Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]() "Joe" wrote in message ... the attice of the hoods wrote: what ever happened to chilton plans to run trains north of Aylesbury.? is this still one of their plans They could at least extend a service to Fairford Leys, surely that'd cost about £1mll+ though -- Is that the name of the flood plain development? G |
#12
![]() |
|||
|
|||
![]()
In article , dtren
writes Dave Arquati wrote in message ... Chiltern are extending platforms at Princes Risborough, High Wycombe, Beaconsfield, Gerrard Cross and Wembley Stadium starting this week at Princes Risborough. See: http://www.chilternrailways.co.uk/pa...=168&news=true There's work that looks a bit like platform lengthening at Gerrards Cross at the moment. Started early, or different work? I think you will find that they are building a Tesco store over the tracks. -- Andrew Electronic communications can be altered and therefore the integrity of this communication can not be guaranteed. Views expressed in this communication are those of the author and not associations or companies I am involved with. |
#13
![]() |
|||
|
|||
![]()
In article , Guy Gorton
writes It will utterly change the environment in GX and not for the better. As a former GX resident I agree totally. -- Andrew Electronic communications can be altered and therefore the integrity of this communication can not be guaranteed. Views expressed in this communication are those of the author and not associations or companies I am involved with. |
#14
![]() |
|||
|
|||
![]()
Guy Gorton wrote in message . ..
On Fri, 16 Jul 2004 19:35:19 +0100, Dave Arquati wrote: Chiltern are extending platforms at Princes Risborough, High Wycombe, Beaconsfield, Gerrard Cross and Wembley Stadium starting this week at Princes Risborough. At Gerrards Cross that will be the Up platform. When the station was remodelled in the 1980s a new Up platform was built on the formation of the old Up through line. The old Up platform was 8 car's length and more, and was often used by 2 x 4-car 115 sets. Then BR moved some Driving Trailer Composites from the Lake District area (105s?) and made up 2-car sets with a 115 Driving Motor Standard, and that was the end of 8 car trains, even in rush hour. So the new platform, with the usual short-sighted vision of BR was made just long enough for the 6 car sets. Another poster has referred to the Tesco development which has been on-going for several months now. For those who have not spotted this development, and I have seen not a mention of it in MR, Why dont you submit the pics with a couple of hundred words of an article to MR on spec? Dont suppose they pay much but it'll be better than a poke in the eye etc. |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Southern Metro platform extensions (was TfL grant LOROL 2 year extension) | London Transport | |||
oyster season extensions | London Transport | |||
Ticket extensions | London Transport | |||
East London Line Extensions | London Transport | |||
Zone extensions with Oyster? | London Transport |