Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
"Tom Barry" wrote in message
...and it's Wrightbus. Three doors, two staircases, wtf? http://www.wrightbus.com/site/default.asp?CATID=9 http://www.tfl.gov.uk/corporate/medi...tre/13903.aspx Announcing it two days before Christmas while everyone's looking the other way does suggest it's not to be looked at too closely. There isn't even a sketch yet, let alone any costings. I note that it says, "The preferred manufacturer was chosen on Wednesday 23 December 2009, there will then be a 10 day standstill period. (This is a mandatory period required by the public procurement regulations between announcing the winner of a contract and the signing of the contract.)". Does this mean 10 working days, or 10 elapsed days? If the latter, one assumes that the xmas/new year holiday period was deliberately chosen to wrongfoot anyone who might be thinking of objecting. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Magic Wall at Farringdon | London Transport | |||
Rail Links with the Magic Kendom | London Transport | |||
Mmmmm I wonder ? | London Transport | |||
Massive Airport expansion announced | London Transport |