Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]()
On Fri, 11 Feb 2011 07:00:45 -0800 (PST)
Roy Stilling wrote: I thought they were lifting the track, at least through Barbican. They'd reached the tunnel mouth at the end of the platform when I was last there at the start of January. AFAIK they lifted it near farringdon to build that works ramp but last time I was at Barbican - which admittedly was about 6 months back - it was all still in situ. Perhaps thats changed, though the scrap value of the track surely can't be worth the hassle of lifting it now theres no rail connection to that branch. B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Do any southbound DLR trains terminate at Mudchute these days? | London Transport | |||
Met line reliability these days | London Transport | |||
Whats happening on the Aldgate branch these days? | London Transport | |||
Are We Too Politically Correct These Days? | London Transport | |||
Why is the Victoria line so hot these days? | London Transport |