Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
SWT's advance engineering works info for the Easter weekend shows a 6 tph
service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul |
#2
![]() |
|||
|
|||
![]()
On Jan 14, 4:48*pm, "Paul Scott"
wrote: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. *Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website:http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul I would have thought that the single track approach to East Putney and crossing all the Putney tracks on the flat might be a bigger problem. Avoiding both Putney trains and District line trains either side of the junction must be quite a challenge. |
#3
![]() |
|||
|
|||
![]() Paul Scott wrote: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul My understanding was that when the Putney to Wimbledon stretch was handed over to LUL at privatisation, there was an agreement reached with regards to continuing 'National Rail' use of the line - and it is under this agreement that SWT makes use of the line for diversionary purposes. Given that SWT do find it a valuable route (as demonstrated by the use they'll be making of it at Easter), one can't see them (or the DfT) being keen on ending that agreement. Therefore, the onus would seem to fall on LUL ensuring that any future resignalling on this line can accommodate National Rail trains. |
#4
![]() |
|||
|
|||
![]()
On 14 Jan, 17:01, MIG wrote:
On Jan 14, 4:48 pm, "Paul Scott" wrote: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website:http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul I would have thought that the single track approach to East Putney and crossing all the Putney tracks on the flat might be a bigger problem. I forget how the lines there are paired - UIVMM it changed fairly recently. But the single track up to East Putney is on the southern side of the four mainline tracks and hence comes off one of the down lines - so up trains are the ones that will cause more disturbances here. (Without looking at Quail, which isn't to hand, I forget which location Point Pleasant junction actually refers to - the junction with the mainline or with the District line at East Putney station.) Avoiding both Putney trains and District line trains either side of the junction must be quite a challenge. Though LUL contracts Network Rail to signal the line from East Putney (or from Putney Bridge in fact) down to Wimbledon, so theoretically at least there could be a slightly more co-ordinated approach (or just a jam of backed up District line trains being held at East Putney so a diverted SWT service can get down there first). |
#5
![]() |
|||
|
|||
![]() "Mizter T" wrote in message ... Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? My understanding was that when the Putney to Wimbledon stretch was handed over to LUL at privatisation, there was an agreement reached with regards to continuing 'National Rail' use of the line - and it is under this agreement that SWT makes use of the line for diversionary purposes. Given that SWT do find it a valuable route (as demonstrated by the use they'll be making of it at Easter), one can't see them (or the DfT) being keen on ending that agreement. Therefore, the onus would seem to fall on LUL ensuring that any future resignalling on this line can accommodate National Rail trains. There was a discussion recently that quoted TfL as saying SWT wouldn't be allowed on the line after resignalling unless they fitted all their stock (that might need to use the line) with trip cocks... Paul |
#6
![]() |
|||
|
|||
![]()
On 14 Jan, 18:02, "Paul Scott" wrote:
"Mizter T" wrote in message ... Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? My understanding was that when the Putney to Wimbledon stretch was handed over to LUL at privatisation, there was an agreement reached with regards to continuing 'National Rail' use of the line - and it is under this agreement that SWT makes use of the line for diversionary purposes. Given that SWT do find it a valuable route (as demonstrated by the use they'll be making of it at Easter), one can't see them (or the DfT) being keen on ending that agreement. Therefore, the onus would seem to fall on LUL ensuring that any future resignalling on this line can accommodate National Rail trains. There was a discussion recently that quoted TfL as saying SWT wouldn't be allowed on the line after resignalling unless they fitted all their stock (that might need to use the line) with trip cocks... Paul Oh really - I missed that. I wonder if that quoted comment is accurate. It's just that one party unilaterally changing the terms of an agreement sounds unlikely. That said, I don't know anything about the details of the agreement whatsoever. What I'm almost totally ignorant on is what's going to happen to signalling after the upgrade - I was under the vague impression that the LU SSLs were ditching the whole trip cock system altogether. |
#7
![]() |
|||
|
|||
![]()
On Jan 14, 5:47*pm, Mizter T wrote:
On 14 Jan, 17:01, MIG wrote: On Jan 14, 4:48 pm, "Paul Scott" wrote: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. *Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website:http://www.southwesttrains.co.uk/SWT...Easter2008.htm Presumably this will all be a bit harder to organise if/when TfL take full responsibility for the line at some time in the future, such as at SSL resignalling? Paul I would have thought that the single track approach to East Putney and crossing all the Putney tracks on the flat might be a bigger problem. I forget how the lines there are paired - UIVMM it changed fairly recently. But the single track up to East Putney is on the southern side of the four mainline tracks and hence comes off one of the down lines - so up trains are the ones that will cause more disturbances here. (Without looking at Quail, which isn't to hand, I forget which location Point Pleasant junction actually refers to - the junction with the mainline or with the District line at East Putney station.) They are paired by direction, but it's a bit odd in that the down fast is the outer, while the up slow is the outer on the other side. So if diverted trains used fast tracks, it would minimise the disruption (or maximise it if they used the slow tracks). In fact, it looks like you can't reach the up slow track anyway. Point Pleasant seems to be the section between the mainline and the side platforms at East Putney (the join to the District coming south of the station). Avoiding both Putney trains and District line trains either side of the junction must be quite a challenge. Though LUL contracts Network Rail to signal the line from East Putney (or from Putney Bridge in fact) down to Wimbledon, so theoretically at least there could be a slightly more co-ordinated approach (or just a jam of backed up District line trains being held at East Putney so a diverted SWT service can get down there first). By the way, I've often seen empty stock going that way in the last year or two, using the down fast at the end of the morning peak. I assume that sort of thing is regular. |
#8
![]() |
|||
|
|||
![]()
"Paul Scott" wrote in
: SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm http://www.tfl.gov.uk/assets/livetra...me/tube/track- closures.pdf has work for that weekend as affecting: "Baker Street to Hammersmith (Hammersmith & City) - No Circle - Earl's Court to Edgware Road (District)" So I'd suggest the Edware Road-Wimbledon service won't run atall which frees up the required paths from East Putney. David |
#9
![]() |
|||
|
|||
![]()
On Mon, 14 Jan 2008 12:51:02 -0600, David Jackman pleasereplytogroup
wrote: "Paul Scott" wrote in : SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm http://www.tfl.gov.uk/assets/livetra...me/tube/track- closures.pdf has work for that weekend as affecting: "Baker Street to Hammersmith (Hammersmith & City) - No Circle - Earl's Court to Edgware Road (District)" So I'd suggest the Edware Road-Wimbledon service won't run atall which frees up the required paths from East Putney. The above seems to imply that Wimbleware trains will be reversing at Earls/Earl's Court (via Triangle Sidings?). |
#10
![]() |
|||
|
|||
![]()
On 14 Jan, 20:06, Charles Ellson wrote:
On Mon, 14 Jan 2008 12:51:02 -0600, David Jackman pleasereplytogroup wrote: "Paul Scott" wrote in : SWT's advance engineering works info for the Easter weekend shows a 6 tph service through East Putney. *Will this result in a much reduced District Line service? "Two Basingstoke/Alton to Waterloo services per hour, two Woking to Waterloo services per hour and two Shepperton to Waterloo services per hour diverted via East Putney. (Sunday: Woking service starts at Guildford; one Kingston via Shepperton and one Twickenham via Kingston)." info from SWT website: http://www.southwesttrains.co.uk/SWT...Easter2008.htm http://www.tfl.gov.uk/assets/livetra...me/tube/track- closures.pdf has work for that weekend as affecting: "Baker Street to Hammersmith (Hammersmith & City) - No Circle - Earl's Court to Edgware Road (District)" So I'd suggest the Edware Road-Wimbledon service won't run atall which frees up the required paths from East Putney. The above seems to imply that Wimbleware trains will be reversing at Earls/Earl's Court (via Triangle Sidings?).- Or it could just mean that Earls Court to Wimbledon is covered by trains from the Victoria direction. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overrun of engineering work on the Wimbledon Branch | London Transport | |||
National rail south east - any single engineering works source? | London Transport | |||
Validity of +Any Permnitted during engineering works | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |