![]() |
|
First Capital Connect strike ...
On Nov 17, 9:49*pm, John B wrote:
*Are* they actually running 4-cars? I've been rush-hour commuting mostly on FCC-TL throughout the dispute, and haven't encountered any. Yes. My commute must be different to yours then cos I seen single 319s out every day in both peaks. And FCC words are ''all trains'' not just peak trains. It is ******** as they still have attach and detach 4+4 - 8 and 8 - 4+4 diagrams at Luton, this week. In fact one of them to the best of my knowledge puts a 4car on what was previously a permanennt 8car turn. FCC are not telling the whole truth in any of this. (if they're still running the one evening 317 out of Moorgate[*], then I can pretty much see why that one might run as 4-car...) [*] obviously ECS til Farringdon No. The 317 diagram left BedPan lines several weeks ago. The train is now booked and permanent altered [in the full timetable] as 17:blurr Elephant & Castle start 2x319 *however* as an additonal to the emergency timetable the 18:19 exFarringdon has been used by 2x377 after reversing ECS Moorgate. -- Nick |
First Capital Connect strike ...
On 20 Nov, 19:55, D7666 wrote:
On Nov 17, 9:49*pm, John B wrote: *Are* they actually running 4-cars? I've been rush-hour commuting mostly on FCC-TL throughout the dispute, and haven't encountered any. Yes. My commute must be different to yours then cos I seen single 319s out every day in both peaks. And FCC words are ''all trains'' not just peak trains. It is ******** as they still have attach and detach 4+4 - 8 and 8 - 4+4 diagrams at Luton, this week. In fact one of them *to the best of my knowledge puts a 4car on what was previously *a permanennt 8car turn. FCC are not telling the whole truth in any of this. (if they're still running the one evening 317 out of Moorgate[*], then I can pretty much see why that one might run as 4-car...) [*] obviously ECS til Farringdon No. The 317 diagram left BedPan lines several weeks ago. The train is now booked and permanent altered [in the full timetable] as 17:blurr Elephant & Castle start 2x319 *however* *as an additonal to the emergency timetable the 18:19 exFarringdon has been used by 2x377 after reversing ECS Moorgate. -- Nick I had to use FCC today (from St Pancreas to Crofton Park) and found it strangely lacking in cancellations, unlike all the announcements I've been hearing every time I pass London Bridge. Has something been fixed? |
First Capital Connect strike ...
On Fri, 20 Nov 2009 15:41:39 -0800 (PST), MIG
wrote: I had to use FCC today (from St Pancreas to Crofton Park) and found it strangely lacking in cancellations, unlike all the announcements I've been hearing every time I pass London Bridge. Has something been fixed? If anything has been fixed, it certainly wasn't your "ability" to draw all-encompassing conclusions from a single piece of data. |
First Capital Connect strike ...
MIG wrote:
On 20 Nov, 19:55, D7666 wrote: On Nov 17, 9:49 pm, John B wrote: *Are* they actually running 4-cars? I've been rush-hour commuting mostly on FCC-TL throughout the dispute, and haven't encountered any. Yes. My commute must be different to yours then cos I seen single 319s out every day in both peaks. And FCC words are ''all trains'' not just peak trains. It is ******** as they still have attach and detach 4+4 - 8 and 8 - 4+4 diagrams at Luton, this week. In fact one of them to the best of my knowledge puts a 4car on what was previously a permanennt 8car turn. FCC are not telling the whole truth in any of this. (if they're still running the one evening 317 out of Moorgate[*], then I can pretty much see why that one might run as 4-car...) [*] obviously ECS til Farringdon No. The 317 diagram left BedPan lines several weeks ago. The train is now booked and permanent altered [in the full timetable] as 17:blurr Elephant & Castle start 2x319 *however* as an additonal to the emergency timetable the 18:19 exFarringdon has been used by 2x377 after reversing ECS Moorgate. -- Nick I had to use FCC today (from St Pancreas to Crofton Park) and found it strangely lacking in cancellations, unlike all the announcements I've been hearing every time I pass London Bridge. Has something been fixed? Once they have published a temporary timetable, ie handed out a few leaflets, put up posters, and altered the website, but more importantly changed the train service database, the announcement system automatically stops mentioning the 50% cancellations? IIRC when they halved the Portsmouth timetable when the resignalling overran, all the National Rail info immediately stopped referring to the problems, as they were running the (temporary) published timetable correctly... Paul S |
First Capital Connect strike ...
On Nov 20, 11:41*pm, MIG wrote:
Has something been fixed?- Hide quoted text - No, the emergency timetable is ''in the system'' so visual and audio information systems no longer report cancelations from the permanent TT, only from the emergency. From the point of view of a passenger actually waiting a train that is better. But don;t forget FCC don't administer those systems, NR do, at all stations, not just NR ones (like SPILL, LB, LGW on the TL route). -- Nick |
All times are GMT. The time now is 05:41 AM. |
|
Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk