#1
![]() |
|||
|
|||
![]()
http://www.dft.gov.uk/pgr/rail/pi/th.../trainspec.pdf
Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... Paul S |
#2
![]() |
|||
|
|||
![]()
On Feb 24, 5:35*am, "Paul Scott"
wrote: http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Dealing with failsafe and reliability is surely a challenge. |
#3
![]() |
|||
|
|||
![]()
On 24 Feb, 16:50, wrote:
On Feb 24, 5:35*am, "Paul Scott" wrote:http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... This is incredible stuff. *Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Dealing with failsafe and reliability is surely a challenge. Not to mention the use of ETCS SRS 2.3.0d which has a number of outstanding open points. And I don't think anyone has tried overlaying ATO on ETCS. I suspect that 24 trains/h will become a new Key Output 3. A further point is that, unless ETCS was operational over the whole Thameslink Network, drivers would have to switch between two operating philosophies. |
#4
![]() |
|||
|
|||
![]()
On Feb 24, 5:31 pm, "Capt. Deltic" wrote:
This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Not to mention the use of ETCS SRS 2.3.0d which has a number of outstanding open points. And I don't think anyone has tried overlaying ATO on ETCS. I suspect that 24 trains/h will become a new Key Output 3. A further point is that, unless ETCS was operational over the whole Thameslink Network, drivers would have to switch between two operating philosophies. But not a lot different to an inbound Eurostar arriving at Dollands Moor out of the tunnel under TVM430 and suddenly adopting AWS and 4- aspects. And vice versa outbound. I shall await further questions from your good self at certain technical meetings in the near future ;o) BTW, when I quickly scanned the posts first time through I read SRS 2.3.0d as ETCS SR £2.0.3d ... now I know SR could be parsimonious at times ... -- Nick |
#5
![]() |
|||
|
|||
![]()
On Feb 24, 5:35*am, "Paul Scott"
wrote: http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... Paul S This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto routes with other safety systems (AWS), and none. Dealing with failsafe and reliability will surely be a challenge. |
#6
![]() |
|||
|
|||
![]()
On Feb 24, 5:49*pm, wrote:
On Feb 24, 5:31 pm, "Capt. Deltic" wrote: This is incredible stuff. *Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Not to mention the use of ETCS SRS 2.3.0d which has a number of outstanding open points. *And I don't think anyone has tried overlaying ATO on ETCS. *I suspect that 24 trains/h will become a new Key Output 3. A further point is that, unless ETCS was operational over the whole Thameslink Network, drivers would have to switch between two operating philosophies. But not a lot different to an inbound Eurostar arriving at Dollands Moor out of the tunnel under TVM430 and suddenly adopting AWS and 4- aspects. And vice versa outbound. I shall await further questions from your good self at certain technical meetings in the near future ;o) BTW, when I quickly scanned the posts first time through I read SRS 2.3.0d as ETCS SR £2.0.3d ... now I know SR could be parsimonious at times ... Was that the development budget for the Class 319? :-P |
#7
![]() |
|||
|
|||
![]() |
#8
![]() |
|||
|
|||
![]()
On Feb 24, 10:15 pm, Andrew Price wrote:
technical meetings IRSE? (If yes, I suppose you know that Alan Fisher died suddenly yesterday) Ohhhh ... yes ... and no I had not heard ... I see that news is on the official home page, my condolences to all. -- Nick |
#9
![]() |
|||
|
|||
![]()
Does this mean the end of the driver.
GOO here we come revenge of the Guard ![]() |
#10
![]() |
|||
|
|||
![]() wrote in message ... Does this mean the end of the driver. GOO here we come revenge of the Guard ![]() 1 Get the guard to do conductor duties. 2 Introduce automation and get rid of the driver. That's the DLR for you. Peter |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
NLL Infrastructure specification agreed | London Transport | |||
How can you have a signal failure on an ATO system? | London Transport |