Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#2
![]() |
|||
|
|||
![]()
d wrote:
I read about this in wikipedia but is it actually going to happen? If so what will happen on sections where tube and sub surface stock run on the same track - ie raynors lane to uxbridge and acton town to ealing common. Will these sections be kept at 630V or will the piccadilly stock be able to handle 750V anyway? There is definitely a power supply upgrade going on, just announced he http://www.tfl.gov.uk/corporate/medi...tre/15249.aspx but they don't explicitly say they are raising the system voltages - it wouldn't necessarily follow anyway, the regulated voltage could stay the same but with a higher current draw being allowed. Related to this, there are apparently Network Rail projects going on at the moment to separate out all the mainline and 'tube' supplies where they are connected, to allow the NR third rail voltage to be raised to a standard 750 volts, and to allow regenerative braking. An example is the Waterloo and City, still fed off the SR for obvious historic reasons. What I'm wondering is that if LU adopted a 750 volt standard on the SSR, NR wouldn't necessarily need to do this - unless they want to have separate billing anyway - there's also practicalities such as isolations for maintenance. Paul S |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
West London Sub-Regional Transport Plan | London Transport | |||
New KXSP sub surface station | London Transport | |||
TfL / NLL / Metronet surface stock / tube stock / Croxley link | London Transport | |||
Upgrading GNER ticket to First Class | London Transport |