How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load, wouldn't it ?
Mike |
#2
![]() |
|||
|
|||
![]()
maf writes
How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load,*wouldn't it ? I believe that all it needs is a small section of track to link the GWML to the WLL to enable through running. This would mean that trains from Heathrow would follow the existing route towards Paddington as far as the Eurostar train depot. A link to the Willesden-Clapham Junction would then allow trains to follow the route taken by the existing Willesden Junction-Clapham Junction & Watford-Brighton via Gatwick trains. Problem then would be fitting them in amongst all the existing services, which won't be easy. -- Dave |
#3
![]() |
|||
|
|||
![]()
maf wrote:
How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load, wouldn't it ? Why Croydon? The Southall to Waste Transfer Station branch virtually connects with the SR Hounslow loop. A connection there and another (or a reverse) at Clapham Junction, and you're done. But I think you need something more direct, which would cost more. As things are at present, we may not even get all LHR terminals connected by a single line (i.e. no reversal or change). Should that be achieved, Heathrow and Luton could be connected via Uxbridge and Watford, mostly using existing or former lines. I suspect more new track would be needed for a direct route to Gatwick - but this would mean the line could be faster. With a 30 minute journey time, you could destroy the argument for a 3rd runway at LHR by allowing the two airports to be treated as one for flight connections. I don't know whether such a railway would be cheaper than the 3rd runway - how much will 40 Km of CTRL cost? Of course, if Cliffe were built on the CTRL, connections from half of Europe could be made as quickly by rail as by air, which would be good for the planet. Colin McKenzie |
#4
![]() |
|||
|
|||
![]()
In article , Dave
writes How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load,*wouldn't it ? I believe that all it needs is a small section of track to link the GWML to the WLL to enable through running. There's already a link a bit further west, travelling via Willesden. Problem then would be fitting them in amongst all the existing services, which won't be easy. Exactly. -- Clive D.W. Feather, writing for himself | Home: Tel: +44 20 8371 1138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Written on my laptop; please observe the Reply-To address |
#5
![]() |
|||
|
|||
![]()
"David Randles" wrote in message
... In article , maf wrote: How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load, wouldn't it ? Quite easy via Ealing Broadway, Kensington Olympia, Clapham Jc and East Croydon. All that is required is a short length of electrification between Acton Main Line and Acton Wells Jc. However as discussed here several times before, the amount of Heathrow-Gatwick traffic is very small and would almost certainly not justify a regular direct train service. Judging from the traffic generated by Virgins trains when they were allowed to run, traffic for that line is there, although most of it takes the Guildford route now. A cross-platform link with a Heathrow service at Ealing Broadway, or Hayes and Harlington, would achieve the same objective. -- Terry Harper, Web Co-ordinator, The Omnibus Society http://www.omnibussoc.org E-mail: URL: http://www.terry.harper.btinternet.co.uk/ |
#6
![]() |
|||
|
|||
![]()
There is already a rail connection, it just needs electrifying.
