I see that the jubilee line is set to close for 5 days later this year
to install ne signalling equipment. Which section is to get the new equipment? Kevin |
#2
![]() |
|||
|
|||
![]() |
#3
![]() |
|||
|
|||
![]()
) gurgled happily, sounding much like they were saying :
I see that the jubilee line is set to close for 5 days later this year Haven't seen this - When? |
#4
![]() |
|||
|
|||
![]() "Adrian" wrote in message . 244.170... ) gurgled happily, sounding much like they were saying : I see that the jubilee line is set to close for 5 days later this year Haven't seen this - When? December 25th-30th Peter Smyth |
#5
![]() |
|||
|
|||
![]()
Peter Smyth ) gurgled happily, sounding much like
they were saying : I see that the jubilee line is set to close for 5 days later this year Haven't seen this - When? December 25th-30th Oh. Hardly peak time. Panic over. |
#6
![]() |
|||
|
|||
![]()
Adrian wrote:
Peter Smyth ) gurgled happily, sounding much like they were saying : I see that the jubilee line is set to close for 5 days later this year Haven't seen this - When? December 25th-30th Oh. Hardly peak time. Panic over. However, the peak service will be reduced gradually from about 4 December to 24 December whilst trains are taken out of service to have the new carriages added (and they can't come back into service until every train has the extra carriage). -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#7
![]() |
|||
|
|||
![]()
"Adrian" wrote in message
. 244.170... Oh. Hardly peak time. Panic over. Glad I've got a car - if I relied on public transport to get to work It'd be a nightmare. -- Everything above is the personal opinion of the author, and nothing to do with where he works and all that lovely disclaimery stuff. Posted in his lunch hour too. |
#8
![]() |
|||
|
|||
![]()
But once the chrimbo period is over there's no problem (apart from the
usual at any rate)bigger trains, more room. Paul Weaver wrote: "Adrian" wrote in message . 244.170... Oh. Hardly peak time. Panic over. Glad I've got a car - if I relied on public transport to get to work It'd be a nightmare. -- Everything above is the personal opinion of the author, and nothing to do with where he works and all that lovely disclaimery stuff. Posted in his lunch hour too. |
#9
![]() |
|||
|
|||
![]()
On Wed, 25 May 2005 21:42:43 +0100, Dave Arquati
wrote: However, the peak service will be reduced gradually from about 4 December to 24 December whilst trains are taken out of service to have the new carriages added (and they can't come back into service until every train has the extra carriage). Why not? Neil -- Neil Williams in Milton Keynes, UK When replying please use neil at the above domain 'wensleydale' is a spam trap and is not read. |
#10
![]() |
|||
|
|||
![]()
Neil Williams ) gurgled happily, sounding
much like they were saying : (and they can't come back into service until every train has the extra carriage). Why not? Presumably to protect against a situation where the JLE doors "think" it's a long train, but it isn't. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Heathrow Piccadilly Line Closure | London Transport | |||
Heathrow Piccadilly Line Closure | London Transport | |||
Heathrow Piccadilly Line Closure | London Transport | |||
Five Day closure of Central Line (was surprised) | London Transport | |||
Success of Central Line Closure answer to Track Maintenance | London Transport |