Dot Matrix replaces big boards at L/Pool St
"Roger the cabin boy" wrote in
: After some debatre on hgere I noted tonight that NEW dot matrix describer has appeared on the WB platform at Liverpool St (Met Circle) Rumour is they will be doing Barbican too. Barbican has now been done, both Eastbound and Westbound. |
Dot Matrix replaces big boards at L/Pool St
David Jackman wrote in message 52.50...
"Roger the cabin boy" wrote in : After some debatre on hgere I noted tonight that NEW dot matrix describer has appeared on the WB platform at Liverpool St (Met Circle) Rumour is they will be doing Barbican too. Barbican has now been done, both Eastbound and Westbound. and will it actually give the time of the next train in minutes or will it just show "all trains go to kings cross st pancras", like you didn't know already, until 1 minute before the train is due to arrive. |
Dot Matrix replaces big boards at L/Pool St
"nmtop40" wrote in message om... David Jackman wrote in message 52.50... "Roger the cabin boy" wrote in : After some debatre on hgere I noted tonight that NEW dot matrix describer has appeared on the WB platform at Liverpool St (Met Circle) Rumour is they will be doing Barbican too. Barbican has now been done, both Eastbound and Westbound. and will it actually give the time of the next train in minutes or will it just show "all trains go to kings cross st pancras", like you didn't know already, until 1 minute before the train is due to arrive. I saw that new describer a few days ago and it did give the next three trains. However, I noticed something different on this one that I had never seen before. It said: 1 CIRCLE LINE via Paddington DELAY. 2 HAMMERSMITH via Shepherd's Bush 8mins. |
Dot Matrix replaces big boards at L/Pool St
David Jackman wrote in message 52.50...
"Roger the cabin boy" wrote in : After some debatre on hgere I noted tonight that NEW dot matrix describer has appeared on the WB platform at Liverpool St (Met Circle) Rumour is they will be doing Barbican too. Barbican has now been done, both Eastbound and Westbound. Amazing , its only taken them almost 20 years since the first dot matrix displays appeared on the northern line to install them on a major central london section of the met/circle. You've got to love the speed at which LU operates. Still , with a company that takes 9 months to fix an escalator nothing comes as a surprise anymore... B2003 |
Dot Matrix replaces big boards at L/Pool St
Boltar writes
Still , with a company that takes 9 months to fix an escalator nothing comes as a surprise anymore... I'd like to se you do it any faster... -- Dave |
Dot Matrix replaces big boards at L/Pool St
In message , Boltar
writes with a company that takes 9 months to fix an escalator nothing comes as a surprise anymore... Isn't it taking 18months at Marylebone to replace or fix or whatever they are doing to it? -- CJG |
Dot Matrix replaces big boards at L/Pool St
Amazing , its only taken them almost 20 years since the first dot matrix
displays appeared on the northern line to install them on a major central london section of the met/circle. You've got to love the speed at which LU operates. It will take another 5 Years to get the things working. |
Dot Matrix replaces big boards at L/Pool St
Dave wrote in message ...
Boltar writes Still , with a company that takes 9 months to fix an escalator nothing comes as a surprise anymore... I'd like to se you do it any faster... If I was trained and was part of a good team I'm damn sure I could. When railtrack replaced the escalators at fenchurch street station it took them... ... ready for this?... ONE WEEK! It can be done if the people doing it have a clue and give a sh*t. B2003 |
Dot Matrix replaces big boards at L/Pool St
CJG wrote in message ...
In message , Boltar writes with a company that takes 9 months to fix an escalator nothing comes as a surprise anymore... Isn't it taking 18months at Marylebone to replace or fix or whatever they are doing to it? More than likely. It took them 3 years to sort out all the escalators at Holborn. Considering it took far less time than that to originally build the station including installing the escalators you can only laugh at the absurdity of it all. B2003 |
Dot Matrix replaces big boards at L/Pool St
Boltar writes
More than likely. It took them 3 years to sort out all the escalators at Holborn. Considering it took far less time than that to originally build the station including installing the escalators you can only laugh at the absurdity of it all. It's often the case that building something is a lot quicker than dismantling and replacing parts of it. If the factory can build a car from scratch on less than an hour - why is it that the garage takes two days to replace the engine? -- Dave |