![]() |
Blackfriars - SET services after December 2008
On Jun 6, 3:07*pm, Sky Rider wrote:
MIG wrote: Will we get 12-car trains on Thameslink before we get them on "Kent Link"? Network Rail are planning to introduce 12-car services on all Southeastern suburban routes via London Bridge around 2011/2012 - check out Chapter 7 of the South London Route Utilisation Strategy. BR planned them for 1993/4. The work included closing Charing Cross for three weeks and diversion of trains to Cannon Street, Blackfriars and Victoria. The special timetable during that period was more interesting than most of the grinding disruption and closure over a couple of years, but it resulted in peak-hour trains shortening from 10 coaches of slam- door stuff to 8 or 6-coach "Networkers" (and it took years for average peak lengths to get near to what they were in 1992). So, with another dowturn on the way, my response to any such plan is "I'll believe it when I see it". On past evidence, trains are due to get shorter again, not longer, but they may have yet more long platforms for punters to have to chase them to the wrong end of. http://tinyurl.com/2k29zc But the Moorgate branch will sure as hell close, and there will be huge disruption for the pointless work. It will be pointless (well sort-of), but not in the way I think you meant. ;) |
Blackfriars - SET services after December 2008
On Jun 6, 8:33*pm, Sky Rider wrote:
Rupert Candy wrote: I presume we (for I am one) are to get the entirely unrefurbished 319/0s, rather than the pink and purple reasonably-well-refurbished examples. Knowing how often 319/(0,3)s do Bedford-Brighton and 319/4s Luton/St Albans-Wimbledon Loop (because of diagramming constraints), you'll probably ride a non-319/0 every now and again. Or perhaps even semi-regularly if FCC *plan* to share the 319/(0,3)s between Wimbledon Loop and 7oaks services, which I don't think is unlikely - but I expect thy'll try to restrict the former Brighton Express trains (319/2s) to...er...Brighton services. FCC will refresh all the 319s but as the C6 exams are carried out at the same time it will be a few more years before they are all refreshed - to date well over 20 319/4s have been worked on since September 2006, which leaves about another 60-odd 319s to do. Unless I'm mistaken the 319/(0,2)s underwent their C6 exams back in 2006/2007 so they will be refreshed last (possibly alongside the 319/4s that were merely repainted). Though the Notworkers are still in 'as built' condition internally (albeit 'refreshed'), and look pretty dingy and tired compared to other older (but modernised) stock like 455s. Some of the 465/2s were [refreshed/refurbished]* and renumbered as 465/9s weren't they? I don't know if any of the other Networkers have been altered though. *Delete as appropriate Most of the 465/2s in fact (30-odd out of 50), but as 465/9s they still haven't been given working PIS, which one would normally expect in the circumstances. The rest of the 465/466s are pretty much untouched apart from some internal anti-graffiti spraying and the removal of the Eddie Ponds. |
Blackfriars - SET services after December 2008
"eNautilus" wrote in message ... What will happen to SouthEastern train services into Blackfriars after December 2008 - diverted to Victoria, cancelled, or will there be a limited service continuing through to City Thameslink and terminating at Smithfield sidings? So, in summary, the current very reliable and punctual Sevenoaks-Blackfriars service, as operated by SET, will be replaced by a much less reliable, frequently cancelled and generally useless 'service' as provided by Thameslink/Worst Capital Connect/Whatever It's Called This Week. |
Blackfriars - SET services after December 2008
eNautilus wrote:
So, in summary, the current very reliable and punctual Sevenoaks-Blackfriars service, as operated by SET, will be replaced by a much less reliable, frequently cancelled and generally useless 'service' as provided by Thameslink/Worst Capital Connect/Whatever It's Called This Week. Not quite. The service you describe will actually be jointly operated by FCC and SER (with TOC changeovers at Blackfriars). |
All times are GMT. The time now is 12:51 PM. |
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk