Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#21
![]() |
|||
|
|||
![]()
On Nov 4, 1:31*am, D7666 wrote:
On Nov 4, 9:15*am, Matthew Geier wrote: On Tue, 03 Nov 2009 14:29:49 -0800, E27002 wrote: Where will this tram be maintained? *How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. My best guess is that these issues have been considered. *Siemens has already built a batch of 'Avanto' 'tram-trains' that are equipped for 25kAC/750vDC operation and are even fitted with appropriate train protection equipment for the area they operate in. *All you need to do is borrow one Avanto from RAPT (Paris T4) for a while to try out. Perhaps they could re-import ex-DLR cars that were exported 2nd hand to Essen (but were imported new anyway. The 11 P86 sets would be about the right fleet size x5 2-set trains and one spare unit ![]() Even have grandfather rights ? Not that I am aware Essen are selling them . Correct me if I am wrong: The DLR cars are DC only. The issue here is the need to function under the 25 kV AC wire. Also, are they still third rail only? Or, did Essen add a DC pantograph? |
#22
![]() |
|||
|
|||
![]() |
#23
![]() |
|||
|
|||
![]()
On Nov 6, 10:02*am, David Jackman pleasereplytogroup wrote:
E27002 wrote in news:5a91ccd3-e16a-4f8e-b721- : On Nov 3, 1:07*pm, (Neil Williams) wrote: On Tue, 3 Nov 2009 05:01:01 -0800 (PST), Rob wrote: There has been a campaign to run the Abbey Flyer into Euston in the past, but it always ran into the problem that Virgin needed the train paths, whereas St Albans already has a direct route into London (albeit very overloaded) There has to be room on the slow lines, as LM are increasing the service in December with some Watford shuttles that could easily run through from St Albans if the infrastructure was sorted. Where will this tram be maintained? *How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. My best guess is that these issues have been considered. Why on earth would you want to get Network Rail involved? Isn't one of the attractions of this that you are isolated from the "big railway" and won't need to comply with (or have rolling stock that complies with) Group Statdards? Indeed. However, when I posted the foregoing, I was not aware that the route was to have its own tram depot. |
#24
![]() |
|||
|
|||
![]()
On Nov 4, 4:04*pm, E27002 wrote:
On Nov 4, 1:31*am, D7666 wrote: Perhaps they could re-import ex-DLR cars that were exported 2nd hand to Essen (but were imported new anyway. The 11 P86 sets would be about the right fleet size x5 2-set trains and one spare unit ![]() Correct me if I am wrong: The DLR cars are DC only. *The issue here is the need to function under the 25 kV AC wire. *Also, are they still third rail only? *Or, did Essen add a DC pantograph?- Hide quoted text - - Show quoted text - Did the ![]() -- Nick |
#25
![]() |
|||
|
|||
![]()
On Nov 6, 11:22*am, D7666 wrote:
On Nov 4, 4:04*pm, E27002 wrote: On Nov 4, 1:31*am, D7666 wrote: Perhaps they could re-import ex-DLR cars that were exported 2nd hand to Essen (but were imported new anyway. The 11 P86 sets would be about the right fleet size x5 2-set trains and one spare unit ![]() Correct me if I am wrong: The DLR cars are DC only. *The issue here is the need to function under the 25 kV AC wire. *Also, are they still third rail only? *Or, did Essen add a DC pantograph?- Hide quoted text - - Show quoted text - Did the ![]() Duh! |
#26
![]() |
|||
|
|||
![]()
On Nov 3, 11:29*pm, E27002 wrote:
On Nov 3, 1:07*pm, (Neil Williams) wrote: On Tue, 3 Nov 2009 05:01:01 -0800 (PST), Rob wrote: There has been a campaign to run the Abbey Flyer into Euston in the past, but it always ran into the problem that Virgin needed the train paths, whereas St Albans already has a direct route into London (albeit very overloaded) There has to be room on the slow lines, as LM are increasing the service in December with some Watford shuttles that could easily run through from St Albans if the infrastructure was sorted. Where will this tram be maintained? *How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. My best guess is that these issues have been considered. Where will this tram be maintained? How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. Are you mad? No they'd load it on to an Alley's low loader every night for the move to Bletchley depot. Come one now man, get a grip of yourself. We can't have rolling stock being moved from location to another by rail!! Its just not British! |
#27
![]() |
|||
|
|||
![]()
On Nov 4, 5:04*pm, E27002 wrote:
On Nov 4, 1:31*am, D7666 wrote: On Nov 4, 9:15*am, Matthew Geier wrote: On Tue, 03 Nov 2009 14:29:49 -0800, E27002 wrote: Where will this tram be maintained? *How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. My best guess is that these issues have been considered. *Siemens has already built a batch of 'Avanto' 'tram-trains' that are equipped for 25kAC/750vDC operation and are even fitted with appropriate train protection equipment for the area they operate in. *All you need to do is borrow one Avanto from RAPT (Paris T4) for a while to try out. Perhaps they could re-import ex-DLR cars that were exported 2nd hand to Essen (but were imported new anyway. The 11 P86 sets would be about the right fleet size x5 2-set trains and one spare unit ![]() Even have grandfather rights ? Not that I am aware Essen are selling them . Correct me if I am wrong: The DLR cars are DC only. *The issue here is the need to function under the 25 kV AC wire. *Also, are they still third rail only? *Or, did Essen add a DC pantograph?- Hide quoted text - - Show quoted text - As they did for the DLR Metrolink demonstator in Gorton some years ago. Unit 11 if my memory serves me right. That was exciting. i wonder, did they stable or load/unload the unir at Reddish depot that time? |
