Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#15
![]() |
|||
|
|||
![]() wrote in message ... Do the platforms at Baker St. which are used by Met trains heading to/ from Aldgate ever get used for trains which terminate at Baker St.? Are all the Met platforms at Baker St. used fairly intensively or is there capacity for a train to be stabled out of use when defective or as a stand-by? Do trains stick to Aldgate or "non-Aldgate" services for most of the day or do they interwork between the two? What determines which diagrams will be allocated "A Stock" and which "S Stock"? Does the Chesham branch work better as a "through" service or should it have been left as a shuttle? -- gordon At the moment the off peak services tend to be self contained. Amersham/Chesham fast services (four per hour) tend to terminate in the north bay at Baker St. The Watford services (six per hour) terminate in the bay south of the through lines. The Uxbridge services (six per hour) run through to Aldgate. From December the off peak timetable is being rewritten. From memory there will be eight trains per hour from Uxbridge and eight from Moor Park, the latter split into four from Watford, two from Amersham and two from Chesham. Some trains will run through to Aldgate (from all destinations) while others will terminate at Baker Street. There will also be inter working between routes. John |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
What was this in Baker Street? | London Transport | |||
Help- access to Jubilee line at Baker St | London Transport | |||
Strange operations at Edgware Road tonight | London Transport | |||
'Structrual damage' at Baker Street AM Friday 11th Feb | London Transport | |||
Baker St. Bakerloo and Jubilee | London Transport |