Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#6
![]() |
|||
|
|||
![]() "Recliner" wrote: "Mizter T" wrote: The 'official' terminology used by the DLR/ TfL (for better or for worse) refers to an individual articulated vehicle as a "carriage", so the long trains are "three-carriage trains" - see: http://developments.dlr.co.uk/enhanc...city/index.asp That said it's easy enough to work out what someone is talking about if they were to refer to 2-car, 3-car, 4-car or 6-car DLR trains. You and I may think it's clear enough, but Railway Herald managed to get totally confused, and announced that the extended DLR trains consisted of two, three-segment vehicles, rather than three two-segment vehicles. In other words, they thought that the extension consisted of new intermediate trailer segments (which have left the trains severely under-powered). And I also remember a discussion here about whether the trains were even articulated. I think I'll pass on travelling on a non-articulated vehicle on the DLR - the result could be rather messy! |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
DLR Canning Town Stratford International - still not opened ... | London Transport | |||
Canning Town - Stratford DLR fares | London Transport | |||
Canning Town DLR flyover now open | London Transport | |||
Work to start on DLR from Canning Town to Stratford International | London Transport | |||
Canning Town DLR junctions | London Transport |