![]() |
|
KX TUBE - replacement steps opening schedule?
The other weekend I was up at KX and was suprised too see the new steps
replacing the old ones in front of WH Smiths still haven't opened. They look completely finished behind the hoarding so is the idea to open everything in a big bang rather than incrementally? |
KX TUBE - replacement steps opening schedule?
kytelly wrote: The other weekend I was up at KX and was suprised too see the new steps replacing the old ones in front of WH Smiths still haven't opened. They look completely finished behind the hoarding so is the idea to open everything in a big bang rather than incrementally? I'm surprised there has been no comment on this post so far. I would like to think that all sorts of frenzied activity is going on behind the scenes at KX but to us, the public, the works seem to be progressing at a snail's pace. The new stairs seem to have been on the point of opening for months but presumably cannot do so until the temporary ticket offices in front of them are decommissioned and removed, and presumably that can't happen until the new ticket offices down in the tube hall are ready. The only signs of recent progress here are that the wraps have come off the counters and the chip 'n pin machines within the last week. Does anybody have any ideas regarding tentative opening dates of the stairs and the western ticket hall? |
KX TUBE - replacement steps opening schedule?
jb wrote:
The other weekend I was up at KX and was suprised too see the new steps replacing the old ones in front of WH Smiths still haven't opened. They look completely finished behind the hoarding so is the idea to open everything in a big bang rather than incrementally? I'm surprised there has been no comment on this post so far. I would like to think that all sorts of frenzied activity is going on behind the scenes at KX but to us, the public, the works seem to be progressing at a snail's pace. The new stairs seem to have been on the point of opening for months but presumably cannot do so until the temporary ticket offices in front of them are decommissioned and removed, and presumably that can't happen until the new ticket offices down in the tube hall are ready. The only signs of recent progress here are that the wraps have come off the counters and the chip 'n pin machines within the last week. Does anybody have any ideas regarding tentative opening dates of the stairs and the western ticket hall? The Western Ticket Hall looks finished - you can see it, apparently fully fitted out, through the hoardings at the front of St Pancras. However, LUL seem to have stopped mentioning an April date for WTH opening, which suggests it's slipped for Mysterious And Bizarre Reasons. If anyone does have a date, it'd be nice to hear it...! -- John Band john at johnband dot org www.johnband.org |
KX TUBE - replacement steps opening schedule?
The western ticket hall should be opening in about 4 weeks, dependant on
final hand-over and approvals. |
KX TUBE - replacement steps opening schedule?
John B wrote:
The Western Ticket Hall looks finished - you can see it, apparently fully fitted out, through the hoardings at the front of St Pancras. However, LUL seem to have stopped mentioning an April date for WTH opening, which suggests it's slipped for Mysterious And Bizarre Reasons. If anyone does have a date, it'd be nice to hear it...! Passing by the Western Ticket Hall I noticed a few letters on the scaffolding regarding the length of time for which Sloane Scaffolding are allowed to maintain possession of it. Try this: http://edwardsloley7774.fotopic.net/p27771450.html (apologies for the inconvenient size) |
KX TUBE - replacement steps opening schedule?
John B wrote:
The Western Ticket Hall looks finished - you can see it, apparently fully fitted out, through the hoardings at the front of St Pancras. However, LUL seem to have stopped mentioning an April date for WTH opening, which suggests it's slipped for Mysterious And Bizarre Reasons. If anyone does have a date, it'd be nice to hear it...! Passing by the Western Ticket Hall I noticed a few letters on the scaffolding regarding the length of time for which Sloane Scaffolding are allowed to maintain possession of it. Try this: http://edwardsloley7774.fotopic.net/p27771450.html (apologies for the inconvenient size) EDIT: have just altered the size of the pics |
KX TUBE - replacement steps opening schedule?
jb wrote:
kytelly wrote: The other weekend I was up at KX and was suprised too see the new steps replacing the old ones in front of WH Smiths still haven't opened. They look completely finished behind the hoarding so is the idea to open everything in a big bang rather than incrementally? I'm surprised there has been no comment on this post so far. I would like to think that all sorts of frenzied activity is going on behind the scenes at KX but to us, the public, the works seem to be progressing at a snail's pace. The new stairs seem to have been on the point of opening for months but presumably cannot do so until the temporary ticket offices in front of them are decommissioned and removed, and presumably that can't happen until the new ticket offices down in the tube hall are ready. The only signs of recent progress here are that the wraps have come off the counters and the chip 'n pin machines within the last week. I got rather confused heading to St Pancras at the weekend having not been through it for a while - got off the Tube at KX and got to the surface, and instinctively followed the first sign I saw pointing towards St Pancras to the left - and walked straight into a dead end around the corner (along with several other people). I'd gotten used to following the signs as the route changed from time to time. I presumed that the fact that the new sign pointed in that direction meant that route would be opening soon (and replacing the current exit to St Pancras)... -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
KX TUBE - replacement steps opening schedule?
|
KX TUBE - replacement steps opening schedule?
Colin Rosenstiel wrote: In article , (Robin Mayes) wrote: The western ticket hall should be opening in about 4 weeks, dependant on final hand-over and approvals. When will the old tube ticket hall be replaced underground so the inaccessible surface nonsense can be removed? Which ticket hall (and what surface nonsense) do you mean? PaulO |
All times are GMT. The time now is 12:07 AM. |
|
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk