Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
From the Independent:
http://news.independent.co.uk/uk/tra...p?story=571591 High-speed commuter rail scheme delayed by a year By Barrie Clement, Transport Editor 13 October 2004 A £300m project to establish Britain's first super-fast commuter rail service will be delayed by at least a year amid concern that it could be a hugely expensive "white elephant", The Independent understands. The specialised 186mph trains are due to start running from stations in Kent to London along the Channel Tunnel Rail Link (CTRL), but ministers are still arguing over which rolling stock to order. Industry sources assert that there is "not a cat in hell's chance" of the new trains being ready on time - a prediction privately acknowledged by Whitehall officials. The Department for Transport has registered its dismay about the price of the new rolling stock, which has to be specially built to cope with the different electrification systems on the domestic and CTRL tracks. It is known that the cost of the 18 "sets" - locomotive and carriages - could be £200m. However, it is possible that more sets will be required, taking the final price tag, together with other costs, to £300m. Some government officials are also worried that the new services may fail to attract sufficient commuters. While a new station at Ebbsfleet, Gravesend, is expected to be popular with passengers because of its proximity to the A2 and the M25, there is a question-mark over other stations further away from the capital. The new trains would operate on three main routes. One of the new services is scheduled to start at Folkestone and another at Ramsgate. They will both then join the CTRL at Ashford International. From there they go via Ebbsfleet under the Thames to Stratford and on into London. Another is supposed to begin at Sittingbourne, run through the Medway towns then on to the CTRL at Ebbsfleet. They will all terminate at St Pancras. It is thought that the only way of guaranteeing full trains would be by keeping the cost of tickets down. Ministers still hope that a premium rate can be charged for the super-fast services, possibly double the rate paid on comparable routes on the far slower suburban network. Transport for London, which is responsible for networks in the capital, points out that part of the cost for the new super-fast services will be met by axing rush-hour trains using the existing lines. One source close to the rolling stock companies that will buy the trains and lease them to the train operator said that while the project was a "financial basket case", the Government seemed politically committed to it. On the existing domestic railway the fastest time between Gravesend and Charing Cross is 52 minutes. The new services would take about 15 minutes to get from Ebbsfleet to a newly enlarged St Pancras. In a recent letter to the Prime Minister, Sir Sandy Bruce-Lockhart, leader of Kent County Council, argued that the development of the new links was essential to the Government's plans for the development of the so-called Thames Gateway, which runs through north Kent to the coast. Sir Sandy called on Tony Blair, who has taken over the chairmanship of the cabinet sub-committee dealing with the development area, to "unlock the inertia" surrounding the high speed links. The Strategic Rail Authority (SRA), which took over responsibility from Connex for the ailing rail services in Kent, hopes to "re-privatise" the franchise next year. The new incumbent will be responsible for running the fast commuter services as well as existing routes. A spokesman for the SRA said that officials were working with the Department for Transport to get services started "as soon as possible". |
#2
![]() |
|||
|
|||
![]()
"Angus Bryant" wrote in message ...
From the Independent: http://news.independent.co.uk/uk/tra...p?story=571591 High-speed commuter rail scheme delayed by a year By Barrie Clement, Transport Editor 13 October 2004 A £300m project to establish Britain's first super-fast commuter rail service will be delayed by at least a year amid concern that it could be a hugely expensive "white elephant", The Independent understands. What a surprise! The specialised 186mph trains are due to start running from stations in Kent to London along the Channel Tunnel Rail Link (CTRL), but ministers are still arguing over which rolling stock to order. Over engineered trains again. Would it not be eaiser to use the line at 160mph and add 5 minutes to the London Paris journey time? Industry sources assert that there is "not a cat in hell's chance" of the new trains being ready on time - a prediction privately acknowledged by Whitehall officials. The Department for Transport has registered its dismay about the price of the new rolling stock, which has to be specially built to cope with the different electrification systems on the domestic and CTRL tracks. It is known that the cost of the 18 "sets" - locomotive and carriages - could be £200m. However, it is possible that more sets will be required, taking the final price tag, together with other costs, to £300m. I've heard each set is six carriages = £1.8 - 2.7 million per carriage, compared with £1 million for the new South East Trains. Some government officials are also worried that the new services may fail to attract sufficient commuters. With expansion in Ashford and Medway they'll have enough. Especially