![]() "cj" wrote Do 2 Chiltern trains an hour really necessitate the suspension of the Greenford trains (AFAIK they weren't even running up that branch, but turning off at Acton?) Could FGW not have run a Hayes/Hanwell- Greenford service (as they have done before e.g. Ladbroke Grove/lorry- v-train incident at West Ealing)? Much of Old Oak Common West Junction to Northolt Junction is single track, and the permitted speed is pretty low (40 mph?). So it's almost certainly necessary for a proportion of the Chiltern trains to be routed via Drayton Green. They will also take up Relief Line paths between West Ealing and Paddington, and occupy platforms at Paddington. It does however seem that Network Rail and fGW have given up too easily, and it should certainly be easier to find out what's going on. The walk from West Ealing to Drayton Green isn't actually all that far. Peter |
#2
![]() |
|||
|
|||
![]()
On Aug 15, 10:22*pm, "Peter Masson" wrote:
"cj" wrote Do 2 Chiltern trains an hour really necessitate the suspension of the Greenford trains (AFAIK they weren't even running up that branch, but turning off at Acton?) Could FGW not have run a Hayes/Hanwell- Greenford service (as they have done before e.g. Ladbroke Grove/lorry- v-train incident at West Ealing)? Much of Old Oak Common West Junction to Northolt Junction is single track, and the permitted speed is pretty low (40 mph?). So it's almost certainly necessary for a proportion of the Chiltern trains to be routed via Drayton Green. They will also take up Relief Line paths between West Ealing and Paddington, and occupy platforms at Paddington. It does however seem that Network Rail and fGW have given up too easily, and it should certainly be easier to find out what's going on. The walk from West Ealing to Drayton Green isn't actually all that far. Peter I was under the impression that the Chiltern diversions were turning off at Acton and not actually running up the Greenford line at all. As you say, it's not a long walk at all from West Ealing (or indeed Hanwell), but if I was a regular user of, say, South Greenford* I would be a bit more annoyed. It still smacks of FGW giving up though. ~cj * -was it South Greenford that had a platform collapse down an embankment a good few years ago, which took an age for FGW/NR to fix? |
#3
![]() |
|||
|
|||
![]() "cj" wrote * -was it South Greenford that had a platform collapse down an embankment a good few years ago, which took an age for FGW/NR to fix? It was. For ages [1] only down trains called, and there was a lengthy 5 mph speed restriction [1] The stop was omitted on up trains in timetables from 1995 - 1999 inclusive. Passengers from South Greenford towards Ealing Broadway and Paddington were advised to travel via Greenford. For a time in the mid-1980s off-peak trains did not call at Drayton Green, as they tried to run a half-hourly shuttle between Greenford and Ealing Broadway with one unit (presumably in those days a bubblecar. In 1967 the off-peak service was only hourly. In the peaks the bubblecars were strengthened with a 'Drive End Trailer', but the set which operated the off-peak trains left its Trailer in the Ealing Broadway reversing siding, attaching it again for the evening peak. Peter |
#4
![]() |
|||
|
|||
![]()
On Aug 15, 10:22*pm, "Peter Masson" wrote:
"cj" wrote Do 2 Chiltern trains an hour really necessitate the suspension of the Greenford trains (AFAIK they weren't even running up that branch, but turning off at Acton?) Could FGW not have run a Hayes/Hanwell- Greenford service (as they have done before e.g. Ladbroke Grove/lorry- v-train incident at West Ealing)? Much of Old Oak Common West Junction to Northolt Junction is single track, and the permitted speed is pretty low (40 mph?). So it's almost certainly necessary for a proportion of the Chiltern trains to be routed via Drayton Green. They will also take up Relief Line paths between West Ealing and Paddington, and occupy platforms at Paddington. It does however seem that Network Rail and fGW have given up too easily, and it should certainly be easier to find out what's going on. The walk from West Ealing to Drayton Green isn't actually all that far. Peter I went that way on Saturday and a half-hourly