On Fri, 26 Feb 2010 20:55:11 +0000
Roland Perry wrote: was quite a bit of "hunting" in the drive system. Appeared not to be able to make its mind up between braking, coasting and even perhaps applying power. Is the braking regen? Sounds like someone accidentaly loaded the 1992 stock control software onto the system. Seriously though , is it really so difficult to write software to drive a train smoothly? B2003 |
#22
![]() |
|||
|
|||
![]()
In message , at 20:55:11 on Fri, 26 Feb
2010, Roland Perry remarked: I went to South Quay (and back) today. Something I forgot: Why do some of the stations have new looking "steps" installed halfway up the facing wall between the track and the platform edge? With "Do not step on this" (or similar) written on them. I can't remember ever seeing anything quite so much like a step, for not stepping on. -- Roland Perry |
#23
![]() |
|||
|
|||
![]() |
#24
![]() |
|||
|
|||
![]() "Alex" wrote in message ... A lot of site clearance has taken place near Pudding Mill Lane - I assume for Crossrail tunnel bores and DLR station moving. The cleared space is for Olympics' parking (it was cleaned in 2007-2008). I'd imagine it will be reused for Crossrail after 2012. Crossrail's website suggests the work [on the portal] will start in Jul 2009 and be completed by June 2012. AIUI the DLR station gets resited somewhat south of the existing position to allow for the new Crossrail tracks [which are in cut and cover as far as the River Lee], with the diverted up slow line into Liverpool St crossing over. Paul S |
#25
![]() |
|||
|
|||
![]()
On 27 Feb, 11:20, wrote:
On Fri, 26 Feb 2010 20:55:11 +0000 Roland Perry wrote: was quite a bit of "hunting" in the drive system. Appeared not to be able to make its mind up between braking, coasting and even perhaps applying power. Is the braking regen? Sounds like someone accidentaly loaded the 1992 stock control software onto the system. Seriously though , is it really so difficult to write software to drive a train smoothly? B2003 As I was saying elsewhere, they now seem to have got rid of the particularly violent deceleration half way out of Bank. |
#26
![]() |
|||
|
|||
![]()
On 25 Feb, 19:13, MIG wrote:
On 25 Feb, 09:59, Mudchute wrote: Saw a new 3 car train at Greenwich about 2330 last night but did see one formed of the old stock when they were doing passenger-less test operations a couple of months ago. I'm glad they've gone for variable stopping points at places like Mudchute northbound where there's only an entrance to the platform at the southern end. Anybody witnessed any panicky barging through the carriage at Cutty Sark yet? No. *As I was saying, announcement beforehand and extra staff on board in case. I got another one this evening; pretty sure it was a different unit and again the internal displays not working. This may be some kind of issue. Today I notice that the long trains still don't have internal displays. The extra staff aren't there any more, and there aren't announcements at the SDO stations. |
#27
![]() |
|||
|
|||
![]()
On 26 Feb, 13:11, MIG wrote:
On 26 Feb, 08:37, Martin Petrov wrote: On Thu, 25 Feb 2010 04:17:26 -0800, Mizter T wrote: I think the more interesting thing to observe has been what has already happened, i.e. the platform lengthening and how it has been done in various places. That, and observing that one has a bit more breathing space on peakDLR trains. Well yes - South Quay's opening and the dive under at West India Quay are the things that have impressed me the most. As a daily Stratford - Canary Wharf traveller, the dive under has made a big difference to getting through the final part of the journey, though I'd be interested to know when they're intending to put 3 cars on trains on that branch too - I know Pudding Mill Lane won't be able to handle them, but having done all the other stations, I'd be shocked if they weren't intending to roll them out along that line too? The other improvement that I'd like to see them do is to bring the 5 minute frequency on that section (at least at peak time) so that there's always a train waiting in Stratford - as it stands, the train comes into Stratford every 7-8 mins, and there's a scrum of people to get on board to get a seat - whereas when they had the 5 min frequency, a train would come into one platform, and sit there while people got on board, and as the next one pulled in, that one would pull out. There was a document, or was it an MR article? which listed all the stations coded by long from the start, extended and SDO. *I am sure that the SDO stations included some not on that route. My impression was that the whole of theDLRis capable of taking the long trains one way or another, whether or not the service actually runs. Cutty Sark is an obviously well-know station that couldn't be extended and they use SDO. Today the first time I've seen a long one running at the weekend. It could be just for the London Marathon weekend, but the staff seemed to think it could be part of preparation for a general extension (pardon the pun) of the use of long trains in terms of days of week and times of day. |
#28
![]() |
|||
|
|||
![]()
On 24 Apr, 17:55, MIG wrote:
On 26 Feb, 13:11, MIG wrote: On 26 Feb, 08:37, Martin Petrov wrote: On Thu, 25 Feb 2010 04:17:26 -0800, Mizter T wrote: I think the more interesting thing to observe has been what has already happened, i.e. the platform lengthening and how it has been done in various places. That, and observing that one has a bit more breathing space on peakDLR trains. Well yes - South Quay's opening and the dive under at West India Quay are the things that have impressed me the most. As a daily Stratford - Canary Wharf traveller, the dive under has made a big difference to getting through the final part of the journey, though I'd be interested to know when they're intending to put 3 cars on trains on that branch too - I know Pudding Mill Lane won't be able to handle them, but having done all the other stations, I'd be shocked if they weren't intending to roll them out along that line too? The other improvement that I'd like to see them do is to bring the 5 minute frequency on that section (at least at peak time) so that there's always a train waiting in Stratford - as it stands, the train comes into Stratford every 7-8 mins, and there's a scrum of people to get on board to get a seat - whereas when they had the 5 min frequency, a train would come into one platform, and sit there while people got on board, and as the next one pulled in, that one would pull out. There was a document, or was it an MR article? which listed all the stations coded by long from the start, extended and SDO. *I am sure that the SDO stations included some not on that route. My impression was that the whole of theDLRis capable of taking the long trains one way or another, whether or not the service actually runs. Cutty Sark is an obviously well-know station that couldn't be extended and they use SDO. Today the first time I've seen a long one running at the weekend. It could be just for the London Marathon weekend, but the staff seemed to think it could be part of preparation for a general extension (pardon the pun) of the use of long trains in terms of days of week and times of day. And I should have said routes. Seen a long one going to Tower Gateway yesterday as well. |
#29
![]() |
|||
|
|||
![]()
The platform departure boards were today saying that three car trains
were operating on all Bank to Lewisham services which is great news. It makes a massive difference especially in the morning peak - no more cramming onto the train at Mudchute or having to wait for a few trains to go by before I can squeeze on one. |
#30
![]() |
|||
|
|||
![]()
On 29 Apr, 00:27, Mudchute wrote:
The platform departure boards were today saying that three car trains were operating on all Bank to Lewisham services which is great news. It makes a massive difference especially in the morning peak - no more cramming onto the train at Mudchute or having to wait for a few trains to go by before I can squeeze on one. I saw long one heading east between Blackwall and Poplar today. I don't know for sure, but it had probably gone into service from Gallions Reach rather than come from Woolwich. If so it means that, even if only for certain shoulder peak journeys, they must be running long trains up and down the Beckton branch. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
3 Car DLR.... | London Transport | |||
London Overground Euston - Watford: 6 car trains? | London Transport | |||
A Car Is Ready For You - Used Car Auto Loans | London Transport | |||
How does new car on Jubilee trains affect performance? | London Transport | |||
DLR three car trains - City Airport extension | London Transport |