Thameslink 2000 Power
If and when the Thameslink 2000 project takes place, are the plans to keep
the 3rd rail power supply south of the river and the overhead supply north of the river or are there plans/aspirations to make the whole lot overhead supply? Philip |
Thameslink 2000 Power
|
Thameslink 2000 Power
|
Thameslink 2000 Power
On Mar 7, 9:19 am, "Peter Lawrence" wrote:
On Wed, 7 Mar 2007 00:37 +0000 (GMT Standard Time), (Colin Rosenstiel) wrote: In article , (Phil) wrote: If and when the Thameslink 2000 project takes place, are the plans to keep the 3rd rail power supply south of the river and the overhead supply north of the river or are there plans/aspirations to make the whole lot overhead supply? Yes. :-) I'm not aware of any plans to change the changeover point. I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Whats the point? B2003 |
Thameslink 2000 Power
In article ,
(Peter Lawrence) wrote: I'm not aware of any plans to change the changeover point. I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Farringdon, surely? -- Paul Cummins *FREE* mobile phone - http://tinyurl.com/2yw23x *0845, 0870, 070* - http://tinyurl.com/ywwdk6 *FREE* ADSL for life - http://tinyurl.com/22dlhh *PDA/Palm Insurance* - http://tinyurl.com/3y9u2r |
Thameslink 2000 Power
Boltar wrote:
I'm not aware of any plans to change the changeover point. I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Whats the point? The point is that if the panto gets stuck up or down, the train can't proceed and will need to escape into the City Thameslink sidings rather than get in the way of the other trains. Merely sending the train back might not be an option when the other line is already carrying 24tph which have to fit punctually between other services in South London. Farringdon will no longer be suitable as a changeover point because there will be no escape route when the platform extension forces closure of the Moorgate branch. I am not sure why Blackfriars was ever considered as the changeover point, especially since catenary would increase the visual intrusion of the bridge over the Thames. |
Thameslink 2000 Power
On Mar 7, 12:20 pm, "John Rowland"
wrote: Boltar wrote: I'm not aware of any plans to change the changeover point. I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Whats the point? The point is that if the panto gets stuck up or down, the train can't proceed and will need to escape into the City Thameslink sidings rather than get in the way of the other trains. Presumably they'll keep the 3rd rail into the sidings then. What about at Farringdon , will it be lifted? B2003 |
Thameslink 2000 Power
I'm not aware of any plans to change the changeover point.
I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Farringdon, surely? That was meant to be read that the original plan was to move the changeover point to Blackfriars (from Farringdon), now it is planned to move it to City Thameslink. |
Thameslink 2000 Power
On Wed, 7 Mar 2007 12:20:15 -0000, John Rowland wrote:
I'm not aware of any plans to change the changeover point. I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Whats the point? The point is that if the panto gets stuck up or down, the train can't proceed and will need to escape into the City Thameslink sidings rather than get in the way of the other trains. Merely sending the train back might not be an option when the other line is already carrying 24tph which have to fit punctually between other services in South London. We're talking about an occasional failure here. It's not going to have to fit into the normal timetable. I am not sure why Blackfriars was ever considered as the changeover point, especially since catenary would increase the visual intrusion of the bridge over the Thames. Perhaps because trains don't normally stop at City Thameslink on Sundays, Saturday evenings, and during the night. If the changeover is there, they'll all have to stop there all the time. |
Thameslink 2000 Power
"Graham J" wrote in message
... I'm not aware of any plans to change the changeover point. I believe the latest plan is to move the changeover to City Thameslink. (originally it was Blackfriars).. Farringdon, surely? That was meant to be read that the original plan was to move the changeover point to Blackfriars (from Farringdon), now it is planned to move it to City Thameslink. I thought the plan was to increase their options by enabling changeover at City Thameslink - but not to actually change the point at which it usually happens. Sadly I can't give you any interesting reading material to back that up since I can't remember where I read it... ;-( K |