service was running from Paddington to the Chiltern line, with all trains using the direct line via Park Royal. I agree that a combination of the single line and low linespeed precludes more than 2 tph that way but if that can run on a Saturday, then the only thing that is different on a weekday seems to be the availability of paths between Old Oak West and Paddington. The weekday Chiltern service shows 2 tph running non-stop from Paddington to Gerrards Cross in about 30 mins, which tallies with running on the direct line. Here's a shot of one such train at North Acton: http://www.flickr.com/photos/6053903...in/photostream And for nostalgia's sake, here's what you would have seen once a day at North Acton in 1984: http://www.flickr.com/photos/6053903...57626998739154 |
#5
![]() |
|||
|
|||
![]() "The Gardener" wrote And for nostalgia's sake, here's what you would have seen once a day at North Acton in 1984: http://www.flickr.com/photos/6053903...57626998739154 though in its last years that one remaining loco-hauled train between Paddington and the Chiltern Line ran via Drayton Green on Saturdays, as Park Royal box was switched out. Peter |
#6
![]() |
|||
|
|||
![]()
On 15/08/2011 23:06, The Gardener wrote:
And for nostalgia's sake, here's what you would have seen once a day at North Acton in 1984: http://www.flickr.com/photos/6053903...57626998739154 Once upon a time that was Castle class working, seen at Beaconsfield on a summer's evening in 1962 hauled by 5026 Criccieth Castle: www.greywall.demon.co.uk/rail/A055.tif -- Graeme Wall This account not read, substitute trains for rail. Railway Miscellany at www.greywall.demon.co.uk/rail |
#7
![]() |
|||
|
|||
![]()
On Aug 15, 11:06*pm, The Gardener wrote:
On Aug 15, 10:22*pm, "Peter Masson" wrote: "cj" wrote Do 2 Chiltern trains an hour really necessitate the suspension of the Greenford trains (AFAIK they weren't even running up that branch, but turning off at Acton?) Could FGW not have run a Hayes/Hanwell- Greenford service (as they have done before e.g. Ladbroke Grove/lorry- v-train incident at West Ealing)? Much of Old Oak Common West Junction to Northolt Junction is single track, and the permitted speed is pretty low (40 mph?). So it's almost certainly necessary for a proportion of the Chiltern trains to be routed via Drayton Green. They will also take up Relief Line paths between West Ealing and Paddington, and occupy platforms at Paddington. It does however seem that Network Rail and fGW have given up too easily, and it should certainly be easier to find out what's going on. The walk from West Ealing to Drayton Green isn't actually all that far. Peter I went that way on Saturday and a half-hourly service was running from Paddington to the Chiltern line, with all trains using the direct line via Park Royal. I agree that a combination of the single line and low linespeed precludes more than 2 tph that way but if that can run on a Saturday, then the only thing that is different on a weekday seems to be the availability of paths between Old Oak West and Paddington. The weekday Chiltern service shows 2 tph running non-stop from Paddington to Gerrards Cross in about 30 mins, which tallies with running on the direct line. Here's a shot of one such train at North Acton: http://www.flickr.com/photos/6053903...in/photostream And for nostalgia's sake, here's what you would have seen once a day at North Acton in 1984: http://www.flickr.com/photos/6053903.../set-721576269... Note the awfully-polite graffiti too as a sign of the times: "[unclear] is an ugly mug", what an insult! Nick |
#8
![]() |
|||
|
|||
![]()
On Tue, 16 Aug 2011, Nick wrote:
On Aug 15, 11:06*pm, The Gardener wrote: And for nostalgia's sake, here's what you would have seen once a day at North Acton in 1984: http://www.flickr.com/photos/6053903.../set-721576269... Note the awfully-polite graffiti too as a sign of the times: "[unclear] is an ugly mug", what an insult! "Batho" - you can make the picture embiggen substantially if you click in the right places. That's probably Batho Lane, brother of Bollo. tom -- Freedom, Beauty, Truth, and Love! |
#9
![]() |
|||
|
|||
![]()
On Mon, 15 Aug 2011 22:22:34 +0100, Peter Masson
wrote: "cj" wrote Do 2 Chiltern trains an hour really necessitate the suspension of the Greenford trains (AFAIK they weren't even running up that branch, but turning off at Acton?) Could FGW not have run a Hayes/Hanwell- Greenford service (as they have done before e.g. Ladbroke Grove/lorry- v-train incident at West Ealing)? Much of Old Oak Common West Junction to Northolt Junction is single track, and the permitted speed is pretty low (40 mph?). So it's almost certainly necessary for a proportion of the Chiltern trains to be routed via Drayton Green. They will also take up Relief Line paths between West Ealing and Paddington, and occupy platforms at Paddington. It does however seem that Network Rail and fGW have given up too easily, and it should certainly be easier to find out what's going on. The walk from West Ealing to Drayton Green isn't actually all that far. Peter On Sunday, all trains were using the direct line and the Greenford branch was out of use, with stop boards at the junctions around Greenford. As the Paddington - West Ruislip time is only 21-22 minutes, trains were either passing on the double track section between Park Royal and Greenford West Junction (which runs for just over 2 1/2 miles in the middle of the otherwise single track 7 mile long section) or between Paddington and Old Oak Common West Junction. Services were running to at 20/40 minute interval out of Paddington and a 24/36 minute interval into Paddington. A similar pattern seems possible with the weekday 30 minute frequency and it does look like FGW/Network Rail just can't be bothered to either run into Acton Yard or to run round the west curve to Hanwell (or Hayes) to reverse. -- Using Opera's revolutionary email client: http://www.opera.com/mail/ |
#10
![]() |
|||
|
|||
![]()
On Aug 16, 12:47*am, andypurk wrote:
On Mon, 15 Aug 2011 22:22:34 +0100, Peter Masson * wrote: "cj" wrote Do 2 Chiltern trains an hour really necessitate the suspension of the Greenford trains (AFAIK they weren't even running up that branch, but turning off at Acton?) Could FGW not have run a Hayes/Hanwell- Greenford service (as they have done before e.g. Ladbroke Grove/lorry- v-train incident at West Ealing)? Much of Old Oak Common West Junction to Northolt Junction is single * track, and the permitted speed is pretty low (40 mph?). So it's almost * certainly necessary for a proportion of the Chiltern trains to be routed * via Drayton Green. They will also take up Relief Line paths between West * Ealing and Paddington, and occupy platforms at Paddington. It does * however seem that Network Rail and fGW have given up too easily, and it * should certainly be easier to find out what's going on. The walk from West Ealing to Drayton Green isn't actually all that far. Peter On Sunday, all trains were using the direct line and the Greenford branch * was out of use, with stop boards at the junctions around Greenford. As the * Paddington - West Ruislip time is only 21-22 minutes, trains were either * passing on the double track section between Park Royal and Greenford West * Junction (which runs for just over 2 1/2 miles in the middle of the * otherwise single track 7 mile long section) or between Paddington and Old * Oak Common West Junction. Services were running to at 20/40 minute * interval out of Paddington and a 24/36 minute interval into Paddington. A * similar pattern seems possible with the weekday 30 minute frequency and it * does look like FGW/Network Rail just can't be bothered to either run into * Acton Yard or to run round the west curve to Hanwell (or Hayes) to reverse. -- Using Opera's revolutionary email client:http://www.opera.com/mail/ The presence of stop boards implies something was going on. One wonders that in the absence of paths, and given the opportunity presented by a two-week blockade, if TPTB have decided to take the opportunity to do some major renewals on the branch. |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Next week's Tube strikes (last week of June) are off | London Transport | |||
Barking-Greenford? | London Transport | |||
Sightseeing in Greenford | London Transport | |||
Trackbashers alert ( was Greenford Branch - two collisions today?) | London Transport | |||
Parking near Greenford | London Transport |