East London Line Extension
PhilD wrote:
John Rowland wrote: I think it will be an ELL siding and disconnected from the District Line, but I might have got that the wrong way around. The ELL signalling plan I've seen has no connection at the ELL end, so I think it will be the other way round. On the other hand, the revised Signalling Plan I've seen retains the curve, primarily for Engineering Trains to access LUL from NR metals. Trains to be serviced at new depot at New Cross Gate, heavy work likely to go to Selhurst. regards HN28 |
East London Line Extension
|