Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#41
![]() |
|||
|
|||
![]()
On Thu, 17 Jan 2008 15:44:51 -0800 (PST), D7666
wrote: various snipped out I don't know what the current limit relays were set at on 501s but being 4 motors per unit would be likely to draw more than a two motor 2EPB. Published ''spotting book'' values of a 2EPB are 2x250 hp and 501 4x185 hp so that makes a 501 in round figures 50% more powerful than a 2EPB - but I'd caution those numbers with similar comments I have made before about DC EMU in that the current limit relay setting needs to be known to understand peak current draw. As regards another part of the thread, I thought 2x313 operation was killed by platform length limits. 501 units were on 57 foot frames and platforms that could take 6cars laid out for that length - but could not take standard 6car sliding door trains with 20 m bodies. And I can't see why a 6car 313 would draw siginficantly more power than a 6car 501 to trip traction supplies. Again using ''spotting book'' values, without current limit values, a 313 has 8x82 kW motors that in round figures is 880 hp per unit - while a 501 is 740 hp. I would have expected the LNWR DC supply to have been a bit more robust than that as the overall load increase taking all traffic is not 20% from a simple 313 and 501 comparison - but is Bakerloo+501 c.f. Bakerloo+313 with the Bakerloo load unchanged. Must admit never thought about this aspect before, I might be wrong, its not a route thats easy to obtain gen on the traction supplies. Don't the motor control systems of a class 313 present a more "peaky" load than older stock ? This would in some way seem to be comparable behaviour to computer switched-mode power supplies which blow plug fuses if said fuses are rated purely on the current drawn after switch-on. While I heard drivers allege that a 6-coach train tended to trip sub-stations, I never heard any comment about being unable to fit the trains in the stations which ISTR usually had about a carriage-length to spare with c501s; when the 313s were first introduced one difficulty was getting them to stop with any carriages in the station and I don't think the cause was purely "driver technique". |
#42
![]() |
|||
|
|||
![]()
On Jan 18, 4:04 pm, Charles Ellson wrote:
Don't the motor control systems of a class 313 present a more "peaky" load than older stock ? AFAIK 313s (and 507/508) are simple camshaft operated resistance control systems (although there my be some electronic supervision) little different than anything built from 1930s onwards. If 313s have a bigger peak current then that will be down to current limit relay settings. Apat from knowing what that value is, I can't see why they'd be more peaky than a 501. -- Nick |
#43
![]() |
|||
|
|||
![]()
Are the old LNWR sub-stations still used on the DC and NLL Lines?
There is a very typical-looking large brick building between Kenton and South Kenton, another at Willesden Junction, but a similar structure on the NLL near Brondesbury (once visible from the LUL lines) has now gone. |
#44
![]() |
|||
|
|||
![]() |
#45
![]() |
|||
|
|||
![]()
Why are they closing the Vic from 22.00 until 4 November, so that they can
test, tincker with and troubleshoot the 09 series trains? BTW, when and where will it be possible to see one of those trains? |
#46
![]() |
|||
|
|||
![]()
On Jan 19, 4:09 pm, wrote:
Why are they closing the Vic from 22.00 until 4 November, so that they can test, tincker with and troubleshoot the 09 series trains? BTW, when and where will it be possible to see one of those trains? That is difficult - the public parts of the Vic are all underground, and as '9 stock is not in public service, you'll have to either visit the depot or have some gen on test trains in traffic hours (of which there are none - yet; but really the timetable does not allow for traffic hours test trains). -- Nick |
#47
![]() |
|||
|
|||
![]()
On Sun, 20 Jan 2008 00:09:28 GMT, wrote:
Why are they closing the Vic from 22.00 until 4 November, so that they can test, tincker with and troubleshoot the 09 series trains? BTW, when and where will it be possible to see one of those trains? I have seen train one parked in the depot. It was sheer luck but I went past on a 192 bus (starts from Tottenham Hale). It goes up Watermead Way which rises above the Cambridge line and gives a good view of Northumberland Park depot. If you opt to try this sit at the back of the bus as you're higher up (it's only a little single deck). IIRC there is also a footbridge from Watermead Way across the LU / NR tracks but I think it is all caged so any view would be very restricted or maybe even non existent. I've not used it myself. I doubt very much, at this stage, that the public will be able to see the V stock in test mode as it's all done under possession with no public access. The latest LU intranet news about the Vic line early closing said train 2 was due March / April time and it would enter passenger service alongside 67 stock late 2008. -- Paul C |
#48
![]() |
|||
|
|||
![]()
On 20 Jan, 09:09, Paul Corfield wrote:
On Sun, 20 Jan 2008 00:09:28 GMT, wrote: Why are they closing the Vic from 22.00 until 4 November, so that they can test, tincker with and troubleshoot the 09 series trains? BTW, when and where will it be possible to see one of those trains? I have seen train one parked in the depot. It was sheer luck but I went past on a 192 bus (starts from Tottenham Hale). It goes up Watermead Way which rises above the Cambridge line and gives a good view of Northumberland Park depot. If you opt to try this sit at the back of the bus as you're higher up (it's only a little single deck). IIRC there is also a footbridge from Watermead Way across the LU / NR tracks but I think it is all caged so any view would be very restricted or maybe even non existent. I've not used it myself. I doubt very much, at this stage, that the public will be able to see the V stock in test mode as it's all done under possession with no public access. The latest LU intranet news about the Vic line early closing said train 2 was due March / April time and it would enter passenger service alongside 67 stock late 2008. How will they integrate the 2 different ATO systems for when both train types are running in service? Do the new trains have the old system on board as well? B2003 |
#49
![]() |
|||
|
|||
![]()
On Sun, 20 Jan 2008 01:33:07 -0800 (PST), Boltar
wrote: On 20 Jan, 09:09, Paul Corfield wrote: On Sun, 20 Jan 2008 00:09:28 GMT, wrote: Why are they closing the Vic from 22.00 until 4 November, so that they can test, tincker with and troubleshoot the 09 series trains? BTW, when and where will it be possible to see one of those trains? I have seen train one parked in the depot. It was sheer luck but I went past on a 192 bus (starts from Tottenham Hale). It goes up Watermead Way which rises above the Cambridge line and gives a good view of Northumberland Park depot. If you opt to try this sit at the back of the bus as you're higher up (it's only a little single deck). IIRC there is also a footbridge from Watermead Way across the LU / NR tracks but I think it is all caged so any view would be very restricted or maybe even non existent. I've not used it myself. I doubt very much, at this stage, that the public will be able to see the V stock in test mode as it's all done under possession with no public access. The latest LU intranet news about the Vic line early closing said train 2 was due March / April time and it would enter passenger service alongside 67 stock late 2008. How will they integrate the 2 different ATO systems for when both train types are running in service? Do the new trains have the old system on board as well? New trains are fitted with current system to allow migration of stock. When all the 67 stock is gone then you have all V stock on the current ATO and then migration to full "distance to go" signalling follows. I have no idea if that will be done section by section or in a "big bang" switch over. My guess would be section by section as the alternative is possibly too risky. Central Line was done section by section IIRC. -- Paul C |
#50
![]() |
|||
|
|||
![]()
Two questions:
-- Are the closures indeed to test the new rolling stock or their prototypes? -- Why is it called V stock? I thought it was 09 stock. "Paul Corfield" wrote in message ... On Sun, 20 Jan 2008 00:09:28 GMT, wrote: Why are they closing the Vic from 22.00 until 4 November, so that they can test, tincker with and troubleshoot the 09 series trains? BTW, when and where will it be possible to see one of those trains? I have seen train one parked in the depot. It was sheer luck but I went past on a 192 bus (starts from Tottenham Hale). It goes up Watermead Way which rises above the Cambridge line and gives a good view of Northumberland Park depot. If you opt to try this sit at the back of the bus as you're higher up (it's only a little single deck). IIRC there is also a footbridge from Watermead Way across the LU / NR tracks but I think it is all caged so any view would be very restricted or maybe even non existent. I've not used it myself. I doubt very much, at this stage, that the public will be able to see the V stock in test mode as it's all done under possession with no public access. The latest LU intranet news about the Vic line early closing said train 2 was due March / April time and it would enter passenger service alongside 67 stock late 2008. -- Paul C |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
North London Line update | London Transport | |||
North London Line update | London Transport | |||
North Greenwich car park question | London Transport | |||
Improvements to the North London Line | London Transport | |||
North London Lines question | London Transport |