Crossrail franchise
The "Two Crossrail questions" thread set me thinking. Paddington is
currently FGW territory. Liverpool St is "One Land". So when (yes when) Crossrail gets built how do the franchises align? Possibilities: 1) "Paddington (currently FGW) franchise" + "Liverpool St (currently One) franchise + a 3rd franchise for Crossrail bringing competition at both ends between the enw Crossrail franchise and the incumbents. (3 franchises) 2) One big franchise covering Paddington + Liverpool St + Crossrail (1 franchise) 3) One of the Paddington or Liverpool St incumbents gets to run Crossrail bringing competion to the area they don't currently serve.(2 franchises) 4) The incumbents remain in place and run Crossrail as a joint venture.(2 franchises + JV). Personally, I reckon FGW could do with some competition so I favour 1 or 4. |
Crossrail franchise
On Aug 2, 6:14 pm, "Graham Harrison"
wrote: The "Two Crossrail questions" thread set me thinking. Paddington is currently FGW territory. Liverpool St is "One Land". So when (yes when) Crossrail gets built how do the franchises align? Possibilities: 1) "Paddington (currently FGW) franchise" + "Liverpool St (currently One) franchise + a 3rd franchise for Crossrail bringing competition at both ends between the enw Crossrail franchise and the incumbents. (3 franchises) 2) One big franchise covering Paddington + Liverpool St + Crossrail (1 franchise) 3) One of the Paddington or Liverpool St incumbents gets to run Crossrail bringing competion to the area they don't currently serve.(2 franchises) 4) The incumbents remain in place and run Crossrail as a joint venture.(2 franchises + JV). Personally, I reckon FGW could do with some competition so I favour 1 or 4. Another option - as a result of Ken/Boris exercising his Mayoral powers over railways outside London - TfL assume responsiblity for Crossrail and lets the franchise as part of London Overground/ Underground ensuring that maximum connectivity with the existing TfL network - after all Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube. |
Crossrail franchise
On Aug 2, 6:14 pm, "Graham Harrison"
wrote: The "Two Crossrail questions" thread set me thinking. Paddington is currently FGW territory. Liverpool St is "One Land". So when (yes when) Crossrail gets built how do the franchises align? The White Paper seemed to imply a separate franchise for Crossrail. I wouldn't worry too much as to how Crossrail will fit into current franchises. In the last 10 years we have moved through three different models of franchise organisation/term. Crossrail is unlikely to be built for at least another 10 years, maybe even 15. Who is to know what franchises will look like that far ahead, never mind who will be running them. |
Crossrail franchise
On 2 Aug, 18:37, Bob wrote:
On Aug 2, 6:14 pm, "Graham Harrison" wrote: The "Two Crossrail questions" thread set me thinking. Paddington is currently FGW territory. Liverpool St is "One Land". So when (yes when) Crossrail gets built how do the franchises align? Possibilities: 1) "Paddington (currently FGW) franchise" + "Liverpool St (currently One) franchise + a 3rd franchise for Crossrail bringing competition at both ends between the enw Crossrail franchise and the incumbents. (3 franchises) 2) One big franchise covering Paddington + Liverpool St + Crossrail (1 franchise) 3) One of the Paddington or Liverpool St incumbents gets to run Crossrail bringing competion to the area they don't currently serve.(2 franchises) 4) The incumbents remain in place and run Crossrail as a joint venture.(2 franchises + JV). Personally, I reckon FGW could do with some competition so I favour 1 or 4. Another option - as a result of Ken/Boris exercising his Mayoral powers over railways outside London - TfL assume responsiblity for Crossrail and lets the franchise as part of London Overground/ Underground ensuring that maximum connectivity with the existing TfL network - after all Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube. This is certainly my favourite option! I think they should be given control of the entire London suburban rail network and run it as part of the Overground as franchises expire.. |
Crossrail franchise
On Aug 2, 6:58 pm, Neal wrote:
This is certainly my favourite option! I think they should be given control of the entire London suburban rail network and run it as part of the Overground as franchises expire.. It may have escaped your notice but Maidenhead and Shenfield are not part of London, so why should Ken or Boris run the trains that serve them? Fine by me if London ratepayers pick up the tab, but I somehow suspect that that's not the intention. To put it another way, if Ken or Boris should run those trains, why shouldn't they run all the trains that serve London? I somehow think that the people of Glasgow, Leeds, Manchester, etc, might have something to say about their trains to London being run by the MoL. Even if you exclude those trains, the London commuter-belt goes out a long way these days: Bournemouth, Bristol, Northampton, Grantham, Cambridge, Norwich, Southend. |
Crossrail franchise
On Aug 2, 7:11 pm, W14_Fishbourne wrote:
It may have escaped your notice but Maidenhead and Shenfield are not part of London, so why should Ken or Boris run the trains that serve them? Fine by me if London ratepayers pick up the tab, but I somehow suspect that that's not the intention. Indeed, but then neither are Amersham, Epping or Watford. In the 1930s this was solved by making the responsible body be a committee, with various representation from London, Essex, Hertfordshire, Middlesex, Kent, Buckinghamshire and Surrey. -- Abi |
Crossrail franchise
On Aug 2, 7:11 pm, W14_Fishbourne wrote:
It may have escaped your notice but Maidenhead and Shenfield are not part of London, so why should Ken or Boris run the trains that serve them? Maidenhead is about the same distance out as Chesham, and Shenfield's barely outside at all. It's the publicly stated aim of TfL to have more control over the inner-suburban network, and later this year they gain powers to negotiate changes to services on it. Since Crossrail is DfT/TfL led, I think it being TfL run is a safe bet, though it'll also be advertised as a National Rail service. A lot like the extended East London Line. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Crossrail franchise
wrote in message
oups.com On Aug 2, 7:46 pm, " wrote: On Aug 2, 7:11 pm, W14_Fishbourne wrote: It may have escaped your notice but Maidenhead and Shenfield are not part of London, so why should Ken or Boris run the trains that serve them? Fine by me if London ratepayers pick up the tab, but I somehow suspect that that's not the intention. Indeed, but then neither are Amersham, Epping or Watford. In the 1930s this was solved by making the responsible body be a committee, with various representation from London, Essex, Hertfordshire, Middlesex, Kent, Buckinghamshire and Surrey. -- Abi I think any discussion about Cross Rail is premature. Very. I cant seen any such line opening before 2016/7, even if it is approved, and if there is finance available. It's another Thameslink millstone...... With the binary Olympics mindset* currently prevailing, it's hard to imagine construction work on Crossrail starting before 2012. Given that it'll probably take another five years to build, 2017 does seem like the earliest likely opening date, assuming it's not abandoned long before that. * If you can put an Olympics tag on it, there are no funding or other obstacles; if not, forget it. |
Crossrail franchise
"W14_Fishbourne" wrote in message
oups.com... On Aug 2, 6:14 pm, "Graham Harrison" wrote: The "Two Crossrail questions" thread set me thinking. Paddington is currently FGW territory. Liverpool St is "One Land". So when (yes when) Crossrail gets built how do the franchises align? The White Paper seemed to imply a separate franchise for Crossrail. I wouldn't worry too much as to how Crossrail will fit into current franchises. In the last 10 years we have moved through three different models of franchise organisation/term. Crossrail is unlikely to be built for at least another 10 years, maybe even 15. Who is to know what franchises will look like that far ahead, never mind who will be running them. I seem to recall that in 1912 there was similar discussion about whether the Titanic's deck-chairs should be run on a different franchise. Regards Jonathan |
Crossrail franchise
Another option - as a result of Ken/Boris exercising his Mayoral
powers over railways outside London - TfL assume responsiblity for Crossrail and lets the franchise as part of London Overground/ Underground ensuring that maximum connectivity with the existing TfL network - after all Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube.- Hide quoted text - Building on my earlier suggestion - the Scottish (because they always are) Chancellor will no doubt appreciate that TfL control is a great way of making Boris responsible for getting the banks and property companies who will benefit from increased land values to stump up the cash for Crossrail - especially if at the same time making London shoulder the cost for any Jubilee line extension type cost overruns - (roughly in the same way the SNP have threatened Edinburgh Council with over run costs on the Edinburgh trams, or Border Councils with costs on the Waverley line.) By the way for those who don't feel they are part of London the Government is to allow the Mayor and TfL to increase or decrease service levels on trains outside the London boundary. No doubt some contributor can draw the boundaries of this influence - on Thameslink/FCC IIRC I think this will extend to Saint Albans. |
Crossrail franchise
"Bob" wrote in message oups.com... ....... - Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube.- Hide quoted text - I'm not sure this view is correct. Surely the way Crossrail trains will be sharing tracks on existing routes to Maidenhead, Shenfield and Abbey Wood, is just like Thameslink; the only main difference is their central London tunnel will be new, not secondhand... By the way for those who don't feel they are part of London the Government is to allow the Mayor and TfL to increase or decrease service levels on trains outside the London boundary. No doubt some contributor can draw the boundaries of this influence - on Thameslink/FCC IIRC I think this will extend to Saint Albans. No need to guess, the boundaries of TfL's influence were published on the DfT website, 'line by line', a couple of weeks ago; including the services to St Albans as you mentioned. They don't allow TfL to increase or decrease services unilaterally, though, but as follows: "The changes I have announced today will allow TfL to propose and pay for improvements on some key commuter services that start or end just outside the GLA boundary. At the same time the new arrangements make sure the interests of passengers from just outside London are protected by their own elected representatives." http://tinyurl.com/2fen9r I was looking at another forum last week where someone reckoned Ken had been given the listed network as part of London Rail - amazing how people can read too much into these announcements... Paul S |
Crossrail franchise
On Aug 2, 10:28 pm, "Paul Scott"
