Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
From Watford Observer, Friday, February 10, 2006
Rail link scheme a priority TWO transport schemes in the Watford area could benefit from £63m of funding if the Government listens to regional recommendations. The Croxley Rail Link (CRL) and improvements at Watford Junction Station have been identified by the East of England Regional Assembly as priorities, along with 23 other schemes earmarked for £778m of investment over the next ten years. The assembly considered 135 schemes before choosing priorities. Subject to Government approval, the CRL, which is expected to cost £66m, will get £50m, £11m in 2008 and £39min 2001. The improvements at Watford Junction are expected to cost £16m and will get £13m in 2011. .................................................. .................................................. ................................. John Burke WRUG |
#2
![]() |
|||
|
|||
![]()
burkey wrote:
The Croxley Rail Link (CRL) and improvements at Watford Junction Station have been identified by the East of England Regional Assembly as priorities Whilst I'm sure that the people of Watford (other than the affected nimbys) will rejoice, one can't help wondering if this august body has all its faculties in working order. There are umpteen other East of England PT projects that should be greater priorities, like increasing capacity on the ECML, and upgrading cross-country links, especially for freight flows from the ports. -- http://gallery120232.fotopic.net/p9632848.html (33 050 at Salisbury, 1985) |
#3
![]() |
|||
|
|||
![]() burkey wrote: improvements at Watford Junction Does this include the necessary tweaks to the track and signalling arrangements to allow Silverlink to run through to Euston from St. Albans Abbey? David Belcher |
#4
![]() |
|||
|
|||
![]()
On Fri, 10 Feb 2006 11:42:55 -0000, Chris Tolley wrote:
Whilst I'm sure that the people of Watford (other than the affected nimbys) will rejoice, one can't help wondering if this august body has all its faculties in working order. There are umpteen other East of England PT projects that should be greater priorities, like increasing capacity on the ECML, and upgrading cross-country links, especially for freight flows from the ports. I think technically there is ample capacity on the ECML, its only restricted because of the contracts that Network Rail (Railtrack) have entered into. Doing things like; cancelling the NoL Eurostar Paths banning freight at peak times increasing the speeds on the slow lines reducing the line limit to 90 mph south of stevenage increasing the services to 12 car would provide enough capacity for the foreseeable future. Paul |
#5
![]() |
|||
|
|||
![]() "Chris Tolley" wrote in message . .. burkey wrote: The Croxley Rail Link (CRL) and improvements at Watford Junction Station have been identified by the East of England Regional Assembly as priorities There are umpteen other East of England PT projects that should be greater priorities, like increasing capacity on the ECML, and upgrading cross-country links, especially for freight flows from the ports. The Croxley Link presumably gives more bangs per buck. |
#6
![]() |
|||
|
|||
![]()
Not holding my breath on this one... I lived in the area from 1978 to
1990 and constructing the Croxley Rail Link was always around the corner even then. Despite TfL's promise of part-funding it appears as if the DafT mandarins are sitting on their hands hoping it goes away. It wasn't mentioned in Hertfordshire's Local Transport Plan 2 settlement before Christmas, pushing the timetable back even further. Come on DfT, it's now or never surely...? THC |
#7
![]() |
|||
|
|||
![]()
Chris Tolley wrote:
There are umpteen other East of England PT projects that should be greater priorities, like increasing capacity on the ECML, and upgrading cross-country links, especially for freight flows from the ports. Yes, getting the route via Bury St Edmunds cleared for W10 and allowing more paths, also getting the Braintree to Stansted line going etc. |
#8
![]() |
|||
|
|||
![]()
Darren ] wrote:
Chris Tolley wrote: There are umpteen other East of England PT projects that should be greater priorities, like increasing capacity on the ECML, and upgrading cross-country links, especially for freight flows from the ports. Yes, getting the route via Bury St Edmunds cleared for W10 and allowing more paths, also getting the Braintree to Stansted line going etc. Why not make the effort to influence the decision making process, either through your MP or by writing in? Griping on here might make you feel better but it is never going to achieve anything. |
#9
![]() |
|||
|
|||
![]()
Remember this article was from the WATFORD Observer, I'm sure there
will be lots more schemes green lighted across the East of England...fear not ye! mmlabbd Chris Tolley wrote: burkey wrote: The Croxley Rail Link (CRL) and improvements at Watford Junction Station have been identified by the East of England Regional Assembly as priorities Whilst I'm sure that the people of Watford (other than the affected nimbys) will rejoice, one can't help wondering if this august body has all its faculties in working order. There are umpteen other East of England PT projects that should be greater priorities, like increasing capacity on the ECML, and upgrading cross-country links, especially for freight flows from the ports. -- http://gallery120232.fotopic.net/p9632848.html (33 050 at Salisbury, 1985) |
#10
![]() |
|||
|
|||
![]()
Paul Hutchinson wrote:
I think technically there is ample capacity on the ECML IOW - "there's no problem with capacity ... Doing things like; cancelling the NoL Eurostar Paths banning freight at peak times .... so long as you take some trains away." I think you've contradicted yourself. Don't you? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Crossrail Select Committee adds Woolwich station to scheme | London Transport News | |||
Southern keen to run pilot Oyster scheme | London Transport | |||
West London Tram Scheme | London Transport | |||
Ealing Council CPZ Scheme - Open Letter | London Transport | |||
No statement for Crossrail scheme | London Transport |