Default Stratford platform 3a

On 6 Aug, 03:36, "Dr. Sunil" wrote:

According to Wiki:
"Canary Wharf station had been part of the original DLR plans, but
when the system opened in August 1987 the station was not ready.


I don't think I agree with this; as far as could be seen it was
complete, lighting, signs etc. were all installed. I can't be certain
as to whether things like commissioning of the lifts was complete, but
it not I think it would only have been because it had been decided
that the station would not open, and therefore final works had been
abandoned. It looked finished.

[5] It was originally planned that the station would be similar to the
original station at Heron Quays, with two small platforms either side
of the tracks. It soon became apparent that the Canary Wharf
development would produce demand well above the capacity of a simple
station. On 17 July 1987 (over a month before the DLR opened to the
public) a contract was awarded to GEC-Mowlem Railway Group to rebuild
the station into the considerably more elaborate and spacious design
that exists today. It was opened in November 1991.[5]"


This all sounds right. It was announced that the station would not
open due to the Canary Wharf development being given the go-ahead,
this had been in doubt until shortly before the DLR opened, and the
station therefore being in the middle of a building site for the next
few years. As I rote before, trains did actually stop at this 'ghost'
station for some time, untill it was removed from the control
software; I can't remember when this happened. The whole station area
was totally re-built; the platforms were demolished, the two original
tracks meerged into one, and an extra track added on each side, to
give the present three track, six platform layout.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Central Line platform at Stratford Martin Petrov[_2_] London Transport 1 May 8th 10 11:46 AM
Stratford Regional-Stratford Intl on DLR Mark Morton London Transport 7 April 8th 10 03:31 PM
Stratford platform changes Walter Briscoe London Transport 10 December 16th 08 08:58 PM
Stratford platform widening Tim Roll-Pickering London Transport 2 September 3rd 07 07:25 PM
No platform adverts at St Paul's Vic London Transport 2 August 1st 03 03:48 PM


All times are GMT. The time now is 12:51 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017