wrote: I'm not sure this view is correct. Surely the way Crossrail trains will be sharing tracks on existing routes to Maidenhead, Shenfield and Abbey Wood,is just like Thameslink; the only main difference is their central London tunnel will be new, not secondhand... There was a prolonged and at some stages heated debate about whether Crossrail should be built as full gauge inner city metro or be extended into the London surburban area. Destinations such as High Wycombe, Reading and Oxford were considered together with beyond Ebbsfleet siggestions http://dspace.dial.pipex.com/town/sq...007%202005.htm Uncle Roger covered the debate in the above article from the archive section of Informed Sources Alcydon Rail. The need to contain costs by containing risk won the day. It was suggested that the further Crossrail Trains went out into the country the greater was the possibility of knock on delays which would then affect the core central section - as happens from time to time with Thamesink. When the Crossrail Bill was introduced in Parliament there was a major row raised by those MPs whose constituencies fell just outside the Crossrail area especially from the honourable members for Reading. Now that Reading Station rebuild has been addressed in the HLOS there may a case for reviewing the case for wires beyond Maidenhead and minimising the dislocation effects of construction - although having seen the results of the Portsmouth blockade now might be a good to hide behind a barricade. |
Crossrail franchise
On Aug 2, 10:28 pm, "Paul Scott"
wrote: No need to guess, the boundaries of TfL's influence were published on the DfT website, 'line by line', a couple of weeks ago; including the services to St Albans as you mentioned. Would this be the list that included "* Services from Paddington, terminating at Slough;"? Funny, there haven't been any of those since Heathrow Connect was introduced over 2 years ago! Dear old DfT, on the ball as usual. Watch out for an announcement soon of plans to build a motorway round London. |
Crossrail franchise
Maybe I dreamed it, but didn't I read somewhere in the White Paper or
its supporting material that the building/operation of the central tunnel will be handed over to Network Rail? |
Crossrail franchise
An article and a leader from today's FT suggest dovetailing Thameslink
and Crossrail. http://www.ft.com/cms/s/f30a134a-413...0779fd2ac.html Quote Crossrail crawling closer to green light By Christopher Adams and Bob Sherwood Published: August 2 2007 22:49 | Last updated: August 2 2007 22:49 It has been a long time in coming. Now, after years of wrangling over the route, its vast cost and who should pay for it, Crossrail is inching closer to fruition. Political momentum behind the east-west rail route that would link Berkshire with Essex via Heathrow and Canary Wharf is growing. Ministers need no convincing of the economic benefits and the need to ease congestion on London's overcrowded commuter networks. Moreover, approval for Crossrail could help Labour in next year's London mayoral elections. A bill is being debated in the Commons and is expected to clear parliament next spring, paving the way for a swift start to construction. In theory, a green light could come by the autumn. In reality, this is far from guaranteed. Eighteen years on from its genesis, under Margaret Thatcher's premiership, the biggest stumbling block to Crossrail remains its financing, where a deal is as elusive as ever. As the government prepares for what one senior official called "tough discussions" with business, the London mayor and city transport authorities, it is the split between private and public funding that will be most difficult to resolve. The drawn-out negotiations, and the need to keep the project affordable, means recent projections for an opening as early as 2015 look optimistic. Even assuming agreement is reached by the time departmental spending totals are pencilled in for the next three years, Whitehall insiders expect slippage in the project's timetable. Services may be a decade away. According to the Institute for Fiscal Studies, there are a number of reasons why a more protracted timetable could suit the government. The institute says that an early start to Crossrail's construction, well before building work on the 2012 London Olympic Games is complete, could contribute to a spending squeeze, in part because the two projects would be competing for similar suppliers. It says that a modest delay might allow the scheme to be built more cheaply. There are, also, wider implications for the public finances, the IFS says. Were the extra demands on the construction industry from parallel work on the Olympics and Crossrail to inflate the rail project's bill, the prospect of breaking one of Gordon Brown's fiscal rules - to keep net debt at a stable and prudent level - may increase. Public sector net debt was forecast by the Treasury in this year's Budget to be 38.2 per cent of national income in 2007-08, rising to 38.8 per cent in 2009-10 and 2010-11, before dropping back to 38.6 per cent of national income. Carl Emmerson, IFS deputy director, says that, assuming Alistair Darling, the chancellor, adheres to the 40 per cent limit on debt imposed by Mr Brown, then "significant new projects would be difficult" during the period covered by the pending review. "It might not be possible for new significant projects to go ahead without squeezing other investment programmes," he says. Putting off Crossrail's construction "might make it easier to deliver the project in a cost-effective way". Staggering demand for suppliers could contain the expense. Douglas Oakervee, Cross London Rail Link's chief executive, insists that the timing of the two projects should dovetail. His team has completed modelling that shows workers could migrate to Crossrail. This has allayed the concerns of some in government. And the Treasury has said nothing to suggest the fiscal rules are a constraint. Even so, it would be a brave man that banked on a 2015 start for train services. Copyright The Financial Times Limited 2007 http://www.ft.com/cms/s/7c1a3e0a-412...0779fd2ac.html The government must tackle infrastructure problems Published: August 2 2007 20:02 | Last updated: August 2 2007 20:02 Only in Britain would people think the chance of securing a new train line to be the chief virtue of hosting the Olympics. Now, completion of the east-west Crossrail link before the 2012 Games remains in doubt. And in a context of tight infrastructure spending, Londoners seem doomed to making do with water pipes laid in Victorian times, Underground stations that look as if they had their last makeover when they were serving as wartime bomb shelters. Unhappy commuters aside, the state of British infrastructure is a real constraint on economic growth. France cites its sleek infrastructure - ranging from high-speed trains to cheap nuclear power - as one of the top attractions for foreign investors. By contrast, "Heathrow hassle" is proving a compelling reason for international executives to avoid London, and the CBI employers' body cites infrastructure problems among its top concerns. Nor is it simply a London issue. Business leaders in all corners of the UK are complaining of missed meetings and pessing for better east- west road links, upgrading of congested northern motorways, more runways and better access to regional airports. The government's focus, judging by July's rail policy paper, is on in- creasing capacity through pragmatic improvements to existing networks rather than splashy new investments, through longer trains rather than a new north-south line. This bias against grand projects is sensible, given that the UK's main constraints stem from congestion rather than a lack of connections. But with businesses and passengers set to make a higher financial contribution - through road-pricing, rail fares and possible supplementary rates - the government needs to translate its policy into rapid and tangible improvements. One area where it could show more ambition would be in accelerating the planned pilots for road-pricing schemes - potentially sweetening their introduction for motorists by dedicating receipts to further infrastructure investment. A swift conclusion to the competition authorities' investigation of BAA's airport monopoly would also lessen frustrations, as would a real move to eliminate the uncertainties of the planning process for major projects. Finally, there is Crossrail - rapidly,becoming a symbol of government prevarication over infrastructure investment. It is time to set a firm date for starting - and completing - Crossrail.The private sector must be involved early in talks over funding. It is time the government moved Britain beyond the Victorian era. Copyright The Financial Times Limited 2007 Unquote l |
Crossrail franchise
"Bob" wrote in message oups.com... http://www.ft.com/cms/s/7c1a3e0a-412...0779fd2ac.html The government must tackle infrastructure problems Published: August 2 2007 20:02 | Last updated: August 2 2007 20:02 Only in Britain would people think the chance of securing a new train line to be the chief virtue of hosting the Olympics. Now, completion of the east-west Crossrail link before the 2012 Games remains in doubt. There's an understatement - look at the timescales from now for the ELLX , late 2010? - or Thameslink phase 1, 2011?? The outstanding work in both cases is comparatively trivial compared to Crossrail, surely... Paul |
Crossrail franchise
On Aug 2, 7:11 pm, W14_Fishbourne wrote:
To put it another way, if Ken or Boris should run those trains, why shouldn't they run all the trains that serve London? I somehow think that the people of Glasgow, Leeds, Manchester, etc, might have something to say about their trains to London being run by the MoL. I don't really mind who runs my trains as long as they're clueful. If a rail-friendly body like the Scottish Executive (or, indeed, TfL) would like to annex Oxfordshire and take it out of the hands of the muppets at the DfT, that's just fine with me. Richard |
Crossrail franchise
On Thu, 2 Aug 2007, Paul Scott wrote:
"Bob" wrote in message oups.com... ....... - Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube.- Hide quoted text - I'm not sure this view is correct. Surely the way Crossrail trains will be sharing tracks on existing routes to Maidenhead, Shenfield and Abbey Wood, is just like Thameslink; the only main difference is their central London tunnel will be new, not secondhand... AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. In the east, there will still be non-Crossrail services on the GEML slows, but i think they'll all be Shenfield - Liverpool Street, so sort of a second service of Crossrail - in fact, it would make a lot of sense to have the Crossrail operator run them, rather than the GE franchisee. By the way for those who don't feel they are part of London the Government is to allow the Mayor and TfL to increase or decrease service levels on trains outside the London boundary. No doubt some contributor can draw the boundaries of this influence - on Thameslink/FCC IIRC I think this will extend to Saint Albans. No need to guess, the boundaries of TfL's influence were published on the DfT website, 'line by line', a couple of weeks ago; including the services to St Albans as you mentioned. http://tinyurl.com/2fen9r This sounds like the stealthy implementation of the 'london regional rail authority' plan that Bob Kiley floated early in his reign. I can't find a map or report about that, but Dave says the boundary proposed was: * Chiltern: Aylesbury via Amersham & High Wycombe * Silverlink: Metro services to Watford Junction, the Croxley Link and Watford - St Albans Abbey * Thameslink: Luton to Gatwick Airport * Great Northern: Stevenage * West Anglia: Hertford East & Stansted Airport * Great Eastern: Shenfield * LTS: Basildon & Tilbury * Kent Link: Dartford * South Eastern: Swanley, Otford & Sevenoaks * South Central: Oxted, Gatwick Airport, Caterham, Tattenham Corner, Epsom Downs, Dorking * South West: Guildford, Working, Shepperton, Virginia Water, Windsor & Eton Riverside * Great Western: Slough / Windsor & Eton Central The boundary in the GNN report you cite is a bit smaller. tom -- Standing on the shoulders of Google |
Crossrail franchise
On Fri, 3 Aug 2007 16:54:34 +0100, Tom Anderson wrote:
....... - Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube.- Hide quoted text - I'm not sure this view is correct. Surely the way Crossrail trains will be sharing tracks on existing routes to Maidenhead, Shenfield and Abbey Wood, is just like Thameslink; the only main difference is their central London tunnel will be new, not secondhand... AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. What happens to GWML freight? Surely it won't use the fast lines - will it all be sent round via Staines? |
Crossrail franchise
"asdf" wrote in message ... On Fri, 3 Aug 2007 16:54:34 +0100, Tom Anderson wrote: ....... - Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube.- Hide quoted text - I'm not sure this view is correct. Surely the way Crossrail trains will be sharing tracks on existing routes to Maidenhead, Shenfield and Abbey Wood, is just like Thameslink; the only main difference is their central London tunnel will be new, not secondhand... AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. What happens to GWML freight? Surely it won't use the fast lines - will it all be sent round via Staines? I got the same idea as Tom from various press reports. They are wrong. I don't know what will happen to freight but, at the very least, I expect the Mendip stone trains to continue. There will also be a two train per hour service Reading/Twyford/Maidenhead/Slough/Hayes/Ealing/Paddington and another two trains all stations Reading to Slough according to recent letters in the Maidenhead Advertiser. The Greenford service will be reduced to a shuttle from West Ealing. |
Crossrail franchise
At 11:25:17 on Fri, 3 Aug 2007 Paul Scott opined:-
"Bob" wrote in message roups.com... http://www.ft.com/cms/s/7c1a3e0a-412...0779fd2ac.html The government must tackle infrastructure problems Published: August 2 2007 20:02 | Last updated: August 2 2007 20:02 Only in Britain would people think the chance of securing a new train line to be the chief virtue of hosting the Olympics. Now, completion of the east-west Crossrail link before the 2012 Games remains in doubt. There's an understatement - look at the timescales from now for the ELLX , late 2010? - or Thameslink phase 1, 2011?? The outstanding work in both cases is comparatively trivial compared to Crossrail, surely... I seem to remember that, even before that disastrous day when London was awarded the Olympics, it was stated that Crossrail would not be completed before 1913. Why didn't they go for the 1916 Olympics? -- Thoss |
Crossrail franchise
On Fri, 3 Aug 2007 19:44:18 +0100, thoss wrote:
Only in Britain would people think the chance of securing a new train line to be the chief virtue of hosting the Olympics. Now, completion of the east-west Crossrail link before the 2012 Games remains in doubt. There's an understatement - look at the timescales from now for the ELLX , late 2010? - or Thameslink phase 1, 2011?? The outstanding work in both cases is comparatively trivial compared to Crossrail, surely... I seem to remember that, even before that disastrous day when London was awarded the Olympics, it was stated that Crossrail would not be completed before 1913. Why didn't they go for the 1916 Olympics? Your brain seems to be suffering from the millennium bug. And yes, it has been the case for a number of years that the project could not have been completed before 2013. |
Crossrail franchise
On Fri, 3 Aug 2007 17:57:01 +0100, Graham Harrison wrote:
AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. What happens to GWML freight? Surely it won't use the fast lines - will it all be sent round via Staines? I got the same idea as Tom from various press reports. They are wrong. I don't know what will happen to freight but, at the very least, I expect the Mendip stone trains to continue. There will also be a two train per hour service Reading/Twyford/Maidenhead/Slough/Hayes/Ealing/Paddington and another two trains all stations Reading to Slough according to recent letters in the Maidenhead Advertiser. This service pattern, of course, is only part of the plan for if Crossrail ends at Maidenhead. |
Crossrail franchise
"thoss" wrote in message ... At 11:25:17 on Fri, 3 Aug 2007 Paul Scott opined:- "Bob" wrote in message groups.com... http://www.ft.com/cms/s/7c1a3e0a-412...0779fd2ac.html The government must tackle infrastructure problems Published: August 2 2007 20:02 | Last updated: August 2 2007 20:02 Only in Britain would people think the chance of securing a new train line to be the chief virtue of hosting the Olympics. Now, completion of the east-west Crossrail link before the 2012 Games remains in doubt. There's an understatement - look at the timescales from now for the ELLX , late 2010? - or Thameslink phase 1, 2011?? The outstanding work in both cases is comparatively trivial compared to Crossrail, surely... I seem to remember that, even before that disastrous day when London was awarded the Olympics, it was stated that Crossrail would not be completed before 1913. Why didn't they go for the 1916 Olympics? It was cancelled due to WW1 IIRC... Paul |
Crossrail franchise
On Aug 3, 4:54 pm, Tom Anderson wrote:
AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. From the opening of the committee on Jan 2006: "On the Great Western main line Crossrail will share the slow or so- called relief lines with freight and complementary passenger services to Reading. The intercity services and Heathrow will continue to use the fast or main lines during normal operation." http://www.publications.parliament.u...-i/uc83702.htm I don't think things have changed. The other services are all stops Reading-Slough, plus the Reading-Paddington semi-fast is meant to have same-platform interchange at Ealing Broadway, which means relief lines. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Crossrail franchise
"Tom Anderson" wrote AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. AIUI Crossrail won't have exclusive use of the Relief Lines - freight and, if Crossrail terminates at Maidenhead, a Paddington - (intermediate stops) - Maidenhead - Twyford - Reading service will continue, though Crossrail will be able to dictate the paths other operators may use. Provision of a diveunder at Acton (for freight joining from Acton Wells or Acton Yard) is indicative that freight will continue to use teh Relief Lines. Peter |
Crossrail franchise
On Fri, 3 Aug 2007, Graham Harrison wrote:
"asdf" wrote in message ... On Fri, 3 Aug 2007 16:54:34 +0100, Tom Anderson wrote: ....... - Crossrail has unlike Thameslink not been designed as an equivalent RER but merely a full gauge fast tube.- Hide quoted text - I'm not sure this view is correct. Surely the way Crossrail trains will be sharing tracks on existing routes to Maidenhead, Shenfield and Abbey Wood, is just like Thameslink; the only main difference is their central London tunnel will be new, not secondhand... AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. What happens to GWML freight? Surely it won't use the fast lines - will it all be sent round via Staines? I got the same idea as Tom from various press reports. They are wrong. I got the idea from one of the rail study reports - but as i established in another thread, those are also wrong! There will also be a two train per hour service Reading/Twyford/Maidenhead/Slough/Hayes/Ealing/Paddington and another two trains all stations Reading to Slough according to recent letters in the Maidenhead Advertiser. Letters from someone authoritative, i take it? Regardless, Thanters' quote from the select committee says the same thing, and that's as authoritative as it gets (apart from Clive, of course). tom -- Mathematics is the door and the key to the sciences. -- Roger Bacon |
Crossrail franchise
"Peter Masson" wrote in message ... "Tom Anderson" wrote AIUI, there won't be a huge amount of track-sharing. Crossrail gets exclusive use of the slow tracks on the GWML, although it'll share with HEx from Airport Junction to Heathrow Central. AIUI Crossrail won't have exclusive use of the Relief Lines - freight and, if Crossrail terminates at Maidenhead, a Paddington - (intermediate stops) - Maidenhead - Twyford - Reading service will continue, though Crossrail will be able to dictate the paths other operators may use. Provision of a diveunder at Acton (for freight joining from Acton Wells or Acton Yard) is indicative that freight will continue to use teh Relief Lines. This map was pointed out recently on ORR site, gives a fair idea of the impact of crossrail on the existing lines... http://www.rail-reg.gov.uk/upload/pd...le_line_GW.pdf Paul |
Crossrail franchise
thoss wrote:
At 11:25:17 on Fri, 3 Aug 2007 Paul Scott opined:- "Bob" wrote in message oups.com... http://www.ft.com/cms/s/7c1a3e0a-412...0779fd2ac.html The government must tackle infrastructure problems Published: August 2 2007 20:02 | Last updated: August 2 2007 20:02 Only in Britain would people think the chance of securing a new train line to be the chief virtue of hosting the Olympics. Now, completion of the east-west Crossrail link before the 2012 Games remains in doubt. There's an understatement - look at the timescales from now for the ELLX , late 2010? - or Thameslink phase 1, 2011?? The outstanding work in both cases is comparatively trivial compared to Crossrail, surely... I seem to remember that, even before that disastrous day when London was awarded the Olympics, it was stated that Crossrail would not be completed before 1913. Why didn't they go for the 1916 Olympics? Berlin was in line for that, but there was a problem with the wrong sort of kaiser. AIUI there was no plan to complete Crossrail by 2012, but people just assumed it would be done by then, and perhaps Crossrail's backers didn't do all they could to dispel the impression many people had got. -- Arthur Figgis Surrey, UK |
Crossrail franchise
On Fri, 3 Aug 2007, Paul Scott wrote:
This map was pointed out recently on ORR site, gives a fair idea of the impact of crossrail on the existing lines... http://www.rail-reg.gov.uk/upload/pd...le_line_GW.pdf Interesting! Just west of the portal is a feature comprising a plethora of crossovers, a two-track siding, through lines and a platform around the whole lot. I assume this is the famous Westbourne Park turnback siding. I read recently that it would be possible for passengers to be turned off the train here; i assume that's what the platform's for. However, the map makes it look like there will be platform faces on the through lines as well. Is this then, in effect, a station? Just one where no trains will stop? tom -- Technology is anything that wasn't around when you were born. -- Alan Kay |
Crossrail franchise
Tom Anderson wrote:
