![]() |
Next route to be bendificated
"Barry Salter" wrote in message
... the 29 is due to be cut back to Wood Green and bendificated on the 14th of January, Isn't the 29 the very last route run in overlapping sections? -- John Rowland - Spamtrapped Transport Plans for the London Area, updated 2001 http://www.geocities.com/Athens/Acro...69/tpftla.html A man's vehicle is a symbol of his manhood. That's why my vehicle's the Piccadilly Line - It's the size of a county and it comes every two and a half minutes |
Next route to be bendificated
And no more are planned at the moment to be converted to bendi bus
after 29 though it was rumoured that 77A was to recieve the treatment the idea now seems to have been dropped. Yes the 29 is the last to run in overlapping sections, Martin |
Next route to be bendificated
"MartyJ" wrote in message oups.com... And no more are planned at the moment to be converted to bendi bus after 29 though it was rumoured that 77A was to recieve the treatment the idea now seems to have been dropped. Yes the 29 is the last to run in overlapping sections, Martin 77a contract has been awarded to London General with LFDD, route will be renumbered either 87 or 437 thereby removing the last suffixed route number Paul |
All times are GMT. The time now is 07:18 AM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk