Default Stratford platform 3a

On 2 Aug, 15:37, wrote:
On 31 July, 16:08, "Dr. Sunil" wrote:

As of this morning, a lot of the clutter and barricades (platform
side) had been removed from the new Central westbound platform (3a),
though the concourse accesses were still blocked off by hoardings.
Anyone know when it will open?


So, how many platforms will Stratford have when completed? *They now
seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and
10a need to be added, making 19 in total, serving 18 tracks; is that
correct? *Quite a change from when I first got to know the station in
the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other
than occasional use. *Even 1 and 2 were only used by the little-known
service from north Woolwich to Tottenham Hale.

Does anybody know when platforms 12 and the old 13 were closed, and
the part of the subway leading to them was bricked up? *When the old
subway was being cleaned up, the wall removed and the steps up to the
platform re-built an old poster frame had been dragged out of one of
the doorways leading off this subway, along with some rotten wood, and
there was the remains of a timetable on it, which listed a few trains
to Hertford East from platform 12, but I couldn't see any date on it.
I always knew that the station, and the area in general, was going to
see a change in its fortunes. *The station really was in a terrible
state at that time, despite the fact that it was only about 25 years
since the last refurbishment fot the Central Line extension and the
Shenfield electrification.


1 and 2 London Overground
3, 3a and 6 Central line (3 and 3a same track)
4a and 4b DLR via Bow Church
5 and 8 Shenfield services
9 and 10 Mainline services (beyond Shenfield)
(10a not used except during engineering works?)
11 and 12 Tottenham Hale/Stansted services
13, 14 and 15 Jubilee line
16 and 17 DLR Stratford International/West Ham

18 platforms in regular service, serving 17 tracks, with a 19th
platform serving an 18th track in occasional use

(actually are both DLR platform 4s in regular use?)
  #2   Report Post  
Old August 2nd 10, 03:04 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Stratford platform 3a



"Dr. Sunil" wrote in message
news:62d5b9a7-28be-4111-bbba-

(actually are both DLR platform 4s in regular use?)


Yes - 4a and 4b seem to be used alternately in the normal weekday
timetable.

Paul S

  #3   Report Post  
Old August 2nd 10, 04:49 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2009
Posts: 120
Default Stratford platform 3a

On Mon, 02 Aug 2010 16:04:21 +0100, Paul Scott wrote:

"Dr. Sunil" wrote in message
news:62d5b9a7-28be-4111-bbba-

(actually are both DLR platform 4s in regular use?)


Yes - 4a and 4b seem to be used alternately in the normal weekday
timetable.

Paul S


Yes, during the day (though frustratingly, not at the peak) there's a 5
minute interval service where one train pulls into one platform, and
another train pulls out of the other platform, which means that there's
always a train in the station, and no mad rush for seats with people
trying to get on while people are getting off.

I think I'm right in saying that during those times, there's only service
as far as Canary Wharf when running this system.
  #4   Report Post  
Old August 2nd 10, 10:30 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 110
Default Stratford platform 3a

On 2 Aug, 15:44, "Dr. Sunil" wrote:
On 2 Aug, 15:37, wrote:



On 31 July, 16:08, "Dr. Sunil" wrote:


As of this morning, a lot of the clutter and barricades (platform
side) had been removed from the new Central westbound platform (3a),
though the concourse accesses were still blocked off by hoardings.
Anyone know when it will open?


So, how many platforms will Stratford have when completed? *They now
seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and
10a need to be added, making 19 in total, serving 18 tracks; is that
correct? *Quite a change from when I first got to know the station in
the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other
than occasional use. *Even 1 and 2 were only used by the little-known
service from north Woolwich to Tottenham Hale.


Does anybody know when platforms 12 and the old 13 were closed, and
the part of the subway leading to them was bricked up? *When the old
subway was being cleaned up, the wall removed and the steps up to the
platform re-built an old poster frame had been dragged out of one of
the doorways leading off this subway, along with some rotten wood, and
there was the remains of a timetable on it, which listed a few trains
to Hertford East from platform 12, but I couldn't see any date on it.
I always knew that the station, and the area in general, was going to
see a change in its fortunes. *The station really was in a terrible
state at that time, despite the fact that it was only about 25 years
since the last refurbishment fot the Central Line extension and the
Shenfield electrification.


1 and 2 London Overground
3, 3a and 6 Central line (3 and 3a same track)
4a and 4b DLR via Bow Church
5 and 8 Shenfield services
9 and 10 Mainline services (beyond Shenfield)
(10a not used except during engineering works?)
11 and 12 Tottenham Hale/Stansted services
13, 14 and 15 Jubilee line
16 and 17 DLR Stratford International/West Ham

18 platforms in regular service, serving 17 tracks, with a 19th
platform serving an 18th track in occasional use

(actually are both DLR platform 4s in regular use?)


How are the platforms at Internationaal numbered/lettered?
  #5   Report Post  
Old August 5th 10, 11:38 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 197
Default Stratford platform 3a

On 2 Aug, 23:30, wrote:
On 2 Aug, 15:44, "Dr. Sunil" wrote:



On 2 Aug, 15:37, wrote:


On 31 July, 16:08, "Dr. Sunil" wrote:


As of this morning, a lot of the clutter and barricades (platform
side) had been removed from the new Central westbound platform (3a),
though the concourse accesses were still blocked off by hoardings.
Anyone know when it will open?


So, how many platforms will Stratford have when completed? *They now
seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and
10a need to be added, making 19 in total, serving 18 tracks; is that
correct? *Quite a change from when I first got to know the station in
the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other
than occasional use. *Even 1 and 2 were only used by the little-known
service from north Woolwich to Tottenham Hale.


Does anybody know when platforms 12 and the old 13 were closed, and
the part of the subway leading to them was bricked up? *When the old
subway was being cleaned up, the wall removed and the steps up to the
platform re-built an old poster frame had been dragged out of one of
the doorways leading off this subway, along with some rotten wood, and
there was the remains of a timetable on it, which listed a few trains
to Hertford East from platform 12, but I couldn't see any date on it.
I always knew that the station, and the area in general, was going to
see a change in its fortunes. *The station really was in a terrible
state at that time, despite the fact that it was only about 25 years
since the last refurbishment fot the Central Line extension and the
Shenfield electrification.


1 and 2 London Overground
3, 3a and 6 Central line (3 and 3a same track)
4a and 4b DLR via Bow Church
5 and 8 Shenfield services
9 and 10 Mainline services (beyond Shenfield)
(10a not used except during engineering works?)
11 and 12 Tottenham Hale/Stansted services
13, 14 and 15 Jubilee line
16 and 17 DLR Stratford International/West Ham


18 platforms in regular service, serving 17 tracks, with a 19th
platform serving an 18th track in occasional use


(actually are both DLR platform 4s in regular use?)


How are the platforms at Internationaal numbered/lettered?


The mainline station platforms are numbered 1 to 4. Two extra fast
tracks, not served by any platforms, pass through in between the
tracks with platforms. A seventh track rises up in between platforms 2
and 3 to access Temple Mills Depot to the northeast of the station.

I presume the DLR station, being in a separate building, will have its
own numbers/letters (probably the latter?).


  #6   Report Post  
Old August 5th 10, 02:21 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 110
Default Stratford platform 3a

On 5 Aug, 12:38, "Dr. Sunil" wrote:

I presume the DLR station, being in a separate building, will have its
own numbers/letters (probably the latter?).- Hide quoted text -


Separate building? Couldn't they have built the main station to take
the DLR as well?
  #7   Report Post  
Old August 5th 10, 02:42 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Stratford platform 3a



wrote in message
...
On 5 Aug, 12:38, "Dr. Sunil" wrote:

I presume the DLR station, being in a separate building, will have its
own numbers/letters (probably the latter?).- Hide quoted text -


Separate building? Couldn't they have built the main station to take
the DLR as well?


The decision to run the DLR beyond Stratford had probably not been made when
the International station was being designed? The latter was finished about
3 years ago, when they had only just got round to the NLL closure for update
to DLR, and the DLR track's general direction was constrained by being where
the old low level NLL had been.

I'm not so sure about running the DLR into the same building either - as
most of it sits over the station box, and it has pedestrian access at both
ends?

Paul S

  #8   Report Post  
Old August 5th 10, 02:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default Stratford platform 3a

On Thu, 5 Aug 2010 15:42:04 +0100
"Paul Scott" wrote:
The decision to run the DLR beyond Stratford had probably not been made when
the International station was being designed? The latter was finished about
3 years ago, when they had only just got round to the NLL closure for update
to DLR, and the DLR track's general direction was constrained by being where
the old low level NLL had been.


Am I the only one who thinks the DLR is big enough already given its
limited design specifications? Its already one hell of a shlep from bank
to city airport on trains which barely seem to get above 25mph these days.
If it wants to become a proper metro it'll need proper trains and not
have stations almost as often as bus stops.

B2003


  #9   Report Post  
Old August 5th 10, 03:17 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 197
Default Stratford platform 3a

On 5 Aug, 15:56, wrote:
On Thu, 5 Aug 2010 15:42:04 +0100

"Paul Scott" wrote:
The decision to run the DLR beyond Stratford had probably not been made when
the International station was being designed? *The latter was finished about
3 years ago, when they had only just got round to the NLL closure for update
to DLR, and the DLR track's general direction was constrained by being where
the old low level NLL had been.


Space could be provided above the mainline tracks using a covered way,
but it'll be tight squeeze coming off the former NLL alignment.

Am I the only one who thinks the DLR is big enough already given its
limited design specifications? Its already one hell of a shlep from bank
to city airport on trains which barely seem to get above 25mph these days..
If it wants to become a proper metro it'll need proper trains and not
have stations almost as often as bus stops.

B2003


I cannot understand the close spacing between West India Quay*/Canary
Wharf/Heron Quays. One any other railway they'd have just built Canary
Wharf (longer platforms perhaps), with additional accesses north and
south across each Quay. (*even more so given the skip-stop service on
some Bank-Lewisham service (peaks?)).
  #10   Report Post  
Old August 5th 10, 02:54 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 2,029
Default Stratford platform 3a



wrote in message
...
On 5 Aug, 12:38, "Dr. Sunil" wrote:

I presume the DLR station, being in a separate building, will have its
own numbers/letters (probably the latter?).- Hide quoted text -


Separate building? Couldn't they have built the main station to take
the DLR as well?


The decision to run the DLR beyond Stratford had probably not been made when
the International station was being designed? The latter was finished about
3 years ago, when they had only just got round to the NLL closure for update
to DLR, and the DLR track's general approach was constrained by being where
the old low level NLL had been.

AIUI an approach on the surface on the north side of the HS1 station box was
the only sensible option, as there are buildings on the south side, and
therefore the DLR also had to rise to the surface before crossing HS1

I'm not so sure about running the DLR into the same building either - as
most of it sits over the station box, and it has pedestrian access at both
ends? Also - is the DLR's primary role to feed the international station,
or the housing development to the north, ie the Olympic Village in legacy
mode?

Paul S



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Central Line platform at Stratford Martin Petrov[_2_] London Transport 1 May 8th 10 11:46 AM
Stratford Regional-Stratford Intl on DLR Mark Morton London Transport 7 April 8th 10 03:31 PM
Stratford platform changes Walter Briscoe London Transport 10 December 16th 08 08:58 PM
Stratford platform widening Tim Roll-Pickering London Transport 2 September 3rd 07 07:25 PM
No platform adverts at St Paul's Vic London Transport 2 August 1st 03 03:48 PM


All times are GMT. The time now is 02:03 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017