps they still don't have much faith in the new trains? |
#3
![]() |
|||
|
|||
![]()
In article ,
Recliner wrote: I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Lack of driver training is the reason I heard. It suprises me, as with only 6 trains required for the service, I'd expect you to need no more than 30 drivers trained on the new trains - and Geoff's 710 intro video said that there were 70 drivers trained. So either the problem isn't driver training, or my guess as to how many drivers would be required is wrong. Cheers, Mike -- Mike Bristow |
#4
![]() |
|||
|
|||
![]()
On Tue, 28 May 2019 13:56:28 +0100
Mike Bristow wrote: In article , Recliner wrote: I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Lack of driver training is the reason I heard. It suprises me, as with only 6 trains required for the service, I'd expect you to need no more than 30 drivers trained on the new trains - and Geoff's 710 intro video said that there were 70 drivers trained. Are these drivers driving 378s on the NLL in the interim or are they being paid to just sit at home and watch Cash in the Attic like the crossrail ones? |
#6
![]() |
|||
|
|||
![]()
Mike Bristow wrote:
["Followup-To:" header set to uk.transport.london.] In article , wrote: On Tue, 28 May 2019 13:56:28 +0100 Mike Bristow wrote: In article , Recliner wrote: I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Lack of driver training is the reason I heard. It suprises me, as with only 6 trains required for the service, I'd expect you to need no more than 30 drivers trained on the new trains - and Geoff's 710 intro video said that there were 70 drivers trained. Are these drivers driving 378s on the NLL in the interim or are they being paid to just sit at home and watch Cash in the Attic like the crossrail ones? They cover the NLL too, according to the video. Having now watched Geoff's video, I was surprised just how many drivers need to be trained in order to operate the six 710 diagrams. |
#7
![]() |
|||
|
|||
![]()
TimB wrote:
On Saturday, June 1, 2019 at 11:06:35 AM UTC+1, Recliner wrote: Mike Bristow wrote: ["Followup-To:" header set to uk.transport.london.] In article , wrote: On Tue, 28 May 2019 13:56:28 +0100 Mike Bristow wrote: In article , Recliner wrote: I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Lack of driver training is the reason I heard. It suprises me, as with only 6 trains required for the service, I'd expect you to need no more than 30 drivers trained on the new trains - and Geoff's 710 intro video said that there were 70 drivers trained. Are these drivers driving 378s on the NLL in the interim or are they being paid to just sit at home and watch Cash in the Attic like the crossrail ones? They cover the NLL too, according to the video. Having now watched Geoff's video, I was surprised just how many drivers need to be trained in order to operate the six 710 diagrams. Not just for the Goblin. The six diagrams are just for the Goblin. The 710s aren't being deployed to other lines until the Goblin is fully switched over to 710s. Basically, the Goblin doesn't have its own driver pool, so all the hundreds of Stratford drivers need to be trained on 710s, which takes quite a while, even running three courses a day, seven days a week. |
#8
![]() |
|||
|
|||
![]()
On Sat, 1 Jun 2019 10:53:05 -0000 (UTC)
Recliner wrote: TimB wrote: On Saturday, June 1, 2019 at 11:06:35 AM UTC+1, Recliner wrote: Mike Bristow wrote: ["Followup-To:" header set to uk.transport.london.] In article , wrote: On Tue, 28 May 2019 13:56:28 +0100 Mike Bristow wrote: In article , Recliner wrote: I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Lack of driver training is the reason I heard. It suprises me, as with only 6 trains required for the service, I'd expect you to need no more than 30 drivers trained on the new trains - and Geoff's 710 intro video said that there were 70 drivers trained. Are these drivers driving 378s on the NLL in the interim or are they being paid to just sit at home and watch Cash in the Attic like the crossrail ones? They cover the NLL too, according to the video. Having now watched Geoff's video, I was surprised just how many drivers need to be trained in order to operate the six 710 diagrams. Not just for the Goblin. The six diagrams are just for the Goblin. The 710s aren't being deployed to other lines until the Goblin is fully switched over to 710s. Basically, the Goblin doesn't have its own driver pool, so all the hundreds of Stratford drivers need to be trained on 710s, which takes quite a while, even running three courses a day, seven days a week. Seems a bit excessive. Surely they could just select a subsection of them to train on the 710s. |
#9
![]() |
|||
|
|||
![]()
wrote:
On Sat, 1 Jun 2019 10:53:05 -0000 (UTC) Recliner wrote: TimB wrote: On Saturday, June 1, 2019 at 11:06:35 AM UTC+1, Recliner wrote: Mike Bristow wrote: ["Followup-To:" header set to uk.transport.london.] In article , wrote: On Tue, 28 May 2019 13:56:28 +0100 Mike Bristow wrote: In article , Recliner wrote: I'm curious why only two 710s were introduced yesterday. There are several more sitting in Willesden, and there's been ample time to update their software. Could it be that not enough drivers have qualified on them yet? Lack of driver training is the reason I heard. It suprises me, as with only 6 trains required for the service, I'd expect you to need no more than 30 drivers trained on the new trains - and Geoff's 710 intro video said that there were 70 drivers trained. Are these drivers driving 378s on the NLL in the interim or are they being paid to just sit at home and watch Cash in the Attic like the crossrail ones? They cover the NLL too, according to the video. Having now watched Geoff's video, I was surprised just how many drivers need to be trained in order to operate the six 710 diagrams. Not just for the Goblin. The six diagrams are just for the Goblin. The 710s aren't being deployed to other lines until the Goblin is fully switched over to 710s. Basically, the Goblin doesn't have its own driver pool, so all the hundreds of Stratford drivers need to be trained on 710s, which takes quite a while, even running three courses a day, seven days a week. Seems a bit excessive. Surely they could just select a subsection of them to train on the 710s. I’m sure you’d be among the first to complain when a train is cancelled because all of the trained drivers are either being used or unavailable, while drivers not trained on 710s are available. I’d imagine that over time, all appropriate drivers will be trained. For the beginning of service, "sufficient" drivers will be trained and shifts, diagrams etc juggled to cover the service. As steadily more drivers are trained, the job of rostering/resourcing to cover the service becomes easier. Anna Noyd-Dryver |
#10
![]() |
|||
|
|||
![]()
On Mon, 3 Jun 2019 09:07:46 -0000 (UTC)
Anna Noyd-Dryver wrote: wrote: Seems a bit excessive. Surely they could just select a subsection of them to train on the 710s. I’m sure you’d be among the first to complain when a train is cancelled because all of the trained drivers are either being used or unavailable, while drivers not trained on 710s are available. Thats just down to rostering. Do you think every pilot in every airline is trained on every single type of plane they fly? Quite why different trains require in depth training anyway is a mystery to me. They only go forwards and backwards. And afternoon to learn the controls and where the fuses are, done. |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
710 on ELL? | London Transport | |||
First Class in the South East | London Transport | |||
First Class | London Transport | |||
Watford Stadium First Class Annual Travelcard | London Transport | |||
Upgrading GNER ticket to First Class | London Transport |