Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#27
![]() |
|||
|
|||
![]()
D7666 wrote:
I wonder whether there was any 'consultation' with passengers using the branch. They said there was. They could still have kept the new frequency even with moorgate. Indeed. While myself and boltar have dis-agreed on several points in the past, I agree 100% on this one. In view of what they are *now* doing with TL , I'd have argued to have kept Holborn Viaduct as well as Moorgate. For every peak train that departs Moorgate northbound, one departs HV southbound and timed to take up the path through Blackfriars that would have conflicted (*) with the Moorgate departure had it not been there ... if you see what I mean ... and vice versa. The office rebuilding on site of HV could simply have been City TLHL , maybe even a single platform. At least City would then have got 3 platforms, in turn dwell time ''downstairs'' might be less of a problem. You lose no paths, but you provide two city terminii departures at the same time, one north and one south. I shall provde another rant about how I think the Farringdon Junction argument is a cop out in due course .... I need to check on one item first before I do. It won't alter what I will suggest, just the way in which it could be carried out. (*) i.e. northbound Moorgate departures cross southbound Farringdon departures at Farringdon Junction. What would be the possibilities of TPTB deciding to give up on the very concept of Thameslink sooner or later? It still seems a bit vague as to what the future services will be, no-one seems to know what to do with the Sutton/Wimbledon loop, there are/were the technical doubts about the rolling stock and automation needed to get a zillion trains an hour through Farringdon, there seems to be a possibility for something breaking at King's Lynn and wrecking all the services at Eastbourne, and a while ago there was even speculation that TfL or someone really wanted to have a North London Line-esque Croydon to Somewhere in North London inner-suburban service, with everyone who wants to pass through London having to change onto then off it (at bit like on if a future High Speed N turfs everyone onto Crossrail at some kind of West London Parkway to avoid needing to rebuild Euston). Maybe they could try a period of having the Thameslink service being really broken, just to see what happens and if people can change their travel to cope... ![]() -- Arthur Figgis Surrey, UK |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Decommissioned Carriages Acquisition | London Transport | |||
02-28-2005 at Moorgate | London Transport | |||
A Moorgate to London Bridge Tunnel (Old chestnut) | London Transport | |||
Moorgate - Closed to WAGN for 1 year | London Transport | |||
Trains to Moorgate now go via Liverpool Street | London Transport |