![]() |
Waterloo & City Line to Close for 5 Months
In message , Andy
writes Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain.:) Andrew Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. -- Clive |
Waterloo & City Line to Close for 5 Months
|
Waterloo & City Line to Close for 5 Months
On Sat, 1 Oct 2005 01:06:24 +0100, Clive
wrote: In message , Andy writes Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain.:) Andrew Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. There always was a way out but they built Waterloo International on top of it. -- James Farrar . @gmail.com |
Waterloo & City Line to Close for 5 Months
In message ,
Colin Rosenstiel writes They used to have a lift but it disappeared under the Eurostar station. Perhaps they could put it back in 2007. That's the old way. What's wrong with a ramp? Or a direct connection to a tube line at either Waterloo or bank. The rest of the system is integrated with lines that connect when services are suspended, what's wrong with bringing the W&C into the 21centry. -- Clive |
Waterloo & City Line to Close for 5 Months
Clive wrote:
In message , Colin Rosenstiel writes They used to have a lift but it disappeared under the Eurostar station. Perhaps they could put it back in 2007. That's the old way. What's wrong with a ramp? Or a direct connection to a tube line at either Waterloo or bank. The rest of the system is integrated with lines that connect when services are suspended, what's wrong with bringing the W&C into the 21centry. How about cost effectiveness? Think about the engineering involved in such a project (assuming it to be technically possible) and how much it would cost and then decide if it would be worth spending so much mony for the benefits that would be gained. |
Waterloo & City Line to Close for 5 Months
Clive wrote:
Considering all the years the Drain has been running why has a ramp not been built to get trains out to B.R. or since conversion, as it's 92 stock connect it to the nearest tube at Bank or the nearest underground line at waterloo. Are you going to pay for these works? -- http://gallery120232.fotopic.net/p10601020.html (91 009 arriving at Kings Cross in 1999) |
Waterloo & City Line to Close for 5 Months
|
Waterloo & City Line to Close for 5 Months
writes:
said: . improved platform train interface What on earth does this mean in plain English? I can just about guess the other ones, but this has me really puzzled. The inverse of "mind the gap"? |
All times are GMT. The time now is 03:14 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk