NLL Camden Road work package reduced
Don't think anyone has mentioned the reduced scope of the NLL improvements,
basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S |
NLL Camden Road work package reduced
On 15 Sep, 16:34, "Paul Scott" wrote:
Don't think anyone has mentioned the reduced scope of the NLL improvements, basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S On a related issue, I noticed on Sunday that trains were running from Euston to Queens Park. Is this normal, during the blockade, or was it because of the rest of the LO not running at all that day? |
NLL Camden Road work package reduced
"MIG" wrote in message ... On 15 Sep, 16:34, "Paul Scott" wrote: Don't think anyone has mentioned the reduced scope of the NLL improvements, basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S On a related issue, I noticed on Sunday that trains were running from Euston to Queens Park. Is this normal, during the blockade, or was it because of the rest of the LO not running at all that day? Certainly seems 'normal' as far as the TfL info goes. Why Sunday is different isn't clear though, there may just be more paths available? Paul |
NLL Camden Road work package reduced
On Sep 15, 4:52*pm, MIG wrote:
On 15 Sep, 16:34, "Paul Scott" wrote: Don't think anyone has mentioned the reduced scope of the NLL improvements, basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S On a related issue, I noticed on Sunday that trains were running from Euston to Queens Park. Is this normal, during the blockade, or was it because of the rest of the LO not running at all that day? The sunday service is normal, except that the additional engineering work meant that the Euston-Watford Service was cut short to Queens Park. |
NLL Camden Road work package reduced
On 15 Sep, 17:13, Andy wrote:
On Sep 15, 4:52*pm, MIG wrote: On 15 Sep, 16:34, "Paul Scott" wrote: Don't think anyone has mentioned the reduced scope of the NLL improvements, basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S On a related issue, I noticed on Sunday that trains were running from Euston to Queens Park. Is this normal, during the blockade, or was it because of the rest of the LO not running at all that day? The sunday service is normal, except that the additional engineering work meant that the Euston-Watford Service was cut short to Queens Park. Ah yes, I hadn't spotted that they were running to Euston on Sundays. I can see how stoppng LM services at Queens Park would be affected by paths, but I wonder how Sundays are so different for LO/Bakerloo. |
NLL Camden Road work package reduced
On Mon, 15 Sep 2008 09:30:28 -0700 (PDT), MIG
wrote: Ah yes, I hadn't spotted that they were running to Euston on Sundays. I can see how stoppng LM services at Queens Park would be affected by paths, but I wonder how Sundays are so different for LO/Bakerloo. Why are they running to EUS on Sunday? Neil -- Neil Williams Put my first name before the at to reply. |
NLL Camden Road work package reduced
On Sep 15, 8:34*am, "Paul Scott"
wrote: Don't think anyone has mentioned the reduced scope of the NLL improvements, basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Pitiful. |
NLL Camden Road work package reduced
"Neil Williams" wrote in message ... On Mon, 15 Sep 2008 09:30:28 -0700 (PDT), MIG wrote: Ah yes, I hadn't spotted that they were running to Euston on Sundays. I can see how stoppng LM services at Queens Park would be affected by paths, but I wonder how Sundays are so different for LO/Bakerloo. Why are they running to EUS on Sunday? That's exactly what 'MIG' originally asked a few posts ago. It's timetabled, but no one has said for sure why it can be on Sundays, but not on weekdays. It must be that there are only so many paths from Camden Junction to Queens Park, and the Stratford services use them all. As there are less Stratfords on Sun, and possibly less freight?, presumably they can add back a Euston or two... Paul |
NLL Camden Road work package reduced
As an aside, does anyone know why they seem to be keeping a unit in
the platforms at Euston during the week? It seems such a waste of a platform and the only possible justification #I can think of is keeping it there in case things go tits up and they need to be able to run a service from Euston to Watford... |
NLL Camden Road work package reduced
On Sep 15, 4:34*pm, "Paul Scott"
wrote: Don't think anyone has mentioned the reduced scope of the NLL improvements, basically the 4 tracking will not go as far as Camden Rd due to the state of the out of use bridges. This reduces the Stratford - Camden Rd service frequency in the off peak, as there is no longer a centre turnback. Details on the ORR site here, including track diagrams: http://www.rail-reg.gov.uk/upload/pd...808-annexa.pdf Paul S Just a thought, couldn't someone repair the bridges, or failing that, replace them? I don't suppose that motorway bridges would be left unused if they needed some work, witness the billions being squandered on the M1 widening in Beds/Herts, and the consequent bridge work there. Rich |
All times are GMT. The time now is 04:20 PM. |