On Fri, 3 Aug 2007, Paul Scott wrote: This map was pointed out recently on ORR site, gives a fair idea of the impact of crossrail on the existing lines... http://www.rail-reg.gov.uk/upload/pd...le_line_GW.pdf Interesting! Just west of the portal is a feature comprising a plethora of crossovers, a two-track siding, through lines and a platform around the whole lot. I assume this is the famous Westbourne Park turnback siding. I read recently that it would be possible for passengers to be turned off the train here; i assume that's what the platform's for. However, the map makes it look like there will be platform faces on the through lines as well. Not necessarily. The map makes no distinction between a platform edge facing the track and the back of a single platform bounded by a wall. Look at platforms 1 and 12 at Paddington, for example. However, one would expect a turnback siding with two tracks would have at most an island platform bewteen the tracks. Perhaps there is an intention to have platforms on the running lines here for emergency use. -- Richard J. (to email me, swap 'uk' and 'yon' in address) |
Crossrail franchise
Tom Anderson wrote:
Just west of the portal is a feature comprising a plethora of crossovers, a two-track siding, through lines and a platform around the whole lot. I assume this is the famous Westbourne Park turnback siding. I read recently that it would be possible for passengers to be turned off the train here; i assume that's what the platform's for. However, the map makes it look like there will be platform faces on the through lines as well. Is this then, in effect, a station? Just one where no trains will stop? The environmental statement specifically states the sidings will have four tracks/platforms, so I'm surprised to see there aren't two running lines in addition. The northernmost platform appears to double as the eastbound running line. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Crossrail franchise
On Sat, 4 Aug 2007, Mr Thant wrote:
Tom Anderson wrote: Just west of the portal is a feature comprising a plethora of crossovers, a two-track siding, through lines and a platform around the whole lot. I assume this is the famous Westbourne Park turnback siding. I read recently that it would be possible for passengers to be turned off the train here; i assume that's what the platform's for. However, the map makes it look like there will be platform faces on the through lines as well. Is this then, in effect, a station? Just one where no trains will stop? The environmental statement specifically states the sidings will have four tracks/platforms, so I'm surprised to see there aren't two running lines in addition. The northernmost platform appears to double as the eastbound running line. It says: "8.3.6 A reversing facility will be constructed at Westbourne Park, to the west of Royal Oak portal to enable Crossrail trains terminating at Paddington to turn around. To meet safety requirements that all trains are cleared of passengers before going out of service, Crossrail must provide a facility where trains terminating at Paddington can be inspected. To ensure that services following behind are not significantly delayed, the facility needs to ensure that trains being inspected can be overtaken or two trains can be inspected concurrently. "8.3.7 The reversing facility will consist of: - two 210 m length island platforms and four tracks; and - emergency access to/from the street via footbridges." The key phrase seems to me to be "trains being inspected can be overtaken or two trains can be inspected concurrently"; the 'or' means that you need to be able to have a through train overtake a single stopped train, or to have two trains stopped at once. Two roads in either direction does that. Now, this description, and the maps attatched, indicate that we've got an Edgware Road-like setup, with all four roads going through around two islands. The diagram i was commenting on above shows something different - through lines at the edge, and terminating bays in the middle. I assume that's just out of date. tom -- Love as a principle and order as the basis; progress as the goal. |
Crossrail franchise
In article , Paul Scott
writes This map was pointed out recently on ORR site, gives a fair idea of the impact of crossrail on the existing lines... http://www.rail-reg.gov.uk/upload/pd...le_line_GW.pdf It would appear that a turntable is going to be added to North Pole Depot! I also note that the new eastern access to North Pole is curiously indirect. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Crossrail franchise
"Clive D. W. Feather" wrote in message ... In article , Paul Scott writes This map was pointed out recently on ORR site, gives a fair idea of the impact of crossrail on the existing lines... http://www.rail-reg.gov.uk/upload/pd...le_line_GW.pdf It would appear that a turntable is going to be added to North Pole Depot! I also note that the new eastern access to North Pole is curiously indirect. -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: The turntable is presumably a like-for-like replacement for the one at the current Old Oak Common depot, which EWS seem to be ceding to Crossrail. The access to North Pole seems indirect, but this is presumably to allow use of the existing carriage line flyover towards the Relief lines, rather than having a direct access to the Down Main, which would mean all light engine workings etc having to cross the Up Main on the flat. How much use do EWS make of their current depot at Old Oak at present- it seems to be largely a repository for stored stock. The North Pole premises would seem to be somewhat overspecified, unless the idea is also to transfer FGW HST maintenance or servicing there. Brian |
Crossrail franchise
In article , BH Williams
