Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Why?
(The example I am thinking about is half way up Muswell Hill - both stops in both directions - but I've seen it done before) Martin |
#2
![]() |
|||
|
|||
![]()
On Thu, 27 Nov 2003 07:17:39 +0000, Martin Rich
wrote: Why? (The example I am thinking about is half way up Muswell Hill - both stops in both directions - but I've seen it done before) Martin Is the stop about to be moved? Rob. -- rob at robertwoolley dot co dot uk |
#3
![]() |
|||
|
|||
![]()
"Martin Rich" wrote in message
... Why? (The example I am thinking about is half way up Muswell Hill - both stops in both directions - but I've seen it done before) Martin This normally happens when road works are taking place, maybe just during the day, requiring the bus stop temporarily to be moved. At night, and at other times when it's not necessary, the temporary stop is put back in the place of the regular one. Lawrence Myers Remove the numbers to reply |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Lea Bridge station covered footbridge | London Transport | |||
Temporary closure of London Bridge Bus Station | London Transport | |||
Right that's Metrolink sorted - whose next? | London Transport | |||
Oxford Street temporary pedestrianisation | London Transport | |||
Covered walkways | London Transport |