But I really don't think the Heathrow-Gatwick passenger numbers justify doing it "maf" wrote in message ... How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load, wouldn't it ? Mike |
#7
![]() |
|||
|
|||
![]()
In article ,
Terry Harper wrote: "David Randles" wrote in message ... In article , maf wrote: How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load, wouldn't it ? Quite easy via Ealing Broadway, Kensington Olympia, Clapham Jc and East Croydon. All that is required is a short length of electrification between Acton Main Line and Acton Wells Jc. However as discussed here several times before, the amount of Heathrow-Gatwick traffic is very small and would almost certainly not justify a regular direct train service. Judging from the traffic generated by Virgins trains when they were allowed to run, traffic for that line is there, although most of it takes the Guildford route now. A cross-platform link with a Heathrow service at Ealing Broadway, or Hayes and Harlington, would achieve the same objective. Indeed, in the very early days of planning for the Virgin XC Operation Princess, the intention was to run an hourly service from Birmingham (and points north) to Brighton via Reading, calling at Hayes (for a shuttle to Heathrow), Kensington Olympia and Gatwick. This would have been a more cost-effective way of achieving the same objective, while at the same time serving both Heathrow and Gatwick from the Midlands. It fell by the wayside because of "pathing problems" I believe. David |
#8
![]() |
|||
|
|||
![]()
It is already being planned as part of the airport expansion for
Heathrow Terminal 5. There will be an electrified link between West Drayton and Staines down most of the route of the old GWR branch line through Poyle. At Staines there will two chords from the re-instated branch line to join the main line to get to Virgia Water and the West and the other to get to Feltham, London and ultimately Gatwick. Likewise there will be an extra chord at West Drayton to allow trains to divert west to Reading. There is already a link to the east for Paddington. Midway near Poyle there will be a spur into Terminal 5 - this will meet up with an extended Heathrow Express branch. In addition the current Heathrow Express branch will have an extra chord installed at its northern end so that trains can also divert west along the main GWR line to Reading etc. Currently there is only a chord onto the main line to get to Paddington. Under T5 - the service tunnels of which were built many years ago during the building of the T4 loop of the Picadilly Line - even before any planning application for T5 had even started but no-one noticed - a huge empty box was excavated that will now become the rail interchange to/from T5. This will include not only a new spur from the Picadilly Line loop, but also a junction for the Heathrow Express and the new spur from the West Drayton/Staines branch. This has all been planned for years. Crossrail will also use these lines - providing an excellent connection to/from Heathrow and Stansted and to/from Heathrow and Luton. The Local Heathrow Express, which local residents were lead to believe would also provide local services after all of the noise, dirt and disruption which was caused when the HEX line was being built, never actually eventuated. It MAY be introduced in the near future, but most likely at prices well beyond most airport workers wages. Meanwhile you can all look forwards to IMMENSE disruption on the GWR line as Crossrail is being built, on the SWT lines near Staines as the T5 branch is reinstated, and on the GWR line at West Drayton as all the various chords, spurs and connections are upgraded or installed. The GOOD thing about all this rail development at Heathrow is that given all the new and fast connections between airports and the rest of the country we wont need a new third runway to be built there - thereby saving all the houses (10,000) and listed buildings etc., that will need to be demolished if it does get built. CJB. "maf" wrote in message ... How difficult would it be to achieve a Heathrow-Croydon-Gatwick rail connection ? It would reduce M25 load, wouldn't it ? Mike -- |
#9
![]() |
|||
|
|||
![]() "Chris Brady" wrote in message m... Under T5 - the service tunnels of which were built many years ago during the building of the T4 loop of the Picadilly Line - even before any planning application for T5 had even started but no-one noticed - ... If the service tunnels for T5 were built during the building of the T4 Piccadilly loop, they must now be in the wrong place for T5. The Piccadilly loop including a straight stretch for a T5 station, but it can't be used for this because AIUI the location of T5 has been moved westwards. -- Richard J. (to e-mail me, swap uk and yon in address) |
#10
![]() |
|||
|
|||
![]()
Chris Brady writes
The Local Heathrow Express, which local residents were lead to believe would also provide local services after all of the noise, dirt and disruption which was caused when the HEX line was being built, never actually eventuated. It MAY be introduced in the near future, but most likely at prices well beyond most airport workers wages. BAA have now ordered the trains needed for the new service. "Siemens has won a contract to supply four new Desiro electric trains as part of a GBP30 million investment by BAA, the world's leading airport company, to provide a new stopping service between London Paddington Station and Heathrow Airport. The new service will call at Ealing Broadway, West Ealing, Hanwell, Southall and Hayes. [...] "The new trains are due to enter passenger service from December 2004." http://www.siemens.co.uk/default.asp?content_id=2967 -- Dave |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Best route from Croydon (London) to Heathrow? | London Transport | |||
"Heathrow and Gatwick airports: Ministers mull rail link" (twixt the two) | London Transport | |||
"Heathrow and Gatwick airports: Ministers mull rail link" (twixt | London Transport | |||