writes The access to North Pole seems indirect, but this is presumably to allow use of the existing carriage line flyover towards the Relief lines, rather than having a direct access to the Down Main, which would mean all light engine workings etc having to cross the Up Main on the flat. That's not what I mean. The plan shows an access from the Down Main at Portobello Junction, but any train making that access will have to run half way to the flyover, shunt backwards into a headshunt, then run forwards into the depot. One additional crossover anywhere between Portobello and the flyover would make things a lot simpler. Obviously you want access off the flyover, and that will require use of the headshunt. But why force the double reverse on anything coming out of the south side of Paddy? -- Clive D.W. Feather | Home: Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org Fax: +44 870 051 9937 | Work: Please reply to the Reply-To address, which is: |
Crossrail franchise
On Aug 6, 4:46 pm, "Clive D. W. Feather" cl...@on-the-
train.demon.co.uk wrote: Obviously you want access off the flyover, and that will require use of the headshunt. But why force the double reverse on anything coming out of the south side of Paddy? The layout at Shenfield is equally curious: http://www.rail-reg.gov.uk/upload/pd...le_line_GE.pdf Why is the Southend down diveunder connected solely to the Crossrail up platform? Also, no crossovers are shown in the central section: http://www.rail-reg.gov.uk/upload/pd...central_SE.pdf Unless I've missed something, there should be one east of Farringdon. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Crossrail franchise
On Thu, 02 Aug 2007 11:11:55 -0700, W14_Fishbourne
wrote: On Aug 2, 6:58 pm, Neal wrote: This is certainly my favourite option! I think they should be given control of the entire London suburban rail network and run it as part of the Overground as franchises expire.. It may have escaped your notice but Maidenhead and Shenfield are not part of London, so why should Ken or Boris run the trains that serve them? Fine by me if London ratepayers pick up the tab, but I somehow suspect that that's not the intention. To put it another way, if Ken or Boris should run those trains, why shouldn't they run all the trains that serve London? I somehow think that the people of Glasgow, Leeds, Manchester, etc, might have something to say about their trains to London being run by the MoL. Even if you exclude those trains, the London commuter-belt goes out a long way these days: Bournemouth, Bristol, Northampton, Grantham, Cambridge, Norwich, Southend. In New York, the Connecticut commuter trains are run jointly by the Connecticut Dept. of Transportation and the Metropolitan Transportation Authority. They pay for the line in accordance with the proportion of trackage in each state. No reason why TfL shouldn't run Crossrail with Essex along the same lines. -- Chris Hansen | chrishansenhome at btinternet dot com | http://www.christianphansen.com | http://chrishansenhome.livejournal.com |
Crossrail franchise
On 6 Aug, 18:38, Mr Thant
wrote: Also, no crossovers are shown in the central section:http://www.rail-reg.gov.uk/upload/pd...ingle_line_cen... Unless I've missed something, there should be one east of Farringdon. ISTR this got dropped at some point during the consultation process, because it would've been underneath something highly breakable. -- John Band john at johnband dot org www.johnband.org |
Crossrail franchise
On Mon, 6 Aug 2007, Mr Thant wrote:
On Aug 6, 4:46 pm, "Clive D. W. Feather" cl...@on-the- train.demon.co.uk wrote: Obviously you want access off the flyover, and that will require use of the headshunt. But why force the double reverse on anything coming out of the south side of Paddy? The layout at Shenfield is equally curious: http://www.rail-reg.gov.uk/upload/pd...le_line_GE.pdf Why is the Southend down diveunder connected solely to the Crossrail up platform? It's not - look at the colours again; Crossrail only uses the northernmost island, via the existing track to the south of it (in orange), plus a new stub on the north side (in red). The down Southend is accessed from the blue and black track which runs past the north side of the middle island. Furthermore, if you look at the mess of pointwork to the west, it looks like there's a way to get trains from the slows to the Crossrail platform without conflicting with moves from the fasts to the non-Crossrail platforms: trains coming in on the down slow take the westernmost slip linking that line to the new loop that leads into the new northern terminating track; leaving, they take the slip onto the current down slow (resignalled for up trains), and then the westernmost new slip linking the current up and down slows. That would mean no Crossrail train ever runs on the current up slow east of the westernmost new slip, and so trains coming along the down fast and bound for Southend can use this, reached via the new slip linking the down fast to the current up slow, to get to the middle island and the down Southend. The odd thing is that you can't reach the southern face of the northern island that way: there would have to be a crossover in place of the slip that leads from the current down slow to the new Crossrail terminating track. This only creates conflict between Crossrail trains arriving into the southern platform and those departing the northern platform, though; there's no conflict with trains on the fasts. If enough things are bidirectionally signalled, then such a conflict could be smoothed over by working the departing train into the new loop, passing the arriving train on the wrong side, then reaching the up slow via two slips (one new, one old) in rapid succession. If there was another train arriving at that point, it would hit it, but there won't be. Also, no crossovers are shown in the central section: http://www.rail-reg.gov.uk/upload/pd...central_SE.pdf That seems like a really bad idea. Any problem in the tunnel means reversing everything at the portals. tom -- OK, mostly because of Tom, but not only because of his bloody irritating character and songs. |