Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]() wrote in message ... On 10.02.10 11:30, Paul Scott wrote: Thinking about it, the whole question about what's happening on the NLL may be to do with the phased nature of the four tracking around Camden Town. Perhaps the final transfer to Upminster will only be done when the second phase of the work is complete, thinking back to discussions about the reducton of the scope because of the bridge repairs needed at Camden Town itself? What's that about Upminster? Upminster IECC (that's the NR signal centre there) eventually gets full signalling control of the NLL... Paul S |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Ian Jelf: Shameless Plug for Free Walk | London Transport | |||
Tram equivalent of "Ian's Bus Stop" | London Transport | |||
Studies in brown | London Transport | |||
Crossrail derailed by Gordon Brown | London Transport |