#28
![]() |
|||
|
|||
![]() "D7666" wrote in message ... On Nov 4, 9:15 am, Matthew Geier wrote: Siemens has already built a batch of 'Avanto' 'tram-trains' that are equipped for 25kAC/750vDC operation and are even fitted with appropriate train protection equipment for the area they operate in. I've already posted Avantos exist way back upthread. It is about the 42nd time I've mentioned Avanto in various thread in this forum over recent years, yet every new thread about tram/trains trots out the same uninformed drivel about perceived 25 kV / 750 V trams not exisitng, need to re-wire 25 kV to 750 V etc, when they do exist and are well proven. There are even electro-diesel options although not sure if any of those have actually been built yet. -- Nick And for that matter, battery equipped units to get past environmentally sensitive areas - even trolley buses doing that with batteries (see Peking, Wellington for examples). DW down under |
#29
![]() |
|||
|
|||
![]()
On Fri, 6 Nov 2009 21:50:23 -0800 (PST), Paul
wrote: On Nov 3, 11:29=A0pm, E27002 wrote: On Nov 3, 1:07=A0pm, (Neil Williams) wrote: On Tue, 3 Nov 2009 05:01:01 -0800 (PST), Rob rob_s_sm...@hotmail= .com wrote: There has been a campaign to run the Abbey Flyer into Euston in the past, but it always ran into the problem that Virgin needed the train paths, whereas St Albans already has a direct route into London (albeit very overloaded) There has to be room on the slow lines, as LM are increasing the service in December with some Watford shuttles that could easily run through from St Albans if the infrastructure was sorted. Where will this tram be maintained? =A0How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. My best guess is that these issues have been considered. Where will this tram be maintained? How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. Are you mad? No they'd load it on to an Alley's low loader every night for the move to Bletchley depot. Come one now man, get a grip of yourself. We can't have rolling stock being moved from location to another by rail!! Its just not British! You missed an earler post which said that room for a depot had been identified at st Albans. However the official answer now is that this is up to the contractor to sort out. I would have throught that Watford or the former North Watford sidings, had beter potential depot space. -- Peter Lawrence |
#30
![]() |
|||
|
|||
![]()
On Sat, 7 Nov 2009, Peter Lawrence wrote:
On Fri, 6 Nov 2009 21:50:23 -0800 (PST), Paul wrote: On Nov 3, 11:29=A0pm, E27002 wrote: On Nov 3, 1:07=A0pm, (Neil Williams) wrote: On Tue, 3 Nov 2009 05:01:01 -0800 (PST), Rob rob_s_sm...@hotmail= .com wrote: There has been a campaign to run the Abbey Flyer into Euston in the past, but it always ran into the problem that Virgin needed the train paths, whereas St Albans already has a direct route into London (albeit very overloaded) There has to be room on the slow lines, as LM are increasing the service in December with some Watford shuttles that could easily run through from St Albans if the infrastructure was sorted. Where will this tram be maintained? =A0How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. My best guess is that these issues have been considered. Where will this tram be maintained? How will it reach that location? If it is to reach Bletchley, it will have to be 25 kV Ac, or pulled by another motive power unit. Are you mad? No they'd load it on to an Alley's low loader every night for the move to Bletchley depot. Come one now man, get a grip of yourself. We can't have rolling stock being moved from location to another by rail!! Its just not British! You missed an earler post which said that room for a depot had been identified at st Albans. However the official answer now is that this is up to the contractor to sort out. I would have throught that Watford or the former North Watford sidings, had beter potential depot space. Does it really make sense to have a dedicated maintenance facility just for this one tram? Or when we say 'depot', do we mean 'somewhere to sleep at night plus somewhere for light maintenance eg changing the light bulbs', with heavy work being done at an existing major depot reached by rail or low-loader? tom -- Kevin was inspired as an actor by Super Engineer A.K.A Wondergirl T-rav Camelang -- Wikipedia, on Kevin Bacon |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
PPP Arbiter announces draft decision | London Transport | |||
Abbey Road's changed a lot | London Transport | |||
Carnet Tickets for the Abbey line | London Transport | |||
Crossrail will terminate at Abbey Wood | London Transport |