Tom Sacold wrote:
The costs of running the permanent way were substantially lower (ie 50%) under Railtrack than under either Administration or Network Rail. Looking at the figures a little more closely, a large part of that increase seems to have taken place under Network Rail. There appears to have been a surprising lack of cost management within Network Rail. Surely the whole point is that Railtrack were mainly cutting maintenance costs by having less maintenance done. Now more maintenance is being done at a similar cost per unit work done, but there's a big backlog to work through. [Several groups snipped] Colin McKenzie |