Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
On Dec 18, 10:17*am, wrote:
On Thu, 17 Dec 2009 23:31:58 -0000 "Jack Taylor" wrote: Following the timetable change, FCC have ceased running empties from Farringdon into Moorgate and the branch has been fully decommissioned. As at today, Thursday, the branch has been completely dewired, final removals occurring adjacent to the LUL sidings at Farringdon today. The signalling has also been switched out. Given the speed at which this work is taking place, I guess that track recovery will not be long commencing. What a ****ing idiotic decision this is. That branch was used by a LOT of people who are now going to have to crowd onto a packed tube train to do the last mile of their journey. All so they can lengthen Farringdons platform. What the hell for? Why couldn't they just do the same as the do in dozens of other places around the country and just say that to get out at farringdon you have to be in the first 8 cars of the new 12 car trains? This is nothing but cost cutting dressed up as some fatuous service improvement. B2003 Nonsense, you can't build what's meant to be a shiney new system with very tight dwell times and then announce 'sorry, the doors won't open on these four carriages'. If it's being touted as a twelve-car system that's what it has to be. Tim |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Decommissioned Carriages Acquisition | London Transport | |||
02-28-2005 at Moorgate | London Transport | |||
A Moorgate to London Bridge Tunnel (Old chestnut) | London Transport | |||
Moorgate - Closed to WAGN for 1 year | London Transport | |||
Trains to Moorgate now go via Liverpool Street | London Transport |