As I understand it, the NLL (Stratford to Gospel Oak) will reopen but I
take it that there's going to be nothing huge delivered on June 1st to make it a huge deal? Other than some new platforms, and traveling on slightly different tracks, there will be no increase in service levels (still 4ph during the day, 3ph later in the evening?) and 3 car trains? (and the same naff weekend closures that we had before the blockade....?) Roll on 2011!! It will be VERY nice indeed when it's all finished, but until then.... |
#2
![]() |
|||
|
|||
![]()
On May 26, 9:27*am, Martin Petrov
wrote: As I understand it, the NLL (Stratford to Gospel Oak) will reopen but I take it that there's going to be nothing huge delivered on June 1st to make it a huge deal? Other than some new platforms, and traveling on slightly different tracks, there will be no increase in service levels (still 4ph during the day, 3ph later in the evening?) and 3 car trains? (and the same naff weekend closures that we had before the blockade....?) Roll on 2011!! It will be VERY nice indeed when it's all finished, but until then.... IIRC the NLL was closed for enabling works. I think the Hampstead Tunnels are being enlarged for bigger containers. And, also the AC tracks are being moved to take over the northern most pair east of Camden road, thus leaving room for the ELL extension to Highbury and Islington. Can anyone confirm? Cueing Mizter T. :-) |
#3
![]() |
|||
|
|||
![]()
On 26 May, 17:38, E27002 wrote:
On May 26, 9:27*am, Martin Petrov wrote: As I understand it, the NLL (Stratford to Gospel Oak) will reopen but I take it that there's going to be nothing huge delivered on June 1st to make it a huge deal? Other than some new platforms, and traveling on slightly different tracks, there will be no increase in service levels (still 4ph during the day, 3ph later in the evening?) and 3 car trains? (and the same naff weekend closures that we had before the blockade....?) Roll on 2011!! It will be VERY nice indeed when it's all finished, but until then.... IIRC the NLL was closed for enabling works. *I think the Hampstead Tunnels are being enlarged for bigger containers. *And, also the AC tracks are being moved to take over the northern most pair east of Camden road, thus leaving room for the ELL extension to Highbury and Islington. Can anyone confirm? *Cueing Mizter T. *:-) I think that was the plan, since the ELL would merge with the NLL alignment from the south. |
#4
![]() |
|||
|
|||
![]()
E27002 wrote:
IIRC the NLL was closed for enabling works. I think the Hampstead Tunnels are being enlarged for bigger containers. The Hampstead tunnel gauge clearance was completed during 2008. They are nothing to do the current NLL work, which is all east of Gospel Oak, on the Stratford route... Paul S |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
ELL/NLL interchange | London Transport | |||
NLL Closure / DLR to Stratford International | London Transport | |||
Will Oyster PP be valid on the NLL ? | London Transport | |||
TfL / NLL / Metronet surface stock / tube stock / Croxley link | London Transport | |||
NLL via Crossrail tunnels | London Transport |