Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Friday 2nd of January - do they have engineering works or something as
services don't seem to be running (northbound) through to Kings Cross when I check the timetable online. How much extra time will I have to add on to my journey if I have to go to Victoria instead and take the tube? I know there are timetables online, but they don't hold the tube times and add on way to much time for the connection. Marcus |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Exciting news on Thameslink 2000 (now "Thameslink Project") | London Transport |