The piccadilly trains seem to run very slowly into the northbound
platform at Kings X and its been like that for years. Anyone know the reason? B2003 |
#2
![]() |
|||
|
|||
![]()
Boltar wrote:
The piccadilly trains seem to run very slowly into the northbound platform at Kings X and its been like that for years. Anyone know the reason? There's a twenty mile an hour speed restriction over two set of pointwork on the approach. The first set is the crossover to the west/south bound and the second is a connection to the Northern Line. The latter comes out on the City branch just south of Euston. |
#3
![]() |
|||
|
|||
![]()
Brimstone wrote:
Boltar wrote: The piccadilly trains seem to run very slowly into the northbound platform at Kings X and its been like that for years. Anyone know the reason? There's a twenty mile an hour speed restriction over two set of pointwork on the approach. The first set is the crossover to the west/south bound and the second is a connection to the Northern Line. The latter comes out on the City branch just south of Euston. Has the speed limit been increased? It used to be 10 mph there. -- Richard J. (to e-mail me, swap uk and yon in address) |
#4
![]() |
|||
|
|||
![]()
Richard J. wrote:
Brimstone wrote: Boltar wrote: The piccadilly trains seem to run very slowly into the northbound platform at Kings X and its been like that for years. Anyone know the reason? There's a twenty mile an hour speed restriction over two set of pointwork on the approach. The first set is the crossover to the west/south bound and the second is a connection to the Northern Line. The latter comes out on the City branch just south of Euston. Has the speed limit been increased? It used to be 10 mph there. It may be that my reference is out of date and it has been further reduced. Perhaps a current T/Op will be along soon to confirm the exact figure. However, we are in agreement that the reason for the slow entry is a severe speed restriction on the approach. |
#5
![]() |
|||
|
|||
![]() Brimstone wrote: It may be that my reference is out of date and it has been further reduced. Perhaps a current T/Op will be along soon to confirm the exact figure. However, we are in agreement that the reason for the slow entry is a severe speed restriction on the approach. Why the restriction in the first place though? Is it knackered track or something? I saw them replacing track there last year , surely they'd have done this at the same time? If its not then whats so special about these sets of points? B2003 |
#6
![]() |
|||
|
|||
![]()
On 14 Jan 2005 02:49:40 -0800, "Boltar" wrote:
The piccadilly trains seem to run very slowly into the northbound platform at Kings X and its been like that for years. Anyone know the reason? There is a speed restriction due, I understand but would need to confirm, to the condition of the track on the junction work. Plans are in place to fully replace the junction and remove the restriction thus restoring line speed. We are waiting for a confirmed date as to when the work will be done but the last estimate said it was due in about 4-8 weeks. I'll post the planned date when we get the update. -- Paul C Admits to working for London Underground! |
#7
![]() |
|||
|
|||
![]()
In message , Paul Corfield
writes On 14 Jan 2005 02:49:40 -0800, "Boltar" wrote: The piccadilly trains seem to run very slowly into the northbound platform at Kings X and its been like that for years. Anyone know the reason? There is a speed restriction due, I understand but would need to confirm, to the condition of the track on the junction work. Plans are in place to fully replace the junction and remove the restriction thus restoring line speed. We are waiting for a confirmed date as to when the work will be done but the last estimate said it was due in about 4-8 weeks. I'll post the planned date when we get the update. On a similar theme but a different line and place (but at least still almost on-topic as it is another JNP (aka Tube Lines) operation) why is the Northern Line approach southbound into Old Street made so slowly? Bob. -- Bob Adams - email address: |
#8
![]() |
|||
|
|||
![]()
On Fri, 14 Jan 2005 22:13:04 +0000, Bob Adams wrote:
In message , Paul Corfield writes On 14 Jan 2005 02:49:40 -0800, "Boltar" wrote: The piccadilly trains seem to run very slowly into the northbound platform at Kings X and its been like that for years. Anyone know the reason? There is a speed restriction due, I understand but would need to confirm, to the condition of the track on the junction work. Plans are in place to fully replace the junction and remove the restriction thus restoring line speed. We are waiting for a confirmed date as to when the work will be done but the last estimate said it was due in about 4-8 weeks. I'll post the planned date when we get the update. On a similar theme but a different line and place (but at least still almost on-topic as it is another JNP (aka Tube Lines) operation) why is the Northern Line approach southbound into Old Street made so slowly? There are also track and signal related problems there. There are also issues with the tunnel lining. This is a long standing issue and goes back years. There is a big piece of work going on at the moment and a substantive fix is to implemented soon to get rid of the restrictions and risk of signal failures. A lot of this goes back to how the line was constructed. -- Paul C Admits to working for London Underground! |
#9
![]() |
|||
|
|||
![]()
On Sat, 15 Jan 2005 09:32:36 +0000, Paul Corfield
wrote: There are also track and signal related problems there. There are also issues with the tunnel lining. This is a long standing issue and goes back years. There is a big piece of work going on at the moment and a substantive fix is to implemented soon to get rid of the restrictions and risk of signal failures. A lot of this goes back to how the line was constructed. -- Paul C Whilst we're on this section of Northern Line, could abyone please tell me why, between Angel & Old Street the train seems to traverse over a hollow sounding section of trackbed, making a noise similar to traversing a viaduct or girder bridge. Is there something below the tunnel lining to generate such a hollow sound? Nigel |
#10
![]() |
|||
|
|||
![]()
Nigel wrote:
Whilst we're on this section of Northern Line, could abyone please tell me why, between Angel & Old Street the train seems to traverse over a hollow sounding section of trackbed, making a noise similar to traversing a viaduct or girder bridge. Is there something below the tunnel lining to generate such a hollow sound? No. You're passing through City Road station. |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Up/down/northbound/westbound? | London Transport | |||
Up/down/northbound/westbound? | London Transport | |||
Piccadilly Line Northbound Disruption | London Transport | |||
Thameslink northbound service to Blackfriars this morning (Fri 25th Feb) | London Transport | |||
The slow train into Victoria | London Transport |