Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() |
#2
![]() |
|||
|
|||
![]() Clive The new timetable from 4 Jan should bring back the resumption of the 2 minute service to Morden, but it won't give through City-Barnet branch services. I'm assuming that there will be the normal level of CX trains to Morden as there was in TT48. I'm still waiting for the new timetables to arrive, then I can check. Roger I now have the timetable (TT 20/04) and there are frequent CX trains to Morden - about every 12 minutes off peak and about every 6 minutes peak. There is a 2-2½ minute service Kennington to Morden. The original timetable 48 with through running City - Barnet branch may be resumed as early as Sun 18 January. Roger |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Getting from Finchley to Bank with no Northern Line | London Transport | |||
Normal Northern Line service not resuming this week + pictures | London Transport | |||
Northern Line | London Transport | |||
Northern Line - again! | London Transport | |||
Northern line emergency engineering | London Transport |