![]() |
|
Thameslink ATO Specification published
http://www.dft.gov.uk/pgr/rail/pi/th.../trainspec.pdf
Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... Paul S |
Thameslink ATO Specification published
On Feb 24, 5:35*am, "Paul Scott"
wrote: http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Dealing with failsafe and reliability is surely a challenge. |
Thameslink ATO Specification published
On 24 Feb, 16:50, wrote:
On Feb 24, 5:35*am, "Paul Scott" wrote:http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... This is incredible stuff. *Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Dealing with failsafe and reliability is surely a challenge. Not to mention the use of ETCS SRS 2.3.0d which has a number of outstanding open points. And I don't think anyone has tried overlaying ATO on ETCS. I suspect that 24 trains/h will become a new Key Output 3. A further point is that, unless ETCS was operational over the whole Thameslink Network, drivers would have to switch between two operating philosophies. |
Thameslink ATO Specification published
On Feb 24, 5:31 pm, "Capt. Deltic" wrote:
This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Not to mention the use of ETCS SRS 2.3.0d which has a number of outstanding open points. And I don't think anyone has tried overlaying ATO on ETCS. I suspect that 24 trains/h will become a new Key Output 3. A further point is that, unless ETCS was operational over the whole Thameslink Network, drivers would have to switch between two operating philosophies. But not a lot different to an inbound Eurostar arriving at Dollands Moor out of the tunnel under TVM430 and suddenly adopting AWS and 4- aspects. And vice versa outbound. I shall await further questions from your good self at certain technical meetings in the near future ;o) BTW, when I quickly scanned the posts first time through I read SRS 2.3.0d as ETCS SR £2.0.3d ... now I know SR could be parsimonious at times ... -- Nick |
Thameslink ATO Specification published
On Feb 24, 5:35*am, "Paul Scott"
wrote: http://www.dft.gov.uk/pgr/rail/pi/th...k/itt/trainspe... Will also be applicable to Crossrail, and will form a National Network Rail ATO specification, overlaid on ETCS. Stacks of techno stuff... Paul S This is incredible stuff. Especially so when you consider that Thameslink, and Crossrail, trains will run onto routes with other safety systems (AWS), and none. Dealing with failsafe and reliability will surely be a challenge. |
Thameslink ATO Specification published
On Feb 24, 5:49*pm, wrote:
On Feb 24, 5:31 pm, "Capt. Deltic" wrote: This is incredible stuff. *Especially so when you consider that Thameslink, and Crossrail, trains will run onto systems with systems (AWS), and none. Not to mention the use of ETCS SRS 2.3.0d which has a number of outstanding open points. *And I don't think anyone has tried overlaying ATO on ETCS. *I suspect that 24 trains/h will become a new Key Output 3. A further point is that, unless ETCS was operational over the whole Thameslink Network, drivers would have to switch between two operating philosophies. But not a lot different to an inbound Eurostar arriving at Dollands Moor out of the tunnel under TVM430 and suddenly adopting AWS and 4- aspects. And vice versa outbound. I shall await further questions from your good self at certain technical meetings in the near future ;o) BTW, when I quickly scanned the posts first time through I read SRS 2.3.0d as ETCS SR £2.0.3d ... now I know SR could be parsimonious at times ... Was that the development budget for the Class 319? :-P |
Thameslink ATO Specification published
|
Thameslink ATO Specification published
On Feb 24, 10:15 pm, Andrew Price wrote:
technical meetings IRSE? (If yes, I suppose you know that Alan Fisher died suddenly yesterday) Ohhhh ... yes ... and no I had not heard ... I see that news is on the official home page, my condolences to all. -- Nick |
Thameslink ATO Specification published
Does this mean the end of the driver.
GOO here we come revenge of the Guard :) |
Thameslink ATO Specification published
wrote in message ... Does this mean the end of the driver. GOO here we come revenge of the Guard :) 1 Get the guard to do conductor duties. 2 Introduce automation and get rid of the driver. That's the DLR for you. Peter |
All times are GMT. The time now is 05:26 AM. |
|
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk