Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Hi all,
The new flyover over the A117 at Beckton is now open in both directions (five and a bit weeks after the westbound carriageway was finished), albeit only two lanes either way. Opened some time between Saturday lunchtime and Sunday evening. Old flyover virtually all gone now, save for a small section west of the junction, as of Saturday lunchtime. The Underpass under the A112 Prince Regent Lane is scheduled for 23rd November, but the bridge carrying the A112 over it opened on Saturday. East India Dock Link to Aspen Way scheduled for the end of November. Other works, subway linking New Barn St and Freemasons Rd (south of Plaistow) needs a bit of work, and the old w.bound track of the Canning Town flyover, which had two new lanes added in September (used by e.bound traffic) is out for refurbishment. More photos to be added soon to: http://groups.msn.com/TheSABRERoadsW...astlondon.msnw regards, Sunil -- |
#2
![]() |
|||
|
|||
![]() |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
A13 - Prince Regent Lane underpass now open | London Transport | |||
A13 - Beckton and Movers Lane pictures at SABRE website | London Transport | |||
A13 Beckton old flyover to be demolished in little over week | London Transport | |||
A13 Beckton (w/bound) flyover open today | London Transport | |||
A13 - Canning Town (new) Flyover virtually complete! | London Transport |