London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old October 15th 11, 06:21 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2006
Posts: 87
Default Baker St.(Met) and Met operations

On Oct 15, 5:07*pm, allantracy wrote:
Not sure of the exact proportion, or where from, but yes several Met
services every hour terminate at Baker Street - it may be close to a
third.


Sure, but I'm presuming that they terminate in the dead-end platforms.
What I'm wondering is whether the two "through" platforms *can* be
used for terminating trains (e.g. if services were temporarily
suspended between Baker St. and Aldgate).

I always find Baker St to be a bit of a pain, changing and traveling
onwards eastbound, trying to second guess which platform is going to
have the next service.


Agreed. Paddington can also be a bit irksome. If you're not heading to/
from the mainline station but travelling from say King's Cross you've
the option of changing trains at Edgware Road and getting a convenient
exit at Pad or travelling on a through train which decants you at the
back of beyond in the main station.

--
gordon
  #2   Report Post  
Old October 15th 11, 07:21 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: May 2010
Posts: 81
Default Baker St.(Met) and Met operations

On Oct 15, 7:21*pm, " wrote:
On Oct 15, 5:07*pm, allantracy wrote:

Not sure of the exact proportion, or where from, but yes several Met
services every hour terminate at Baker Street - it may be close to a
third.


Sure, but I'm presuming that they terminate in the dead-end platforms.
What I'm wondering is whether the two "through" platforms *can* be
used for terminating trains (e.g. if services were temporarily
suspended between Baker St. and Aldgate).


Yes, seen that done, it may still happen when the service thins out in
the evening hours.

However, during the normal daytime timetable the through platforms
can't be left occupied long enough for a terminating train and the
bays are used instead.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
What was this in Baker Street? Tristán White London Transport 1 December 5th 06 08:31 PM
Help- access to Jubilee line at Baker St Ken W London Transport 6 May 15th 06 02:27 AM
Strange operations at Edgware Road tonight Colin Rosenstiel London Transport 1 April 7th 05 12:21 PM
'Structrual damage' at Baker Street AM Friday 11th Feb Martin J London Transport 4 February 14th 05 06:10 PM
Baker St. Bakerloo and Jubilee Matthew P Jones London Transport 4 October 2nd 03 07:25 AM


All times are GMT. The time now is 08:08 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017