Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#31
![]() |
|||
|
|||
![]()
In message , at
08:53:25 on Fri, 30 Sep 2005, Brimstone remarked: In message , at 07:41:09 on Fri, 30 Sep 2005, Brimstone remarked: How will they teleport them between the two lines? Perhaps with a smidgin of enterprise? Craning them out one car at a time, then transporting them by road to wherever the nearest Central line depot is; then doing the reverse five months later really doesn't seem worth while. Especially given that the specification and modification level of the cars on the two lines has diverged over the years - so they probably wouldn't work anyway. Perhaps if I had written it as "Enterprise" it might have got a better response? Ah, I see the joke now ;-) -- Roland Perry |
#32
![]() |
|||
|
|||
![]()
Brimstone wrote:
Perhaps if I had written it as "Enterprise" it might have got a better response? That is logical. -- http://gallery120232.fotopic.net/p11857691.html (220 028 zipping through a wet and misty Slindon in 2005) |
#33
![]() |
|||
|
|||
![]()
Wasn't the Waterloo and City line closed for a number of months
recently due to the Chancery Lane derailment? Why didn't they do the work then? A. |
#34
![]() |
|||
|
|||
![]()
Londoncityslicker wrote:
Wasn't the Waterloo and City line closed for a number of months recently due to the Chancery Lane derailment? Why didn't they do the work then? Are you familiar with the customary response to stupid questions? |
#35
![]() |
|||
|
|||
![]() "Londoncityslicker" wrote in message oups.com... Wasn't the Waterloo and City line closed for a number of months recently due to the Chancery Lane derailment? Why didn't they do the work then? A. Er because it was closed for a number of days, not months? Paul |
#36
![]() |
|||
|
|||
![]()
In article ,
Richard J. wrote: From my understanding its not a exact decrease in journey time obviously you can't cut an approximately 4-5min journey by 2min. What it is talking about is journey time capability (JTC) which is a theoretical number which comes out the end of a stats formula based on the it takes to get between two places and takes into account things like door opening and closing times and real journey time. Andrew I've read that three times and still don't understand it. If JTC takes into account real journey times plus door opening and closing times, it sounds realistic to me, rather than theoretical. Where do statistics come into this? And my question remains unanswered: how are they going to achieve 2 minutes instead of 4? If the JTC is the expected time between ariving on platform A and departing on platform B, they may achieve a 2 minute reduction by having a train every 2 minutes (ie, an average wait of 1 minute) instead of every 6 minutes (ie, an average wait of 3 minutes). -- Mike Bristow - really a very good driver |
#37
![]() |
|||
|
|||
![]()
Mike Bristow wrote:
In article , Richard J. wrote: From my understanding its not a exact decrease in journey time obviously you can't cut an approximately 4-5min journey by 2min. What it is talking about is journey time capability (JTC) which is a theoretical number which comes out the end of a stats formula based on the it takes to get between two places and takes into account things like door opening and closing times and real journey time. Andrew I've read that three times and still don't understand it. If JTC takes into account real journey times plus door opening and closing times, it sounds realistic to me, rather than theoretical. Where do statistics come into this? And my question remains unanswered: how are they going to achieve 2 minutes instead of 4? If the JTC is the expected time between ariving on platform A and departing on platform B, they may achieve a 2 minute reduction by having a train every 2 minutes (ie, an average wait of 1 minute) instead of every 6 minutes (ie, an average wait of 3 minutes). The reduction that bowroaduk mentioned was in journey time -- "improved journey time (circa 2 minutes)" -- not in service interval. Does anyone have access to the WTT and can clarify what the current timings are? CULG says the "end-to-end" journey time is 4 minutes, but I'm not sure if that means from/to the Waterloo platforms or the depot. -- Richard J. (to e-mail me, swap uk and yon in address) |
#38
![]() |
|||
|
|||
![]() Apparently the trains are to be craned out during the closure for modification. |
#39
![]() |
|||
|
|||
![]()
Apparently the trains are to be craned out during the closure for
modification |
#40
![]() |
|||
|
|||
![]() wrote in message oups.com... Apparently the trains are to be craned out during the closure for modification. That's the only way they will get out of the drain. ![]() Andrew |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tower Bridge To Close For 3 Months | London Transport | |||
Waterloo & City line crane operation this weekend... | London Transport | |||
Waterloo & City line | London Transport | |||
Waterloo & City Line Car Lift Operation | London Transport | |||
LU to close Waterloo&City line to save money. | London Transport |