Ongoing work at Finchley Central
Hi,
I travel from Finchley Central to Moorgate each morning and I am curious as to what they are doing along at the top of the bank near the station entrance at Finchley Central. They seem to have been working on it for months but as I pass through as quick as possible at that time in the morning (or on the way home for that matter) not realy had a chance to stop and ask what they are doing. Also on the nothbound platform they have taken away the old steps going up to the bridge that had been blocked off, but they seem to be doing more than just taking them away. Thanks Andy |
Ongoing work at Finchley Central
In article om,
AndyColeman wrote: I travel from Finchley Central to Moorgate each morning and I am curious as to what they are doing along at the top of the bank near the station entrance at Finchley Central. They seem to have been working on it for months but as I pass through as quick as possible at that time in the morning (or on the way home for that matter) not realy had a chance to stop and ask what they are doing. I'm in a similar boat (except I arrive at Finchley in the morning). I guess it it to install a MIP lift for access to the southbound platform... Also on the nothbound platform they have taken away the old steps going up to the bridge that had been blocked off, but they seem to be doing more than just taking them away. .... and this is to install a MIP lift to access the northbound platforms. -- Shenanigans! Shenanigans! Best of 3! -- Flash |
Ongoing work at Finchley Central
On Wed, 29 Aug 2007 05:34:34 -0700, AndyColeman
wrote: Hi, I travel from Finchley Central to Moorgate each morning and I am curious as to what they are doing along at the top of the bank near the station entrance at Finchley Central. They seem to have been working on it for months but as I pass through as quick as possible at that time in the morning (or on the way home for that matter) not realy had a chance to stop and ask what they are doing. Also on the nothbound platform they have taken away the old steps going up to the bridge that had been blocked off, but they seem to be doing more than just taking them away. It is to provide mobility impaired lifts. These are contracted works as part of the PPP. The same type of work is being done at Golders Green and Hendon Central on the Northern Line. -- Paul C Admits to working for London Underground! |
Ongoing work at Finchley Central
"Paul Corfield" wrote in message ... It is to provide mobility impaired lifts. These are contracted works as part of the PPP. The same type of work is being done at Golders Green and Hendon Central on the Northern Line. You mean, step free access (SFA) lifts, don't you? ;-) |
Ongoing work at Finchley Central
On Fri, 31 Aug 2007, Robin Mayes wrote:
"Paul Corfield" wrote in message ... It is to provide mobility impaired lifts. These are contracted works as part of the PPP. The same type of work is being done at Golders Green and Hendon Central on the Northern Line. You mean, step free access (SFA) lifts, don't you? ;-) Can i use them if i've got a big suitcase? tom -- 10 PARTY : GOTO 10 |
Ongoing work at Finchley Central
On Fri, 31 Aug 2007 08:02:30 GMT, "Robin Mayes"
wrote: "Paul Corfield" wrote in message .. . It is to provide mobility impaired lifts. These are contracted works as part of the PPP. The same type of work is being done at Golders Green and Hendon Central on the Northern Line. You mean, step free access (SFA) lifts, don't you? ;-) Whatever! -- Paul C Admits to working for London Underground! |
Ongoing work at Finchley Central
"Robin Mayes" wrote in message o.uk... "Paul Corfield" wrote in message ... It is to provide mobility impaired lifts. These are contracted works as part of the PPP. The same type of work is being done at Golders Green and Hendon Central on the Northern Line. You mean, step free access (SFA) lifts, don't you? ;-) Well, going through KX the other day there's a "MIP 3" (according to the sign above it) lift up to street level from the circulating area at the top of the escalators. So unless the ITB have changed the current "flavour of the month" designation since KX was remodeled, Mobility Impaired works for me... -- Cheers, Steve. Change jealous to sad to reply. |
Ongoing work at Finchley Central
On 31 Aug, 20:32, "Steve Dulieu"
wrote: You mean, step free access (SFA) lifts, don't you? ;-) Well, going through KX the other day there's a "MIP 3" (according to the sign above it) lift up to street level from the circulating area at the top of the escalators. So unless the ITB have changed the current "flavour of the month" designation since KX was remodeled, Mobility Impaired works for me... There's an ongoing 'discussion' regarding these signs... |
Ongoing work at Finchley Central
|
All times are GMT. The time now is 03:20 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk