London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old August 21st 11, 12:58 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2008
Posts: 18
Default Stadler's won the tender to provide six new trams for Croydonarea

On 20/08/2011 22:46, Paul Corfield wrote:

The only bus service that was really affected by Tramlink was the 54
which was explicity reduced in scope because the Tram provided the
onward link.


The 130 was also affected. Instead of a double-decker every 5 minutes or
so from West Croydon to New Addington it is now a single-decker from
Norwood Junction to New Addington, every 15-20 minutes.

--
John Ray
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
My company provide most popular of the shoes model, bag, clothes,Bikini swimwear, sunglasses and watch of etc.. [email protected] London Transport 1 October 5th 23 02:18 PM
New Croydon trams. [email protected] London Transport 5 November 18th 15 09:14 PM
Thieves stole SIX MILES of copper wiring worth £700,000 CJB London Transport 4 February 1st 13 05:45 PM
Another six months of closures on Jubilee line to finish botched upgrade - Evening Standard Bruce[_2_] London Transport 15 November 25th 09 09:37 PM
Re-instating Lines to Relieve Congestion and Provide Capacity 1506 London Transport 0 October 30th 08 08:41 PM


All times are GMT. The time now is 03:54 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017