if they're only six carriages. While a new station at Ebbsfleet, Gravesend, is expected to be popular with passengers because of its proximity to the A2 and the M25, there is a question-mark over other stations further away from the capital. The new trains would operate on three main routes. One of the new services is scheduled to start at Folkestone and another at Ramsgate. They will both then join the CTRL at Ashford International. Anyone know if they plan the join the units at Ashford? From there they go via Ebbsfleet under the Thames to Stratford and on into London. Another is supposed to begin at Sittingbourne, run through the Medway towns then on to the CTRL at Ebbsfleet. They will all terminate at St Pancras. It is thought that the only way of guaranteeing full trains would be by keeping the cost of tickets down. Ministers still hope that a premium rate can be charged for the super-fast services, possibly double the rate paid on comparable routes on the far slower suburban network. So after paying standard rates for the slowest trains in England (Europe?) they're expected to pay extra for the fastest. Double the rate would be inaffordable for too many commuters - how mnany people commute on the Heathrow Express? |
#3
![]() |
|||
|
|||
![]() "Alex Terrell" wrote in message om... The specialised 186mph trains are due to start running from stations in Kent to London along the Channel Tunnel Rail Link (CTRL), but ministers are still arguing over which rolling stock to order. Over engineered trains again. Would it not be eaiser to use the line at 160mph and add 5 minutes to the London Paris journey time? It would be even easier to run it at 90mph and use MK1 EMUs (lots of them going spare now), but that would be missing the point of the line, wouldn't it? |
#4
![]() |
|||
|
|||
![]() |
#5
![]() |
|||
|
|||
![]() "Richard Thomas" wrote in message om... (Alex Terrell) wrote in message . com... "Angus Bryant" wrote in message ... From the Independent: snippity snip The specialised 186mph trains are due to start running from stations in Kent to London along the Channel Tunnel Rail Link (CTRL), but ministers are still arguing over which rolling stock to order. Over engineered trains again. Would it not be eaiser to use the line at 160mph and add 5 minutes to the London Paris journey time? I thought the CTRL DS trains were only supposed to be running at 140mph? Would it not be cheaper to upgrade the max 100 miles of track to the overhead wires system that's used on the CTRL? Then the trains wouldn't have to be so versatile... Stop trying to remove the barriers! You'll have the SRA after you... |
#6
![]() |
|||
|
|||
![]() |
#7
![]() |
|||
|
|||
![]()
TP wrote to uk.transport.london on Thu, 14 Oct 2004:
(Alex Terrell) wrote: So after paying standard rates for the slowest trains in England (Europe?) they're expected to pay extra for the fastest. Double the rate would be inaffordable for too many commuters - how mnany people commute on the Heathrow Express? I am told there are a surprising number of Gatwick Express season ticket holders - a premium fare service that wasn't designed for commuters but seems to have attracted at least some. My parents, on the rare occasions they are going to London for the evening, always use it. They drive to Gatwick, park there, and carry on from Victoria via public transport, or possibly a taxi. I asked them once why they went on the rather more expensive service as opposed to Southern, which is not only cheaper (especially as they have Elderly Cards, or whatever they are called, but you know what I mean), but calls at destinations nearer to where they live. The answer was that the Gatwick services were reliably every 30 minutes throughout the night, so they didn't have to worry about catching the last train! And I think they have found the service more reliable than Southern (wouldn't be difficult!). The 30-mile drive home doesn't seem to worry them. -- "Mrs Redboots" http://www.amsmyth.demon.co.uk/ Website updated 26 September 2004 |
#8
![]() |
|||
|
|||
![]() |
#9
![]() |
|||
|
|||
![]() |
#10
![]() |
|||
|
|||
![]()
"Bob" wrote in message ...
"Alex Terrell" wrote in message om... The specialised 186mph trains are due to start running from stations in Kent to London along the Channel Tunnel Rail Link (CTRL), but ministers are still arguing over which rolling stock to order. Over engineered trains again. Would it not be eaiser to use the line at 160mph and add 5 minutes to the London Paris journey time? It would be even easier to run it at 90mph and use MK1 EMUs (lots of them going spare now), but that would be missing the point of the line, wouldn't it? Slam door? I suspect train cost is proportional to kinetic energy, i.e rises with the square of the velocity. So there will be an optimum speed. It's about 70 miles St Pancras to the tunnel, so: 180 mph = 23 min 160 mph = 26 min 150 mph = 28 min 140 mph = 30 min 90 mph = 47 min Trains running at 140 mph adds only 5 min, but makes the commuter problem much, much easier. (Velocities are max, I know average speeds will be less, but the logic is the same). |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
LU delay compensation | London Transport | |||
Underground delay vouchers | London Transport | |||
stansted express delay | London Transport | |||
Train Delay Cartoon... | London Transport | |||
CTRL Domestics will run to Dover | London Transport News |